PAGE 1 Show Image
         Urban Water Management Plan

                    for


    Padre Dam Municipal Water District









               December 1995


                Prepared by:


                Lesley Robin
      Public Information Representative
     Padre Dam Municipal Water District
              P. 0. Box 719003
        Santee, California 92072-9003
               (619) 448-3111
             FAX (619) 449-9469

PAGE 2 Show Image

PAGE 3 Show Image
                 Urban Water Management Plan
                            1995

                          CONTENTS

INTRODUCTION


CHAPTER 1


CHAPTER 2


CHAPTER 3


CHAPTER 4


APPENDIX

California Urban Water Conservation Council
Best Management Practices, Tholesale Agency Report, 1994-95

California Urban Water Conservation Council
Best Management Practices, Retail Agency Report, 1994-95

California Urban Water Management Planning Act

District Rules and Regulations, Section 5, Water Supply System
(staff recommended draft)

Ordinance 89-13, Water Reclamation, PDMWD

Ordinance 91-5, Water Conservation Plan, PDMWD

Ordinance 91-6, Restrictions on Water Supplies, CWA

Ordinance 91-91, MOU for Urban Water Conservation, PDMWD

Ordinance 94-13, Water Commodity Rates, Santee area, PDMWD
(includes Ordinance 93-15, Water Use Allowances)

Ordinance 94-14, Water Commodity Rates, Eastern area, PDMWD
(includes Ordinance 93-15, Water Use Allowances)

Ordinance 95-5, Reclaimed Water Rates, PDMWD

PAGE 4 Show Image

PAGE 5 Show Image
INTRODUCTION

PAGE 6 Show Image

PAGE 7 Show Image
                          INTRODUCTION


Format of Report

The chapters in this report correspond to the outline of the
Urban Water Management Planning Act, California Water Code,
Division 6, Part 2.6 Urban Water Management Planning. A copy of
the Act is included in the Appendix. The material in the text of
each chapter begins with a heading which is taken directly from
the text of the Act.  Each heading is followed by a narrative.
Where references are made in the narrative to attachments, these
are found immediately after the text.  Where references are made
to the Appendix, please refer to Contents page to locate the
document's location within the Appendix, found at the end of this
Plan.

Chapter 1 - Section 10631 of the Act

Chapter 2 - Section 10632 of the Act

Chapter 3 - Section 10633 of the Act

Chapter 4 = Sections 10640, 10642 and 10644 of the Act

Agencies who are signatories to the Memorandum of Understanding
Regarding Urban Water Conservation in California must submit an
annual report to the Department of Water Resources.  This report
outlines specific actions the agency has taken to implement the
16 Best Management Practices outlined in the MOU.  An evaluation
is also provided in the report.  The District is a signatory to
this Memorandum of Understanding.

The Urban Water Management Planning Act has been amended to allow
for the inclusion of this annual report to provide information
requested in the update of the Plan.  References are made
throughout this Plan to the District's 1994-95 Annual Report.
The annual report is included immediately before the Appendix.

Regional references and resources

San Diego County Water Authority
Dave Fogerson
Water Resources Dept.
(Preparation of Authority's
Urban Water Management Plan, 1995 Update)
3211 Fifth Avenue
San Diego,  CA  92103
(619) 297-3218

PAGE 8 Show Image
San Diego County Water Authority
Maria Mariscal
Water Resources Dept.
(Review of Agencies'
Best Management Practices Annual Report)
3211 Fifth Avenue
San Diego,  CA  92103
(619) 297-3218


San Diego County Water Authority
William Jacoby
Water Conservation Coordinator
3211 Fifth Avenue
San Diego, CA 92103
(619) 297-3218


Metropolitan Water District of Southern California
350 South Grand Avenue
P. 0. Box 54153
Los Angeles, CA 90054
(213) 217-6000


Padre Dam MWD Legal Counsel
C. Michael Cowett
Best, Best & Krieger
402 W. Broadway, 13th Floor
San Diego,  CA   92101
(619) 525-1336


Riverview Water District
Catherine Camacho, General Manager
11769 Waterhill
Lakeside, CA 92040
(619) 561-1333


Lakeside Water District
Robert Cook, General Manager
P.O. Box 638
Lakeside, CA 92040
(619) 443-3805


Local Public Health Officer
Robert K. Ross, M.D.
Director of Health Services
1700 Pacific Highway
San Diego, CA 92101
(619) 236-2237

PAGE 9 Show Image
Local Drinking Water Distribution Chief
Gene Nordgren
Superintendent of Operations
Escondido Center
San Diego County Water Authority
610 W. 5th Avenue
Escondido, CA 92025
(619) 480-1991


Local Wastewater Treatment Facility Chief
Waste Water Treatment Superintendent
City of San Diego
Utility Department
Metropolitan Wastewater Division
4077 North Harbor Drive
San Diego, CA 92101
(619) 221-6600


Regional Water Quality Agency
California Regional Water Quality Control Board
9771 Clairemont Mesa Boulevard, Suite B
San Diego, CA 92124-1331
(619) 265-5114


District History and Overview

The Padre Dam Municipal Water District began operations on
January 1, 1977 as the result of the merger of the Santee County
Water District and the Rio San Diego Municipal Water District.
The District is a multi-purpose public utility providing
wholesale and retail water, wastewater collection, disposal,
treatment, wastewater reclamation and recreation in the 190 acre
Santee Lakes Regional Park and Campground.  The service area
covers 85 square miles (54,500 acres) and includes five
improvement districts.  See attached map  District Facilities
Schematic  and attached `Fact Sheet.

Rio San Diego Municipal Water District

As one of the predecessors to the Padre Dam Municipal Water
District, the Rio San Diego Municipal Water District was formed
on November 8, 1955 pursuant to the Municipal Water District Law
of 1911 (California Water Code Section 71000 et. seq.).

The purpose of its formation was to establish a wholesaling
agency to secure an entitlement to imported Colorado River water
with the responsibility of delivery and sale of such water from
San Diego County Water Authority lines to existing retail water
agencies within the area.

PAGE 10 Show Image
Those agencies, consisting of Thakeside Irrigation District,
Riverview Mutual Water Company, and Thakeside Farms Mutual Water
Company, together with a citizen's group from Santee (later to
form the Santee County Water District), were dependent on
community wells located in and adjacent to the San Diego River
bed.  Because the water table was drastically reduced by
diminishing rainfall, it was realized that a supplementary supply
of water was needed and, thus, the District was formed.

Santee County Water District

The Santee County Water District, whose boundaries initially
covered an area of about 9,000 acres, was formed on October 2,
1956 under the County Water District Thaw of the State of
California Water Code.  The rapid expansion of the Santee
community soon required installation of sewerage disposal
facilities, and a wastewater treatment plant was constructed.

However, in 1959, discharge requirements were raised and the
effluent from the plant could no longer meet standards.  Due to
the high cost of other alternatives, and because it owned
conveniently located land which had the necessary physical
properties, the District embarked on an unique and previously
untried project involving the reclamation and reuse of wastewater
for reclamation, irrigation, and commercial purposes.

After wastewater had received primary and secondary treatment,
the effluent was filtered though a sand and gravel portion of the
land and then channeled into the first of what ultimately became
a chain of seven lakes. The San Diego County Department of Health
subsequently authorized boating and fishing in the seven  Santee
Thakes. A swimming pool was filled with reclaimed water and was
frequented by the public with no ill effects. The project
received worldwide attention and continues to attract interested
visitors in the field of water re-use and reclamation.

Padre Dam Water Resources Agency

In July 1969, acting upon the concept that unification of all the
water agencies within the service area would result in improved
services, as well as cost savings, and should be implemented, the
respective Boards of Directors of the Santee County Water
District and the Rio San Diego Municipal Water District entered
into an agreement to combine management and engineering
functions.

In October l9~2, a joint exercise of powers agreement resulted in
the creation of the Padre Dam Water Resources Agency which
ultimately brought about the unification of the two agencies into
a single entity. This agency had the primary purpose of financing
and constructing a new office building for the combined
operations of the two agencies.  In the ensuing years, other
details were worked out toward the merger of the two Districts.

PAGE 11 Show Image
On December 31, 1976, The Rio San Diego Municipal Water District
assumed all assets, liabilities, functions, and operations of the
Santee County Water District and that District ceased to exist as
such.  For having voluntarily given up a seat, each Santee
Director received commendations from the Local Agency Formation
Commission and the San Diego County Board of Supervisors.

Due to its proximity to the Old Mission Dam (also called the
Padre Dam) which had been declared a national historical water
landmark by the American Water Works Association, the name of the
surviving District was changed to Padre Dam Municipal Water
District. The District continues to provide potable water, and
operate a wastewater collection system, water reclamation
facility and the Santee Lakes Regional Park and Campground.

Improvement Districts

The District is subdivided into five improvement districts which
are kept separate for many operational purposes.  See attached
map,  Padre Dam MWD Improvement Districts.

Revisions to the District's standard operating procedures in
January, 1995 were included in a Long Range Financial Plan,
Ordinance 94-12.  These revisions renamed Improvement District A
and B to `~Santee Area  and Improvement District 1 and D to
Eastern Service Area."  The Santee and Eastern Service Areas are
also referred to as the "Retail Water Operations."  Improvement
District C is referred to as the "Wholesale Water Operations." As
the majority of the supporting documents included within this
Plan, are prior to the adoption of the Long Range Financial Plan,
references made be made using all of the above terminologies.  A
description of the five improvement districts follows.

linprovernent District A is part of the former Santee County Water
District which provides both water and sewer service.  Comprising
about 21 square miles, it includes principally the City of
Santee.  It has 157 miles of water mains, seven water storage
reservoirs, two water booster stations, 13,165 water services.
In addition, the District has 135 miles of sewer collection
system, 12,920 laterals, three pump and lift stations, 2,386
manholes, and a water reclamation plant.

Improveinent District B known as the Pepper Drive area, is the
small southeasterly portion of the Santee County Water District.
This area was annexed in 1959 for wastewater (sewer) service
only.  Water service is provided by Helix Water District.

linprovement District C covers the entire former Rio San Diego
Municipal Water District, Santee County Water District,
Improvement Districts D and the service areas of the Lakeside
Water District and Riverview Water District.

linprovement District D was annexed to the District in 1985 and
includes the mountaintop community of Crest.

Iraprovement District 1 comprises about 53 square miles and
includes the communities of Alpine, Harbison Canyon, Flinn
Springs, and Blossom Valley.  This District was formed in 1961 to

PAGE 12 Show Image
finance transmission lines and facilities to receive water from
the aqueduct.

Governing Body

The District is governed by an elected Board of Directors.  The
Board consists of five directors, each representing a division of
the District.  Each director must be a resident of the division
for which he or she is elected.

Boundary lines of the divisions are established by the Board, and
may be relocated prior to each election.  See attached map "Padre
Dam MWD Voter Divisions."

Elections are held in accordance with the Uniform District
Election ~aw (Water Code 71505, Elections Code 23500 et seq.)
Each director is elected for a term of four years, and shall
assume office at 12:00 noon on the first Monday after the first
day of January following the election.

The terms of office are staggered so that elections are held in
November of each even-numbered year.  Directors representing
Divisions 2 and 4 are elected each leap year, and directors
representing Divisions 1, 3 and 5 are elected in the intervening
even-numbered election years.

Padre Dam MWD Wholesale Water O~erations

Padre Dam Municipal Water District operates as a wholesale water
supplier, and a retail water agency to 22,285 customer accounts.
The wholesale water operation supplies water to four (4) retail
agencies, two of which are Improvement District A and Improvement
District 1.  Wholesale water sales are also made to two retail
water districts located within the geographic boundaries of the
Padre Dam wholesale service area: the takeside Water District and
the Riverview Water District.

bakeside Water District had 4,483 connections in December 1995
and Riverview Water District had 2,050.  Padre Dam MWD is the
sole supplier of water to the Lakeside Water District, although
there is a potential for utilizing local groundwater supplies.
The Riverview Water District is currently utilizing groundwater
resources of its own to blend with the Padre Dam MWD water
supply. See attached map "Padre Dam MWD wholesale water service
area' and "District Fact Sheet."


Structure of local and regional water agencies

The District is one of twenty-four member agencies of the San
Diego County Water Authority.  Member agency status entitles the
District to directly purchase water for its needs from the
authority on a wholesale basis, and the District looks to the
Authority to insure, to the best of its ability, that adequate
amounts of water will be available to satisfy future water
requirements.

The San Diego County Water Authority was organized on June 9,

PAGE 13 Show Image
1944 under the County Water Authority Act for the express purpose
of importing Colorado River Water into San Diego County.

The imported water, now a combination of Colorado River water and
State Project water, is sold wholesale to the 24 member agencies
of the Authority.  The member agencies are autonomous and their
city councils or boards of directors set local policies and water
pricing structures.  Each member agency may appoint at least one
representative (based on assessed valuation) to the Board of
Directors of the Authority.

All water distributed by the Authority is purchased from the
Metropolitan Water District of Southern California (MWD) and is
delivered into Authority pipelines from Metropolitan facilities
located just south of the San Diego/Riverside County line. The
Authority annexed to MWD in 1946 and is now represented on the
MWD Board by six Directors.  The Authority is the largest of the
27 member agencies of MWD and currently purchases approximately
30 percent of the total MWD water supply. See attached map `~San
Diego County Water Authority.

The Metropolitan Water District of Southern California was
created by a vote of the people in 1928 following the passage of
the Metropolitan Water District Act by the California Legislature
to provide supplemental water for cities and communities on the
south coastal plain of California.

Since its formation, MWD has grown to include 27 member agencies
(including the San Diego County Water Authority) and currently
covers an area which includes portions or all of Ventura, Los
Angeles, Orange, Riverside, San Bernardino and San Diego
Counties.  Acting as a water wholesaler and providing waters from
both the Colorado River and Northern California, MWD supplies 55%
of the water supply needs of its service area (5,139 sq. miles)
and estimated 14.5 million persons. See attached map
"Metropolitan Water District of Southern California and Major
California Water Systems."

PAGE 14 Show Image

PAGE 15 Show Image
                                                  ¼

                                                ¼







          ~CL             -                    CL







                            ~CL         =


              Co


               oa:
                          ~     =-=  C
               0


0
=         ZCL












               ~4WCL~       -=  -
                                  :0    ~ I




        V







              ~~m~ ;~~:;:;:j;=~~:~: ;t~ ~:={s~:;:~
        ·1' ~ w

PAGE 16 Show Image

PAGE 17 Show Image
  E-



0 ~


  E-
  z

0 ~

~ 0

                                                --

                                            4









              I        I'             ---%--- -










         0

PAGE 18 Show Image

PAGE 19 Show Image
        ~oni1v~TL








                   -     z


                        <  , ?
























                                             0





0             - -~ -----%-       -

Cr

PAGE 20 Show Image

PAGE 21 Show Image
                                     A? ~A

                                     4



~0




 3                             0w2~
                               ~JzZ


Lu co











                                     J





0<

PAGE 22 Show Image

PAGE 23 Show Image
                      PADRE DAM MUNICIPAL WATER DISTRICT
         10887 Woodside Avenue, P.O. Box 719003, Santee, CA 92072-9003
                   (619) 448-3111      T.D.D. (619) 562-2778
                      office hours 8:00 a.m. to 5:00 p.m.

                                  FACT SHEET




HISTORiCAL DATA:    In 1976, the voters of the District's service area approved the merger of the Santee
                    County Water District, formed in 1956, into the Rio San Diego Municipal Water
                    District, formed in 1955. The surviving agency was named the Padre Dam
                    Municipal Water District and uses 1955 as its origination date. The District is named
                    for the Old Mission Dam located juSt a few miles west of Santee. The dam, built
                    circa 1807, has been named a historic water landmark. It is located five miles east
                    of the Mission San Diego de Alcala, founded in 1769, the first of California's 21
                    Spanish missions. The aqueduct and flume supplied water to the mission and are
                    believed to be the first major non-indigenous irrigation project on the coast.

                    The District is a multi-purpose public utility providing wholesale and retail water,
                    wastewater collection, disposal, treatment, wastewater reclamation and recreation in
                    the Santee Lakes Regional Park and Campground.

SERViCE AREA:       Approximately 85 square miles in five improvement districts. Sewer service to the
                    City of Santee, parts of El Cajon, and the county of San Diego. Water service to the
                    City of Santee, parts of El Cajon, and the unincorporated areas of Lakeside, Flinn
                    Springs, Harbison Canyon, Blossom Valley, Alpine, Dehesa, and Crest.


POPULATION          Service area population estimated at 127,903
SERVED:             (based on 1990 SANDAG computations, adjusted for growth)

NUMBER OF           22.285 customer accounts: 13,133 accounts receiving water and sewer service;
CUSTOMERS           6,756 receiving water-only service; and 1,469 receiving sewer-only service; 239
                    vacant accounts


NUMBER OF           104
EMPLOYEES:


ANNUAL BUDGET:      $46,412,156 (1994/95)


WATER MAINS:        313.77 miles


RESERVOiRS:         26 tank, 5 partially underground and 3 completely underground reservoirs. High
                    water elevations range from 630 to 2,646 feet. Total existing storage capacity is
                    106.5 million gallons.

PAGE 24 Show Image
PUMP STATIONS:            14 pump stations. Elevations vary from 466 to 2,286 feet above sea level.


WATER SOURCES:            100 percent is purchased from the San Diego County Water Authority which in turn
                          buys it from the Metropolitan Water District of Southern California. The water is a
                          variable blend from the Colorado River and northern California sources. The District
                          has no reservoirs to collect natural wnoff. The District wholesales water to the
                          Lakeside and Riverview Water Districts.


SEWER MAINS:              142 miles. Approximately 80 percent of the sewage is discharged into the San
                          Diego Metropolitan Sewage System and 20 percent flows to the main sewage pump
                          station at the Santee Field Operations Center for reclamation.


SEWAGE LlFT               The District operates three sewage lift stations and one main sewage pump station.
STA TlONS:


RECLAMATION               The District's reclamation plant processes 1 million gallons of wastewater daily
PLANT:                    (mgd) generated from the Santee area. The influent is processed by an activated
                          sludge secondary treatment process then further treated in oxidation ponds and per-
                          colation basins, disinfected and treated with alum. The reclaimed water then fills the
                          seven Santee Lakes. By 1997, the District will increase the treatment capacity of
                          the plant to 2 mgd, install a BardenPho treatment process, tertiary filters and a
                          chlorine contact chamber. The additional reclaimed water will be distributed in a
                          separate system to Santee customers with large irrigation needs.


SANTEE LAKES:             The District owns and operates the SANTEE LAKES REGlONAL PARK AND
                          CAMPGROUND located in the City of Santee. The 190-acre regional park, which
                          opened to the public in 1961, includes seven recreational lakes and surrounding
                          parkland. The lakes are filled with reclaimed water and are world-famous as a
                          unique and successful water reclamation project. The park offers picnicking, fishing
                          (stocked regularly), boating and camping. There are 152 full hook-up campsites with
                          complete facilities. The park is open year-round and receives nearly 400,000
                          visitors annually for day-use activities and overnight camping.


GOVERNING BODY:           The District is a public agency governed by a five-member Board of Directors, each
                          representing a geographic area within the District. Directors are elected by the
                          voters for staggered four-year terms. Board meetings are open to the public and
                          are held at 3:30 p.m. the second and fourth Tuesdays of each month at the District's
                          administrative office.


San tee Water Reclamation Plant        Field Operations Center          Santee Lakes Regional Park
1O92S Strathinore Drive                9120 Canton Oaks Drive           and Campground
P. 0. Box 719003                       P. 0. Box 719003                 9040 Canton Oaks Drive
Santee, CA 92072                       Santee, CA 92072                 P. 0. Box 719003
(619) 44~(t6OO                         (619) 4484551                    Santee, CA  92072
                                                                        (619) 44(~24&2

1/95

PAGE 25 Show Image
                                    COLORADO RIVER
      ____                            AQUEDUCT
                               L£~~ ~~~E1


F
                ~~~           ________RIVERSIDE COUNTY

      PEnDLtT~ MLIT£fl~               SAN DIEGO COUNTY


  N ES~ftv£T(O~~ ~~t;¼½½nA)N.owMwn)y¼¼¼uwIMDA~/



                             v~rv c~wt£i
                              `a.Wb

                   D~No
                   CO~oftAbO


               COS~A ft~a& MaNCOS
                `awn         t~ A.L{;½½½;'aw~i(7£;












                                   ...~::.:::{::`;.


                        ·  ~ffl








             IA
             [



  SAN DIEGO COUNTY WATER AUTHORITY

PAGE 26 Show Image

PAGE 27 Show Image
                                     METROPOLITAN WATER DISTRICT
                                       OF SOUTHERN CALIFORNIA
                                                 AND
                                   MAJOR CALIFORNIA WATER SYSTEMS





                   OrovilIe
                   `Dam




      North Bay 0 Sacramento
       Aqueduct

                   jOELTA


San Francisco.
           South Bay
           Aqueduct

             San Luis
                Darn         a Fresno
                                           t


                                            :7


                                            t
                             p              0~
                                              cc'
                                            .~ :
                      Coastal
                      Branch                ·1
                                 Sakerstseld :




                                          a
            San Luis Obisco .            a
                             West Branch      East Branch




                      Santa






                                                    `te'..
                                                      fl Diego


           Metropolitan Water Distrtc~

PAGE 28 Show Image

PAGE 29 Show Image
C~ER 1

PAGE 30 Show Image

PAGE 31 Show Image
                CHAPTER 1  -  SECTION 10631  -  A


A.  Include an estimate of past, current, and projected potable
and recycled water use and, to the extent records are available,
segregate those uses between residential, industrial, commerical
and governmental uses.

Potable water sources

The District purchases 100% of its water from the San Diego
County Water Authority, which in turn buys it from the
Metropolitan Water District of Southern California.  The water is
a blend of supplies from the Colorado River and northern
California sources. The water is treated at the Lake Skinner
Filtration Plant operated by the Metropolitan Water District
before reaching the San Diego area and Padre Dam's distribution
system. The District has no wells or reservoirs to collect
natural runoff and no ground water supplies.

A portion of the District's service area receives Metropolitan
water from a connection with neighboring Helix Water District.
Helix treats the water at their R.M. Levy Treatment Plant in
Lakeside.  This water then merges with the District's supply at a
connection in Lakeside, California.

Metropolitan has water delivery contracts for Colorado River
water with the U.S. Dept. of Interior for 1.212 million acre feet
per year and an additional 180,000 acre feet per year of surplus
water.  However, as a result of the 1964 U.S. Supreme Court
decree in Arizona vs California, Metropolitan's dependable supply
of Colorado River water was reduced to less than 550,000 acre
feet per year.  This reduction began when the Central Arizona
Project began delivering water to Arizona through the new system.

At present, Arizona and other entities are not using their full
entitlements and Metropolitan is able to purchase additional
water.  Future needs will alter this arrangement and Metropolitan
has many water supply initiatives underway to reduce projected
shortages.

The San Diego County Water Authority (Authority) was established
in 1944 to import water for the San Diego region and to ensure
the residents of a safe and reliable water supply.  The Authority
imports 90% of the water used by county residents, the remaining
10% is from reclamation, runoff, etc.   The Authority is
currently planning to provide an additional 90,100 acre feet of
water storage for the area to supply retail agencies in the evnt
of long-term drought or natural disaster.

Critical issues of water planning such as the county's rapidly
growing population, limited storage capacity, water transmission
facilities, uncertainties over water imported from northern
California, and the loss of water imported from the Colorado

PAGE 32 Show Image
River are requiring the Authority to develop long-range plans for
meeting future water demands.

Ground Water Alternatives

Development of other sources of ground water to supplement the
District's imported water supply are limited.  Only two were
considered in the District's most recent Water Supply Master Plan
(1989.)

Development of the El Monte Basin for use during peak demand
periods of the year was studied previously by the District in
their 1972 Joint Study of Transmission, Storage, and Treatment
Requirements.  Based on that report, the basin could hold
approximately 21,330 acre feet of water if filled to the surface.

Natural recharge of this basin was curtailed with the
construction of the El Capitan Dam. The basin currently receives
replenishr~tent from only minor tributaries downstream from El
Capitan, seepage through the dam, and possibly some sub-alluvial
sources in the aquifer. The alternative of developing this basin
still relies on using imported water but to a lesser degree.
Water quality within the basin is poor.

Well water production has been a past supply source for many
residents in the District's service area, and continues to be for
a small percentage of residents. The principal groundwater source
for the service area is in the vicinity of the San Diego River.
Developing production wells in the river basin would not produce
the volumes of water required to significantly improve the
District's water supply.  The basin is in an overdraft condition
according to the California Department of Water Resources.
Exploring the possibility of drilling wells in the river basin
would require field studies as well as the historic data from the
Department of Water Resources to determine production
capabilities.

Recycled water sources

The District has been reclaiming and treating wastewater at the
Santee Water Reclamation Plant since 1968.  One million gallons a
day (MGD) are produced by the reclamation plant used to fill the
seven Santee Lakes, a world-famous project.  The plant was
originally designed to treat 4 MGD but constraints on the
discharge of excess reclaimed water to the Sycamore Creek and the
San Diego River, (live stream discharge) has prevented the
District from operating the facility at full capacity.

The plant is currently undergoing construction to upgrade
treatment technology and produce 2 MGD.  The additional recyled
water will be be available by mid 1997.  The 2 MGD of recycled
water will provide 10% of the District's average daily need,
thereby reducing the need for imported water supplies by 10%.

It should be noted that~since the time of the preparation of the
Water Reclamation Master Plan, the markets for the Phase I
Upgrade Project to the District's Santee Water Reclamation

PAGE 33 Show Image
Facility have been refined for demand levels and distribution
feasibility for 1997.

The following are staff's estimated projections for the annual
use of recycled water within the District's service area.

          Year 1995      400 AF    Current production with
                                   use only at Santee Lakes
                                   Regional Park and Campground

          Year 1997      500 AF    2MGD project on line, a
                                   portion of customers connected
                                   and using recycled water

          Year 2000      850 AF    2 MGD project on line, all
                                   customers connected

          Year 2005      850 AF

          Year 2010     1900 AF    4 MGD project on line with
                                   additional customers connected

          Year 2015     1900 AF


See attachments.  The term wholesale water sales in  Past Current
and Projected Annual Potable Water Sales in Acre Feet" includes
sales to Lakeside Water District, Riverview Water District and
the County of San Diego (for El Monte Park.)

PAGE 34 Show Image
       POTABLE WATER USE CONNECTIONS AS OF OCTOBER 1995


         ACCOUNT TYPE            NUMBER OF     ANN(7AL POTABLE
                                   POTABLE     CONSUMPTION
                                 CONNECTIONS   IN ACRE-FEET

SINGLE FAMILY RESIDENTIAL         18,786         9,714.8    AF

MULTI-FAMILY RESIDENTIAL             837         3,000.1    AF

COMMERCIAL/INDUSTRIAL/             1,238            59.9    AF
GOVERNMENT

AGRICULTURAL                          11               92.7   AF

TOTAL                             20,861           12,774.8 AF

PAGE 35 Show Image
a,



L
     a)
         a)   Co
     Cl
     a)
  a,   0 CO ~ 0 CO         Cl
       Cl CO a) Cl Cl  ~ 0 Cl a)
  a,  Cloo~i:Cl     ~~Cl~a)CO
     ~~a)-~cD                CO
                    0
                      £0 CD CO
a,      a) to     Cl CO £0  CO
o u, ~Cl~~~~      CO  CO a) Cl
                            CO

     ~~flClV4a)     a)Lr~a)COa)o
Cu a,  ~            a)~ ~ a) ~  CO



                    CO~CO%(~CO~  :~-


(0
Cu     Cl CO  0 CD    Cl CO £0 CO ~



     CO~COfl~~      COCl~~CO


                                 0)
     ~CO(fl0~CO




     IL
     a,
       a) Co  CO      a, CO 0 CO a,  a)

         ~ E 3        CO~ ~ a,~ 6 ~  a)
     CO = a, 0  ~  CO = a, 0  ~  a)

PAGE 36 Show Image
                                                         oO

C,

a,                                                       ~ a,-
U
0)          cc 0 Ln            tn ~  0)  0) 0 0 0 0 0 0~ ~
Co
        a,
a,                                                    C
      0,                                             (0
a,


(U
a,           Sn   ~ 0 ~  CO  CO ~
                                                      C



                   0 ~~CO~~~Snj0)~~O~~O~~flC~~cv)~~Sn~CO ~   .2
                                                             E



                                                      (0
                                                             Co
                                                             Co
                                                             Co
V                                                            =
        <0) CO Ln 0) ~ ~ 0 ~ 0) ~  c~)  0) CO ~ CO
U       0 ~  fl ~`n CO CO 0) 0  ~         CO  ~  0
a,       ~~~~~~~i~~SnSnSnt()CO(dCO~                         0)
                                                      C
                                                     (0     CO

                                                             0)
                                                             Co
(U                      CO ~ CO 0) 0  ~ cv) ~in CO ~ CO 0) 0

                                                            0,
                                                             t
                                                      C     0,


0

                                                             0)
                                                             0)
C,                                                          0)
(U
                                                             CO0)


                                                             0)

PAGE 37 Show Image
                                                           In
                                                           0



                                                             0
                   : :  .   .             ..               In

               -In:   :

       Cf)              ;;: :                  SO::


















                                                           In



                                             .~....~~~     ~





CL

                                             :9:   :~ :~




                                                           a,
            too       o~                        S        0



                  (o~~) MO% A~JVG ~~V~~AV

                                       Source:
                                       Figure 5.2
                                       Water Supply Plan
                                       Water Master Plan
                                       Wastewater Master Plan
                                       Prepared by:
                                       Engineerij~q Science

PAGE 38 Show Image
                                                          to
                                                          to
                                                          0
                                 · 0
                               .:.0:to
                                  · b  
                                                      .   to
                              : : .~~  .          .

                              : :~:.    ·
                  :~:O:       . .~O    :0:       - -
                              : :=:~
                  :~:o:       : :~~ )½½½1;;; to

C,,                : :~ :
                       -      . .     : :~:
~=       0z"'~£~  ~ :       .:1:-  : :~:~

                        :   :

         ~~~      ::::~.{::{
                  --....

                  . . . .   .          . .           -

              C,, . . . .   . . - .   - ::      -
                  : : : :   : : : :   : : :         . .       w

         0Zwc,,             :::::::~            .   .-
                    : : :   : : : :   : : :     :         to






-0

La                ::::
           0

0
           (0     ....
CL          0








              oO        oO        Oo         oO        0
              o         0         0          0
              &         &         &          &
                        to~       S          to



                            NO[iV~fldOd

                                       Source:
                                       Figure 2.4
                                       Water Supply Plan
                                       Water Master Plan
                                       Wastewater Master Plan
                                       prepared by:
                                       Engineering Science

PAGE 39 Show Image
                    PADRE DAM MUNICiPAL WATEn DISTRICT
                      sANTEE WATER RECLAMATION PLANT
                         Tel. ~58-4691  Fax 258-8774
                           Contact: Ted Mitcheif
           MqnthJy~~Su~m~~~m~~p~f, ~QcJ.aj~~Wa.te L Proquc~~t~p~



                  For Month Of:    October Year: 1995



        Disintected Tertiary _____ Disinfected Secondary _____ Other X

~ECIAIM~D WATER US~

 Ground Water Replenish:        0 (AcIFt)

 Direct M & I:        +     43.83 (AcIFt)

 Agriculture:          +        0 (AcIFt)

 Disposai (Outfall)   +     55.78 (Ac/Pt)

        Total Produced:        99~(Ac/Pt)


R~~LA~~~!MED wATE~Q~AL.~1.TY:

 Average Monthly TDS:         946  (ppm)

 Peak TDS:                    960  (ppm)

 Method of Test:        Standard Method

 Chlorides:                  249.8 (p pm)

 SAR Ratio:                  N/A

 Other:        % Sodium       62.4 %

                                  ~ke #7 ~lct frorn Sor~c1in~ Basins: 14.278
                                  Production Total:    32.447

PAGE 40 Show Image
            ~C~%n~~~~C~C~C~~~Ctotb  ~~~~oiC~C~C~In  u,-~  C ~  w ~
                                                                                                                    W~~CC  o.~
-I           C  ~               In  ~ C -                                                    ~ C C~I ~    cg ~  - - 0 w    ~
             -      c~i ~ d ~ CCC  CD 0 C C C Ot CD ~                                    C~I ~    so' ~ C' C' -  CD C' CD' ~
~ 0
             ~ ~< <-~ `C~ `C>' `C~                             -.  C
     E      > Cc   2 · ~~ I 00E &~.o 0~0  0   ~                          ~C'C -
            <~oo~T<>~.''C"'.~(00     ~E>oC,,,>o ~~   0>
     <"   C
     ~    ~UO~j~~I 0L==~C=CC            ~ 0             ~~`C>0C ~`C>~<>~'C>'C (0i0Ogoc~

     -    0~~OO>0=C0~OC0=~0~O0""   `9~~c.=~&~~ .C: o~ 0::


     r   ·r ~CC 00 <:10 ~ :~ g g E :0 :(0 O  U~~~~>  .,:~=~ ~~~
      w~                                                                 c-Coo
      ~ `C0:>,~~~~~~~&O~~%OC~C~~~~so~o~i::~iL:~:~jL~~~so:~:~~:2~:CL~:~:~ ~:=C~
               CDCD ~~OS~~ ~~o~~~~ - ~CD~~~~ CD~~CD~ CD CDCD   L   CD CD  0 CD-CD, (0o~CCo~&>,o C10VVOS
                                                                                  (0CD CDW(0, -. CD
                                                 a            0                             0.
                                              a       .    `: p
                                                                            a               `
                -               C             0  :00                        0               ~`
                                            a :~ =~
                                                                           UO
               11         `0,   :                          `c                -00
             0:0:    ;~a~~: o    ~ 0   6  ~0~~o L ~ 6                         :o 0 0 ~ " o0~0<
Lw                    L L              :                                      =;;~ ~0~~c~~~~:
InICD  ~  CO                   0   0,  oa~~:UC'C,,,                      -
CDI~       0
~~     E01 -~              >`=00 a ~ _ ~0~0~L0 OCL"'0 =~0~~~ ~~
                   0       _ .~             ~-  >E E
                                 -    C                              C  c~~=0~~j(0 ~~~0cw:o00o
                   ~  : :~  ~     : 0~O x a> ~=~~:L e~
       as            0,C C a a ~ a ~=w ~~   · &oo.                         =~0<~o:::J~gg
      ~:                               ~~ii~~~oaEtita~o0,1o0,~~w:2~~~~ :CC~~E&~~~~:~w~~ic,:~>o«>:~>O~~~o~a,gC0~otnOo::oo~ta =1
                                                                                                0
::~    E~~~e,0CD~~o~e~~0so10~~~~~~~~~~~~~~~~~~~~~~~~1010~~                          CCDCDOSCD  OSV~
~-~    LLCzi~0C~0CCCCCCCDC~C~0CD~OS~C~OS~~CV~0CDOC~CwCOS~                           CD~~OSOIn  ~COS~OS~

PAGE 41 Show Image
wo~c'Iw~~'o000o~~oLoInw~~0o~~w0~co~0~o~~~ ~w0~o~~c~J~000




~0~~w~~cDo00o~~oLn~~~w00~C~Ico0~~~o~oegmw 0~OCD~~~~~~ 000
~v0~~~",~~o'n~0~(a~~~w~~(o.~~g)~~~~c~I~~cD~~ to'o0cDcu~~~  ~~~
                                              000'


~~~-~~~~~~m~~0w~'a~~c'I~~~-~~~ow~~~~~~ w0~c,~~~~  ~-~
                                              000


                ~~~~~IO CO~cb~~ C~~~~co~~ w,~~c~1~~~ ~~
                                    w.~w.o)'~~~~~ czz



~ o0~~~ 0an~~~~~c~Iw~ ~o~o~~ 0~cc~~~w~~~~~~~ co~~~mw0 m~ ~«
o~~~~d~~~o(6ao.(6~~(6o(6(6~~~~~~doc6ooo~cjoc~i (6~(6~(6do"~~ dzz~


~ ~~~~~~~~~`n~~~~0 ~o~~~'D~w~~~~~~-~~~m co~cg~~~~~~  <<
0 cJ ~       0 ~ 0(6 ~     0 ~ 0 ~ CJ 0' ~ V' ~ (6d (6(6 ~
                                         _    cz z


~~~ `Dc~i~~~~<~~'ow~«<~<~~~~c~~~~~~0~c,,~~~~~ 0.~<~~~~w~ m,<~<~
o~~cj~~~~(6Zo~~ c~~~~~=~~V~~ _ ~00'n ~o~~c~io'cJ `o~z~w'~~ (6(6 ozz



  ~c~tc~~       C"                             C"

TC"TTT7C"C"C"C"TN7,T7~TTTC"C" C"C"C"~~C"C"~~C"C"C"cg ~~~cu~C".C"~C"




    111111111IIIIIiiI1III 111111111  111111111 III

                                     ~wm0~C" ~

                                       ~-~~~~~0~~ oC"~~o~0o~CU~o
                        11111111111111111  11111111
                                          Ln~g)~0~~~~ 0~~






                                     ~~~~~~~~~ 000
                                     LL~~~~~~L ~~:


             a
                             =>-=>-              Co-. ~
                                        a a      C C
     -       C            a  · .       . 5>      C)
                         a~O CC                  C ·

c,~a~            I ~~~~  _ a --       0       ~Ci C~
           ~ ~~gC~~~0Cc0C0~00=~: Co~CO~ ~~ a  ~: E


                                    ~ C~

                                    ~  ~ . g g~-
                                     ~~:~~ ~~~=o~z~z~~=~:~:~fl~Cfl~C~~~~~~~0~~~j~~~~~~~~5~~1z~O~~~~0>~~~LU~~~~~~~~j;g~0~~
PAGE 42 Show Image
          %.~~~~oOo~~~c~~O~sn~c~i~~c~iw~~~~ o~~~~~~C~Iw:~~~~~~~

     0 0 ~ 0 t4 0 CO C~ 0 000 0 ~ 000 0 0' 0' 0' 0' 0' 0' 0' ~  0' 0' ~ CO `o'm'~ ~

                                                 ~ 0'

                                  ~qD 0~~~~~~~~g,~~ 0
                                      ~~~~~o'~~~~~~~ ~~:~0:~0~0  ~
       _                                 ..```.``
                                   ~00w00



            O'O'~c~'O'0'0'0'0'i;0'0'0'd0'0'00000~woiZO~oo


     ~c~I.~~~ 0m~m~.~~~~~~~~~~~~~~~~~~.~~<~~~~ ~c'0~~.~~
                            Ocoo~~~zo~o'd
                                         oI~~
                                                            0

   ::o~~:::~:.~:~:.o:o~:o~~o:.:.:o~o:~:.~~::.~<~~<~~~~. ~:~:~:::e~  :~

   <~<~c~~~~ 0~~~<~q~~~.qe.~~~~~o~~0~~~~0~~< <~  ao·.~ac0 .~  ~

    zzo' 000' ~000Z~~00000000O'O'O'O'O'0'0'0'doi'~~odo' c1~ 0

       - ~ 0ao. <~< 0~~~C~t~~o~,c~~~ ~sc 0, o;~<~~~ ·.~~0~Oe.  ~
                     0'0'0'0'o'o'd''
     0' 0' 10' 0' ~ 0 ~~ ~~~60,0,0,0~,000


                           0'
    0' 0' .   0' ~  0' _      C C
         ~0'I         ~~,L I~~I'o~~~~0'0'770'0'~%c, 0'0'  0'0'0'Ot


                  0~~~c'~~0'~~:"'~~0'~~~w~~~~~~~ ~ 8 u'o'oo'o~~10oS
   I liii I I IllillIlillillill IllIlillili  lillIlil




   ~~cg~:~~~CC~00'0'0i~~~~~~?~~0~80~00~~~?~0'~~~~~~C~~~0'~80'0g8~~~~~?~~~~~0~0~~~gVV~~0~8i~~~~~~~~0'~;80'1;~~~~o~~8~ ~~-;~0i~::~~i;:;:si




                                                       cOOOcDo,O~cOO~cOQO,O



                                                 0,
       x                                         Lu
       OCo ~                                 2    E
                                               -~ 0


           0                                  -
            ~  `n.  IllS ~    -   S  ~~
                                    `~: 220Cs~x ~~
                                           E :~c :~ E ~



                                                  C

   @:.:.o~~=:o:&Oo~s;o~:~~oi:;io~~=:o~woo~~:~~~g,oo~~~=~:~~o~o~~~~~~~ sCsCz~w*~~L~L~~  1-<~


   ~~L~L O~~~ ~0O1-e o oO   ·~·~ e~O 0000~~~~~0~~~~b cO50,O~0,OOL£~ 1-0

                                                 0


                                           0~OO


   :::::::::::::::::::::::1:11::::..... g~~~-0000001g



   coS~~coScoScnSo,S0,SSSS0,SSS~~~S~~0,S~~~~0,s5osos55:s:s0,S~0,Soi~~~:~!o~!o~J~~o<~

- -00000 C 0-0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -I E E...
   0~0~0~0~0~0~0~0~0~5~0~0~c;~~0~0~0~5~0~0~0~0~0~0~0~0~0~0~0~0~0~0~0~0~0~0~0~1-<1-00g~£~5~5~5~~5~51-01-



   ~. 0 0' ~~ ~w C0~ - ~ CCC 0'0' ~~eeo ·~ 0'0-oo~ 0~e--0' 0'~  ~-O~
   10--CCC-o80'~ -00'o0'--omov~:~w~~10~~~~ 8

PAGE 43 Show Image
               CHAPTER 1  SECTION 10631  -  Bi, B2


31.  Identify conservation and reclamation measures currently
adopted and being practiced.

32.  Urban water suppliers that are members of the California
Urban Water Conservation Council and submit annual reports to
that council in accordance with the "Memorandum of Understanding
Regarding Urban Water Conservation in California, " dated
September 1991, may submit the annual reports for the purposes of
identifying conservation measures as required by paragraph (1).

See  California Urban Water Conservation Council Best Management
Practices Retail Water Agency Annual Report" in the Appendix.

PAGE 44 Show Image
               CHAPTER 1  -  SECTION 10631   -  C



C.  Describe alternative conservation measures, including, but
not limited to, consumer education, metering, water saving
fixtures and appliances, pool covers, lawn and garden irrigation
techniques, and low water use landscaping, that would improve the
efficiency of water use with an evaluation of their costs and
their environmental and other Si gnifi cant impacts.

The above listed alternative conservation measures (excluding
pool covers) are currently being implemented by the District.
The measures are included in the "California Urban Water
Conservation Council Best Management Practices Retail Water
Agency Annual Report." See Appendix.

Several of the District's large-scale conservation programs are
listed here with a brief description, references to the Best
Management Practices Report (BMP), and an evaluation of the
impacts as required in this section.  Except where noted, all
programs are currently operational.

Note:  The material included in this section is also used to meet
required data for Chapter 3, Section 10633, in this Plan.  That
section requires that each program is evaluated for several
factors.  These factors are included in this section.

Cost
Environmental impacts
Social impacts
Health impacts
Customer impacts
Technological factors

Additionally, as a member of the San Diego County Water
Authority, the District benefits from region-wide public
education and information programs.  The District also shares in
regional fixture retrofit programs and water use survey programs
for residential and commercial accounts.

A description of the County Water Authority programs, excerpted
from the Authority's 1995 Urban Water Management Plan, is also
included in this section.

PADRE DAM MUNICIPAL WATER DISTRICT CONSERVATION PROGRAMS

The District introduced a water conservation program in 1975,
before the 1976-77 drought.  The initial program was primarily
educational, coordinating classroom presentations with the San
Diego County Water Authority, distribution of pamphlets, and bill
stuffers utilizing the District's conservation mascot developed
for the campaign, the Frugal Friar.  Since 1990, an itemized
schedule of the costs of water conservation programs is included
in the annual budget as part of the Public Information program.

PAGE 45 Show Image
Examples of several programs are included in the attachments.

During the drought, the efforts were increased with the
distribution of bumper stickers, educational films and a
distribution of water saving kits containing toilet tank
displacement bags and conservation literature.

A second statewide drought, from 1989-1993 included activities in
all areas. With rate increases, mandatory rationing and the
imposition of water use restrictions and penalties; water
conservation activities and customer education programs were
carefully coordinated and implemented to achieve rationing goals
and maintain customer goodwill.

Educational objectives in the District's water conservation
program include, but are not limited to the following:

1)   Inform the public that 100% of their potable water is
     imported from outside the region.  Supplies are dependent on
     rainfall in other parts of California and the Colorado River
     drainage basin.  Water should be considered a valuable
     natural resource and should not be wasted.

2)   Develop public acceptance of water reclamation as a viable
     method of water conservation.  Achieve public support for
     expansion of the District's reclamation plant and
     reclamation projects generally throughout the region.

3)   Increase and maintain water-saving behaviors among the
     District's customers by offering information on a regular
     basis through the customer newsletters, promotional
     campaigns and other community activities.

4)   Offer programs to customers that provide financial
     incentives to conserve or water or offer free assistance on
     ways to cut back use in the home and yard.

5)   Develop close working relationships with the District's
     largest water-using commercial and agricultural customers to
     ensure maximum efficiency in water use.

Literature-Brochures  BMP 7
The District maintains a literature display in the lobby of the
Administration office.  Literature is free to customers who visit
the District.  The Customer Service Department also mails
brochures to customers on special topics when requested.

Cost:  Included in current conservation budget
Environmental impacts:  Area offers mixed paper recycling
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

PAGE 46 Show Image
Customer Newsletter  BMP 7
Quarterly issues of the customer newsletter, the I5p~~~~~y  are
inserted in the bills.  The April issue each year contains the
"Annual Water Quality Report" required by the State Dept. of
Health.  The newsletter offers water conservation tips in
articles and the District's conservation mascot, the Frugal
Friar, who has a cartoon-style message in each issue.

Cost:  Included in current conservation budget
Environmental impacts:  Area offers mixed paper recycling
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

Do-it-Yourself Water Audits  BMP 2
In the first year of mandatory water use restrictions and
allocations, the District developed a water use guideline for
single family residential customers.  Customers could learn how
to read meters, test irrigation system output, perform an audit
of water use and compare consumption to low-water use fixtures
and practices.  Dye tablets were also included to test for toilet
fixture leaks.  The "Do-it-Yourself" Home water audit remains
popular, is frequently promoted and is often mailed to customers
at their request.  See sample included in "Best Management
Practices Report" in the Appendix.

Cost:  Included in current conservation budget
Environmental impacts:  No impact
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

New Customer Information Packets  BMP 7
In 1995, the District updated the New Customer Information Packet
to include additional material on water conservation, use
restrictions and water supplies and cost factors used in
determining water, wastewater and reclaimed water rates.

Cost:  Included in current conservation budget
Environmental impacts:  No impact
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

In-home Reminders  BMP 7
In April 1990, a card of four custom imprinted vinyl stickers was
inserted in the bills.  These peel-off stickers reminded
customers to conserve water in the bathroom.  The stickers were
also made available to customers in the administration office
lobby.

PAGE 47 Show Image
Cost:  Included in conservation budget
Environmental impacts:  None
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

Lawn Watering Guides  BMP 12
These guides are available for customers in the administrative
lobby.  The guides provide information for turf irrigation to
maximize watering schedules.

Cost:  Included in conservation budget
Environmental impacts:  None
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

Audio-visual Resources BMP 12
The District has established a lending library for customers
consisting of videos on low-water use gardening and water
conservation tips.  These are available for a three-day check-out
from the District office with no charge to customers.

Cost:  Included in current conservation budget
Environmental impacts:  None
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

Frugal Friar mascot  BMP 7
The District continues to use the Frugal Friar, a cartoon
character, whose identity was conceived from the original Spanish
missionaries (friars or padres) who first settled the region.
The Friar's name and logo appears on lapel pins, pencils, note
pads, and other promotional items.  The mascot also appears in
the `Spillway  and in print media advertisements. The Frugal
Friar's conservation slogan "Save Water, Make it a Habit" has
been changed in recent years to "Please Use Water Wisely.

Cost:  Included in current conservation budget
Environmental impacts:  None
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

Promotional Items  BMP 7
Customers may pick up free notepads with a Frugal friar
conservation message and matching pencils in the District
administration building lobby.  These items serve as a goodwill
gesture for customers who pay bills in person.  The items are

PAGE 48 Show Image
also included in the press kits, speaking engagements and in
other promotional opportunities.

Cost:  Included in current conservation budget
Environmental impacts:  Area offers mixed paper recycling
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

S~eakers Bureau  BMP 7
Public presentations regarding several aspects of water service
are available to clubs and organizations requesting speakers from
the District.  Directors and staff alternate or attend together
at these presentations.  Educational literature and conservation
promotional items are distributed at these functions.  The
Speaker's Bureau is promoted by a direct mailing each summer to
service clubs and organizations, homeowners associations, etc. in
the District's service area.

Cost:  Included in current conservation budget
Environmental impacts:  None
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

Facilities Tours  BMP 8
Both large and small groups visit the District's water
reclamation facility.  During the tour, water conservation
brochures are distributed to visitors.  An additional brochure on
water reclamation is also made available.  Tours occur 4-5 times
each month with group sizes varying from 2 - 60 persons.  Many
students from the service area visit the plant annually.

Cost:  Included in various areas of District annual budget
Environmental impacts:  None
Social impacts: Anticipated greater acceptance of water
reclamation
Health impacts: No impact
Customer impacts:  Anticipated greater acceptance of water
reclamation
Technological factors:  No extraordinary factors anticipated

Park tours and interpretive programs  BMP 8
Park rangers conduct interpretive nature programs for students,
youth groups and other visitors to the Santee Lakes park.
Included in the discussion is information on the use of recycled
water to fill the lakes, irrigate the landscape and provide the
ecological environment at the park.

Cost:  Included in various areas of District annual budget
Environmental impacts:  None
Social impacts: Anticipated greater acceptance of water

PAGE 49 Show Image
reclamation and environmental resources
Health impacts: No impact
Customer impacts:  Anticipated greater acceptance of water
reclamation and environmental resources
Technological factors:  No extraordinary factors anticipated

Water Awareness Week/Month  BMP 8
Since 1987, the District has participated in the statewide Water
Awareness Campaign sponsored by the Water Education Foundation,
the Association of California Water Agencies, and the California
Department of Water Resources. A variety of activities have been
undertaken over several years.  Primarily, educational materials
are distributed to 4th grade teachers in the District's service
area to aid in the instruction of various aspects of statewide
water sources and supplies.

Cost:  Included in current conservation budget
Environmental impacts:  None
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

Restaurant Table Tents  BMP 7
In May 1990, the District developed restaurant table tents to be
made available to area restaurants. The tents remind restaurant
patrons that water is not served automatically unless requested.
The tents feature the District's water conservation mascot, the
Frugal Friar, and are distributed in requested quantities at no
charge to restaurants in the District's service area.

Cost:  Included in current conservation budget
Environmental impacts:  None
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

Exhibits at Community Events  BMP 7

The District frequently participates in community events, usually
providing a table display of water conservation literature and
promotional items.  Examples of community events include: Fire
Prevention Week, Parks and Recreation events, Open Houses, grand
openings of retail outlets, Chamber of Commerce events, etc.

Cost:  Included in current conservation budget
Environmental impacts:  None
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

PAGE 50 Show Image
News~a~er Advertising  BMP 7
During high water use months, or when it has been noted that
customers have decreased compliance with outdoor water use
restrictions, display advertisements have been placed in area
newspapers.  The ads contain various water conservation messages.
Ads have also been co-funded with other water agencies.  Annual
Design-an-Ad  contests in local newspapers offer students the

opportunity to use conservation themes in display advertising
designs for the District.

Cost:  Included in current conservation budget
Environmental impacts:  None
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

CIMIS Stati~ons  BMP 5, 12
The District provides information to agricultural and other large
growers regarding the three California Irrigation Management
Information System (CIMIS) stations located in the county. They
are located in Oceanside (for coastal conditions, in Balboa Park
(for central conditions) and in Escondido (for inland
conditions).  CIMIS is an integrated network of more than 70
computerized weather stations located at key agricultural and
municipal sites throughout California.  The system is operated by
the California Department of Water Resources.

CIMIS helps agricultural growers and large turf managers
administering parks and golf courses and other large grassy areas
to develop water budgets for determining when to irrigate and how
much water to apply.  Providing information for improving water
management and conserving California's water resources is the
primary use of the CIMIS system.

Cost:  Included in current conservation budget
Environmental impacts:  Unable to quantify
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated accurate use of water for
irrigation
Technological factors:  No extraordinary factors anticipated

Pool covers  (not specifically stated in BMP's)
The District currently does not have a program to promote pool
covers except promoting the use of covers in conservation
materials. The California Pool and Spa Industry provides written
materials that can be distributed to customers regarding the
benefits of pool and spa covers to reduce loss of water from
surface evaporation.

Cost:  None
Environmental impacts:  None
Social impacts: None

PAGE 51 Show Image
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use to maintain
water levels in pools
Technological factors:  No extraordinary factors anticipated

Telethone Assistance  BMP 7
Customers who call with questions about their consumption are
assisted individually.  Customer service representatives are
trained in the area of water conservation and have ready access
to written materials which cam be mailed if needed. Where
applicable, suggestions are made for reducing water use and
bills.  Referrals are made to various conservation programs such
as toilet replacements or residential water use surveys.

Cost:  Included in current conservation budget
Environmental impacts:  None
Social impacts: None
Health impacts: No impact
Customer impacts:  Anticipated better management of household
water use
Technological factors:  No extraordinary factors anticipated

Consumption Checks by Billing System  BMP 7
A "consumption proof" is generated by the billing system for each
billing cycle.  These reports are manually reviewed by staff to
look for unusually high or low water consumption on accounts.
Any account which displays an unusual reading is referred to the
meter reading department for a re-read. If no malfunction is
noted on the meter, the customer is contacted to discuss the
water consumption.

Cost:  Included in current conservation budget
Environmental impacts:  None
Social impacts: Anticipated change in water use behaviors
Health impacts: No impact
Customer impacts:  Anticipated decrease in water use
Technological factors:  No extraordinary factors anticipated

SAN DIEGO COUNTY WATER AUTHORITY
EXCERPTS FROM 1995 URBAN WATER MANAGEMENT PLAN
IMPLEMENTATION OF BEST MANAGEMENT PRACTICES

The Authority assists member agencies in implementing the BMPs in
two ways.  As indicated above, the Authority provides direct
funding assistance for the implementation of BMPs.  Additionally,
the Authority operates programs to implement BMPs for its
participating member agencies.

The method of implementation for each of the 16 BMPs is discussed
below.  Specific levels of implementation for each BMP can be
found in the Authority's annual reports to the California Urban
Water Conservation Council, given in Appendix A.

Water Audits

PAGE 52 Show Image
The Authority, in conjunction with participating member agencies,
operates a program to provide water audit services for single-
family residential, multi-family residential and small commercial
customers.  Audits are made available to the tope 30 percent of
users in each category.  The survey concentrates on exterior
water use, especially irrigation practices.  Additionally,
information and equipment is provided to assist in enhancing in-
door water use efficiency.

Plumbin~
In conjunction with its member agencies, the Authority works to
assure only Ultra-bow-Flush Toilets (UbFTs) are installed in new
construction, and sold or installed in its service area.  This
effort has included notices and educational information to local
building departments, workshops for plumbers, and outreach to
plumbing retailers and wholesalers.

The Authority, in conjunction with its member agencies and San
Diego Gas and Electric (SDG&E), distributed or installed over
500,000 conservation retrofit kits for pre-1980 homes.  The kits
included: high-quality showerheads, toilet displacement devices,
toilet leak detection tablets and conservation information.

Distribution Svstem Audits, beak Detection, and Repair
Four member agencies participated in an Authority-operated
Distribution System Water Audit.  Information derived from the
audit was used by those agencies in determining the need for leak
detection and repair programs in their respective service areas.
Additionally, Authority staff performs annual audits, along with
daily leak detection and repair of its water delivery system.

Metering with Commodity Rates
All Authority water sales are metered.  Commodity rates are
included in the Authority's charges to member agencies purchasing
water.  Additionally, retail customers in the Authority's service
area are all charged commodity rates for metered water purchased.

bands cape Audits and Incentives
The Authority offers audits of large landscapes at no cost to the
irrigator.  The audits are performed by qualified consultants
trained in the Cal Poly method.  Follow-ups are performed to
provide additional assistance to irrigators.

Direct financial assistance has been provided to public agencies
who have completed the audit.  The assistance has been used to
assure the irrigation system repairs identified in the audit are
implemented.  Often, this includes the purchase of matching
irrigation heads or other needed irrigation equipment.

The Authority has sponsored multi-lingual irrigation training
classes.  The Spanish language version of the classes, known as
Protector del Agua, was the first in a series of such classes
offered in the Authority's service area.  Classes are now offered
in English, as well as Spanish, and at a variety of different

PAGE 53 Show Image
levels of irrigation maintenance skills.

Public Information and Education
These programs educate and inform the public about water either
directly or indirectly through a number of activities.  These
include:  working with community, political and business leaders
to increase their awareness of Authority programs and the need
for water efficiency, reuse and repurification; good media
relations practices (distribution of press releases, arranging
electronic and print interviews and talk show appearances,
responding promptly to media requests for information), resulting
in water-related news stories and editorials; writing guest
editorials and letters to the editor; public service
announcements for electronic media; print, electronic, outdoor
and multilingual advertising as appropriate; development and
distribution of appropriate literature (bill inserts, brochures,
fact sheets, charts, etc.); speakers' presentations to community
groups; development of audiovisual presentation materials for
speakers; sponsorship of conservation-related
~0~Petitions/awards; presence (through booths, displays) at
community events; and coordinating all such
informational/educational efforts with appropriate gOvernmental
agencies, businesses and community groups.

School Education
The School Education Program focuses on educating young people
about where the region's water comes from and instilling in them
the importance of conservation.  An ongoing program for
kindergarten through 12th-grade students consists of development
curriculum, classroom presentations for fourth-graders, secondary
students, and in-service teacher training.  Other student-focused
activities include an interactive play about the history of water
in the San Diego area and importance of wise water use, a garden
designed to educate teachers and students about water-efficient
landscaping, a conservation patch program for youth groups, and a
water quality testing program emphasizing hands-on testing of
local waters.

Commercial, Industrial and Institutional
The Authority manages a program that offers audits to the top 10
percent of the commercial, industrial or institutional customers
of its participating member agencies.  Through the audits,
participants are encouraged to make cost-effective improvements
to their water use practices.

New Commercial, Industrial and Institutional
Information to encourage water use efficiency in design of new
commercial, industrial and institutional facilities is made
available through the Authority.

Conservation Pricino
The Authority bills its member agencies on a commodity basis for
metered water use.  Additionally, retail customers in the
Authority's service area are also billed on a commodity basis for

PAGE 54 Show Image
metered water use.

Residential Landscape Conservation
The Authority, in conjunction with its member agencies, has
offered workshops to alert local land use regulatory agencies of
their responsibilities relative to establishment and enforcement
of landscape water conservation ordinances.  Those
responsibilities are detailed in the state Water Conservation in
Landscaping Act.  The Authority and its member agencies have
served in an advisory role to assist these regulatory authorities
in designing the ordinances.  Finally, the Authority and its
member agencies have assisted in relaying information concerning
the new regulations to the local landscape industry.

Workshops to guide homeowners in design and maintenance of water
efficient residential landscapes have also been sponsored by the
Authority.  The workshops were held at the San Diego Zoo and San
Diego Wild Animal Park, and provided specific direction to
homeowners about water efficiency opportunities in their
residential landscape.

Water Waste Prohibition
While the Authority does not have jurisdiction over water waste
prohibition regulations, it has assisted its member agencies in
drafting such prohibitions in the past.

Water Conservation Coordinator
The Authority currently has four staff positions dedicated to
implementing its water conservation programs.

Financial Incentives
The Authority, in conjunction with its member agencies and MWD,
have offered direct financial incentives to participants in the
Showerhead Distribution, Public Facilities Irrigation Assistance,
Public Facilities Plumbing Assistance and ULFT Voucher/Rebate
programs.

Ultra-Low-Flush Toilet Replacement
The Authority, in conjunction with its member agencies and MwD,
has assisted in funding and operating three types of ULFT
replacement programs resulting in the installation of
approximately 200,000 ULFTs:

1.  ULFT Voucher/Rebate - Through this program participating
customers have been offered up to a $75 rebate or voucher toward
the purchase of an approved ULFT.  The Authority has operated the
program on behalf of its participating member agencies, except in
the city of San Diego, The city of San Diego operates its own
program with financial assistance from the Authority and MWD.

2.  Community Based ULFT Distribution - This program offers ULFTs
at no cost to low-income customers for installation in their
homes   The Authority operates the program, and community-bases
organizations distribute the ULFTs.  The program not only reaches

PAGE 55 Show Image
customers who have traditionally not participated in other
conservation programs, it also but provides employment
opportunities for community residents.

3.  Public Institutions Plumbing Retrofit - This program targets
public facilities (i.e. parks, libraries, schools and offices)
for installation of UThFTs and other efficient plumbing devices.
The Authority and MWD fund the purchase cost of the ULFTs, while
the public facility participants are responsible for assuring
installation.

Clothes Washer Rebates
SDG&E operates a clothes washing machine rebate program that is
partially funded by the Authority and MWD.  The program offers a
$100 rebate on approved water and energy conserving horizontal-
excerpts from 1995 Urban Water Management Plan
Implementation of Best Management Practices
axis clothes washing machines.

PAGE 56 Show Image
                                                         ~~jI~i½~LLt~
                                                                             Ni~.(~, {-~~`rni~~:.i

Wastewater rates
continue to rise for
               District customers                                                  ----                -~  -
                The Padre Dam Municipal  -  facility where it is processed !                  -              -.-. - --  -~
               Water District operates a waste-  - into reclaimed water.                          ~--.- -
water collection and disposal                  ge                          I                        ..~.          -~
               system that serves about three-  - Metropolitan Sewera                          .~~~,`,"Th%        -~
               fourths of the District's custom-    System upgrading       `                 --
ers. The wastewater service         The U. S. Environmental -                                        -
area includes all of the City of  Protection Agency and the fed-  -            --     ·-; 
Santee, the Pepper Drive area     eral Clean WaterAct of 1972 de-         -
of El Cajon and the Riverside     veloped several new regulations     The San Diego Metropolitan Wastewater Treatment Plant on
Drive portion of Lakeside.        for wastewater treatment facili-    Pt. Loma processes the wastewater for 1.8 million people.
  The District also owns and      ties in recent years. Facilities
operates the Santee Water Rec-    which discharge treated waste-      outfall to four miles offshore   water (sewer service) rates. In
lamation Facility which is lo-    water into a stream or ocean  -     and the relocation of the re-    recent years. the District has ah-
cated three miles north of the    must treat thc pn'duct to a         gional sludge proces sing facil- sorbed some of the higher costs
Santee Lakes . The facility pro-  cleaner level to reduce polluti~ui. ity. A new regional reclama-     and not passed on the full in-
duces one million gallons of        For the past few years the        tion plant is currently under    creases to customers.
reclaimed water which is used     City of San Diego opposed           construction in north San Diego.   The upgrade to the District's
to fill the seven Santee Lakes    these new "secondary treat-                                          reclamation facility will help
and itrigate the park landscap-   ment" requirements and ap-          Customer rates a                 offset future rate increases as
ing. An upgrade planned for       plied for a waiver for imple-       combination of costs             less wastewater will have to be
this year will produce an addi-                                         Padre Dam is a contracting     sent to the regional treatment
tional one million gallons of re-   ~~~~~~-  -~ -                     agency with the City of San      facility for processing. How-
claimed water. (See related
               story on page three.)          -  District's           Diego~s Metropolitan Sewer- ever. the difficult reali(y is that
                                                                      age System along with other the District and its customers

Most wastewater treated           reclamation                         sewer service agencies in the    must prepare for continued
                                                                      county. The rates charged to Pa- wastewater rate increases in
at Pt. Loma facility              facility vvill                               dre Dam customers are a com-   years to come - -
  Approximately 5.75 million      provide help in                              hi nation of the District's costs
gallons of wastewater are col-                                                 and those charged by the re-
lected each day from District     offsetting future                            gional wastewaterprocessor.
homes and businesses. Four-
                                  rate increases.          The District's costs include                -  In this issue...
fifths of this flows into the re-                          maintenance and operation of
gional collection system of the           .---.--------               the 142 miles of sewer mains.      Santee Lakes
San Diego Metropolitan Sew-                                           Employees must continually     -   camping discount p. 2
erage System, which is owned      mentation. As of mid-June           monitorandclean out the mains  -   District employees
and operated by the City of       1995, the EPA had given the         as well as respond to calls from   donate aid       p. 3
San Diego. The wastewater is      City preliminary approval for       customers. Wastewater rates
processed at the Pt. Loma treat-  this waiver.                        also include the operating costs   Reclamation
ment facility and disposed of in    Several required upgrades to      of the reclamation plant and       report          p. 3
an ocean outfall.                 the Metropolitan Sewerage           customer billing services.         Water use rules
  The other one-fifth of the      System  have been  imple-             As regional costs charged to -   still in effect      p..4
wastewater is diverted to the     mented. Some of these changes       Padre Dam have increased, the
Padre Dam water reclamation       are the extension of the ocean      District has had to raise waste-

PAGE 57 Show Image
           All in a day'swork                                         Ranger                                                    .,,~ffi'¼i~

           Santee Lakes interpretive programs                         Meier holds                                              ":-.- `Ir4

             Visitors have always come    well-balanced ecosystem and horned            ,,,~~
to the Santee Lakes to appreci-           provides a complete food chain   owl during
                                                                           a program
ate a little bit of nature in the         from the smallest to fl~ largest in the
city. But what most visitors              anim~'tls." Rare birds have also recreation   -
don't know, is that there is a            been spotted at (he park includ- center as                 .`~~4'
LOTofnature to be found at the            ing golden eagles, osprey,       Nancy                       N-
famous regional park.                     snowy egrets, great blue herons  Conney of
  "Visitors are surprised to              and black crowned night her-     Project
le~'tn~ the nttinber of wild birds        0105. The Audtiboti Society h'ts VVildlife
`itid `inimals that live here at the      cottt~ted over 175 species of    observes,
Santee Lakes," says ranger                birds at the S~'tntee Lakes.
Kevin Moreau. "We have seen                 The park's four rangers fre-
a four-point buck, bobcat, fox            quently give informal interpre-  The May program   held at the          A new successful venture
and raccoons. The park is a               tive talks to school children,   park's recreation center drew     for the park is the wood duck
`~  ;r;~:-. ~"`~:` `:~~~)~$?{:~~~~~ . ~-~  -   youth groups and scout      147 persons.                        nesting program. Moreau con-

               .""`,"`,     -                  troops visiting the park.       Meier has hcen involved for     tacted the Califoniia Waterf~~~~-l
                     ..`.`.;r~               Visitors with a specific        several years with Project        Association two years ago to
                                            J question will also seek        Wildlife's wild raptor team that  see ifthe park could put up nest-

      --     :~.     ~~.`.:;  -~ -~          ? out a ranger. Sharing         rehabilitates and releases in-    ing boxes. A CWA volunteer re-
    -                 -                        knowledge of the park's       jured birds back into the wild.   cently counted 121 eggs and
                        Ajh   -

                                               enjoyable part of the job.    to look up - there can be some    largest producer of wood ducks
                        -. - -. - "         natural environment is an        "I always remind park visitors    stated that the park was the
                                  -~          For the past two years,        wonderful birdsjust overhead."    in southern California. The
                               - -`         the park has offered for-          Some of the newer residents     multi-colored duck is consid-
                                            malized interpretive pro-        in homes near the park have       ered one of the most beautiftil
                        -                      grams. The free educa-        been surprised by unexpected      ill the world.
                                           tional programs started at        feathered guests.                   "Most people have an inter-
                        -                     the gazebo at Lake Five          Ranger  Moreau  recalls,        est in wild animals and wild-
                                          and by the fire-ring in the        "Once. a newcomer to the area     life." says Moneau. "The Santee

 -~                                            campground. They are          called the park office with a lot Lakes offers something for ev-
                              - -              new recreation center.        birds have gotten loose and           of park visitors who say
                                                 "The most popular           in my back yard. You need to      `Wow, 1 can't believe Ijust saw
                                               program is the Birds of       come get them.' I had to tell     that, right here in the city."'
                                               Pr~v," states Chief Rang-     him that the snowy egrets were    Call 448-2482 for the park's

                                               er Don Meier. Volunteers      wild birds and that they could
                                               from Project Wildlife         go anywhere they wanted!"         internretit'eprogram sche£ii,le.

Rangers Kevin Moreau and                  conduct the program with park
Don Meier (with bird of prey              rangers.  People really likc
model) answer questions                   to see the raptors up close.                            Nidre Dam Munic~a1
during an interpretive talk at            They are amazed at the actual
the Lake Five gazebo.                     size of the hawks and owls."                            Wa?er District

                                                                                                   10887 Woodside Ave.
                                                                                                      P.O. Box 719003
                                                                                                   Santee, CA 92072-9003

                 Santee Lakes Regional Park and Campground                                            (619)448-3111
                                                                                                       TDD 562-2778
        Owned and orerated by the Padre Dam Municipal Water District
                                                                    The `Spillway' is published by Pa-  agency govensed by a five-member
                                                                 dre Dam Municipal Water Distect to  Board of Directors, who are elected by
                                                                 inform as customers of matters con   voters for staggered tour-year terms.
                                                                 ceming their water and sewer service.      Board meetings are of'an to the

                                           F R E E             Please address any comments   public and are held at 3:30 p.m. the
                                                     regarding the newsletter to SpilIway'   second and fourth Tuesday of each
                                                                 Editor, address above. Padre Dam  month at the DisInet's administrative
                                                                        Waler District is a public  office.


     - -                            Phone: (619)448-2482                             Board of Directors
                                                                                  Douglas S. Wilson  DIvision 1
                                                                                Francis G. Daugherty  DIvision 2
                                                                                     Andy Menshek  DivIsion 3
                                                                              Wilma fl. Carroll  Divtslon't
 -       Present this coupon at the Santee takes Park office to receive            Dan McMillan  DIvision 5
         an additional 1 night camping with paid 2 nights camping.

PAGE 58 Show Image
D0istrictemloyeessend                                                         Available to community groups.
aidtoOklao ma City                                                            Call the Public Information Office

  Shocked and distraught by         which was sent to the local                        448-3111
the bombing of the Alfred           American Red Cross for disas-
P. Murrah Federal Building          ter relief efforts.
in Oklahoma City last April 19,       "On the morning following       Reclamation reo
Padre Dam employees orga-           the tragedy. many employees
nized a fund-raising drive to       were in shock." says Engineer-    Frm,ih  in  ,i  vene.'  of ongoing     a positive impact on the commu-
aid families affected by the        ing Dept. Supervisor Weston.      ~,~`,~~ ~ni ihefadhijes upgrade at     nitythrough increased purchases
tragedy.                            "A lot of people wanted to do     the  Di.~in~'t~'  `?`(`iwnaflon  phuit of construction materials, goods
  Two m'u,ager.s (`f the Eiigi-     somethi;~g right awly."           N('he,hd(.~!k) hegin fins year.        and services."
neering Department, Roland            "Asagoverumental agency.          Construction bids for the              The final paperwork on
Rossmiller and Steve Weston,        we know about the threats and     changes and upgrades at the            California state loans which
heard about the coordinated re-     violence that can happen to of;,  SanteeWaterReclamationFacil            will be used to partially fund
lief effort on KSDO radio dur-      fices throughout the country,     ity were advertised in May.            the project was being com-
ing their drive to work the         explains Weston. "We felt a       Interested contractors will su~
morning following the bomb-         kinship with the federal em-                                             pleted in May.
ing. They quickly put their         pioyees and their families. The   mit proposals in June. The win-          The District will also be re-
ideas into motion and several       announcement on the radio         ning (low responsible bidder)          ceiving financial incentives to
members of the engineering          gave us an opportunity to col-    w"llbeappmvedandawaxledtl'e            help fund the upgrade project
staff distributed collection en-    lectively express the heartfelt   contract by the Board of Direc-        from both the Metropolitan
                                                                      tors at a board meeting.               Water District of Southern
velopes to each District location   feelings of District employees.     Separate construction bids           California and the San Diego
and department.                       The District's efforts were     will be advertised for installing      County Water Authority. Since
  Within four days, District        also featured on a local televi-  the reclaimed water distribu-          Padre Dam will be offsetting
employees had collected $400        sion newscast on April 22.        tion pipeline system. The pro-         the need to purchase imported
                                                                      cess for selecting this contrac-       water by producing its own re-

       Hot weather gardening tips                                     tor will follow approximately          claimed water, these water
                                                                      one month later than the plant         wholesalers offer incentives to

 East county's high summer            ,.  Determine if your turf      construction selection.                agencies with water reclama-
and fall temperatures create an  -   roots are getting enough      "We expect a lot of interest              tion projects.
increase in outdoor watering         water to remain healthy.   from contractors for both these                The current project sched-
atid higher water bills. Follow-   Sample a 10-inch deep core contracts," states Harold Bailey,              ule will make reclaimed water
ing the tips below can help you       of soil. The soil around the    Director of Water Reclamation.         available for the peak irrigation
                                                                      "This construction project will        season of 1997.
maintain your landscaping and         grass roots should be slightly  create a numherofjobsand have
     use less water outdoors.         moist. Lawns need about one
     Water the lawn less fre-         inch of water applied over the
     quent~butforlongerpe~            surface per irrigation time.              Your cluestions...
     riods  time. Turf stud-              Determine the amount
 ies show most lawns only need            applied by your irriga-
 tobewateredeverythreedays.           tion system. Place sev-           Why don't we desalinate              New large distribution pipes
 If the lawn springs back arter a  eral l2-oz. coffee mugs at   sea water to increase the local              must be installed under city
 footstep, itdoes not need water. various places on the lawn.      water supply? itisso popular              streets to deliver the water to
                                      Turn on the sprinklers for 15   in the Middle East.                    homes and businesses inland.
     Water in the late even-          minutes. Then take the aver-                                          As costs for imported water
     ing or at night. Check
     the system in the day-           age depth of the amount of          Although  the  Pacific        continue to rise, the San Diego
 time for broken sprinkler            water collected in the mugs.    Ocean is close by, it would cost       County Water Authority is
                                                                      several times more to desalinate       studying sea water desalination
 heads and runoff.                    Calculate how long to run the
                                                                      ocean water and deliver it to          as a viable long-range water
 -~  Apply mulch such as              sprinklers in order to apply              ~
                                      one inch of water. Divide       an Diego homes than to im-             supply option.
     decorative  bark  or                                             port the same amount of water             By comparison, in the Mid-
     stream pebbles around            this time in half by about      from hundreds of miles away.           dIe East, new cities are built
                               45 minutes to allow for ad-
 the base of ornamental plants.                                         Ocean-front property for a           along the coast with desalina-
 Install drip irrigation lines to     equate soaking.                 plant site is needed for a water       tion plants incoroorated into the
 each plant.                                                          supply and brine (salt) disposal.      planning. Since oil and waste
                                                                      This adds to the cost as coastal       natural gas are plentiful, the en-
                                                                      land is either environmentally         ergy costs to run the plant are
                                                                      sensitive or very expensive.           not considered prohibitive. Fi-
                                                                        Enormous amounts of energy           nally, these desert regions have
                                                                      would be needed to run the plant.      no alternative water sources.

PAGE 59 Show Image
  the Frugal Friar says:                                   Area students benefit

     All District customers                                from District programs
    can receive discount                                  - For the second year, a stu-   Public  information  Board

    entrance fees at the                                  dent from West Hills High       Committee.
                                                          School  in  Santee  won  a       Middle school science teach-
    Santee Lakes. Call                                    $500 scholarship from the Cali- ers in the District's service area

    the Park Office at                                    ft~rnia Special Districts Asso- are able to use a new water

    448-2482 for details.                                   ciation. Tif-                            quality    test
                                                            fany Castelli,                           kit  in    the
                                                            a graduating       ~··   D,,                classroom.
                                                            senior,  sub-                               The test kit
                                                            mittedheres-                       6        was  de~el-
                                                            say to Padre                                oped for the
                                                            Dam. it was                                 San  Diego
                                                            one  of six  ~~  "5'`  L~ate~ 5~t  o~~      County Wi-
                                                            winning es-  (~j~t~~ ~~~~~~ Lb    ~Cd       ter Authority

                                                            says on spe-                                and is loaned
  We appreciate your efforts to use                         cial districts I                            to member
  water wisely and follow the water use                     selected  by                                agencies for
                                                                                                        teachers and
  restrictions currently in effect:                         :- In March, ?                              students  to

  1. At no time shall water be wasted.                      several  cre               -i               use. Students
                                                            ative students                    ~`        use the test
  2. Water shall not be allowed to leave your property      developed                  ,~    ~¼-~       kit to per-
   due to excess irrigation or neglect.                     artwork                                     form a vari-
                                                            the District                                etyoflabom-
  3. Repair all leaks within 48 hours of discovery.         in the Design                               tory tests on
  4. No washing of any paved surfaces except to alleviate   an Ad con-                                  different out-
   extreme safety or sanitation hazards.                    test sponsored                              door  water
                                                                                                        sources.
  5. A hose equipped with an automatic shut-off nozzle may  by `The Daily
                                                            Californian."                                 The Dis-
    be used at any time for watering or vehicle washing.    Emily Jones,  - -          "  .  . -~       trict `5 water


  6. Lawn watering or irrigation, other than by hand or by  a 6th grader  "Design an Ad winning         reclamation
    drip methods, is prohibited EXCEPT between the hours of at  Lakeside  drawing by Emily Jones.       facility re-
                                                          Middle School, submitted the    mains a popular attraction for
   4:00p.m. and 9:00 a.m. the following morning.          winning design, which featured  classmom tours. Over 90() el-


  7. Restaurants shall not serve water except when        the benefits of reclaimed water ementary and middle-school
    specifically requested.                               for outdoor irrigation. Entries students toured the facility dur-
                                                          were judged by the District's   ing the 1994-95 school year. -









a                                  -  

  10887 Woodside Avenue P.O. Box 719003 Saritee, CA 92072-9003











  it, t Pfl,
   -~    `ted o,, t"~ri'dpaper

PAGE 60 Show Image
                                                                                            · .             ---i



                                                                                --~,_ _







1994 Annual                                                                    .`~            State `Thn
Water Quality Report                                                          --,,            annual report
                                                                                              to District

  The Federal Safe Drinking Water Act of 1974 and its amend-                                  customers on
ments set strict nationwide standards and monitoring requirements           7                 the quality
for water purity. in addition, California has established its own                             of water
regulations for statewide water quality standards.                                            delivered to
  in 1989, the California Department of Health Services adopted
                                                                         -I/cc)               area homes
a new requirement that all water retailers must provide an annual
report to their customers showing water quality test results. The           0                 and businesses.
test results are compared to the federal and state permitted
maximum contaminant levels, or MCL's. The tests are taken                     0
at treatment plants on water that has been fully treated and is
ready for human consumption. This report covers testing in 1994.
If you have any questions, please call our Custonwr Service
Department at (619) 448-3111. Se habla espanol.


Your questions...
   Where does our water come from?                                    Is cryptosporidium present in our water?

   All of the water supplied to Padre Dam custo'i~ers comes           Cryptosporidium is a microscopic, disease-causing parasite
from the Metropolitan Water District of Southern California        found widely in surface waters across the U.S. The disease is eas-
(MWD) which imports it from northern California and the Colo-      ily transmitted by infected animals into these waters.
rado River. This water is treated at the Lake Skinner Filtration      The va~t majority ofAmericans `lit 1001 considered at risk Iti)r
Plant before reaching the San Diego area. From there it enters the contracting the disease. If individuals with weakened immune
San Diego County Water Authority and then the Padre Dam dis-       systems contract cryptosporidium, the illness can be extremely
tribution systems.                                                                                       (Continu,'d Ol? pO~ 4)
   Padre Dam also receives MWD water from a connection with
neighboring Helix Water District. Helix treats the water at their  ~ater Facts
R. M. Levy Treatment Plant in Lakeside. it then merges with our
supply at a connection near Lake Jennings Road. We are required          Did you know?
to provide you with testing results from both districts.

   Does Padre Dam test our water for safety?                         There is the - Only 3% of        You could

A                                                                    same amount   the earth's        survive about
   Each week, District technicians take water samples from test      of water on   water is fresh     a month
stations at 45 business and residential locations in the service area
to test for the presence of chlorine and bacteria. Chlorine is added earth today  and only 1%         without food,
by the Metropolitan and Helix Water Districts at their filtration    as there was is available        but only
plants to disinfect our water supply. Our local testing helps deter- 3 billion    for human           5 to 7 days
mine that the chlorine levels remain adequate and that no bacteria
is present. District officials work quickly to correct any problems  years ago.   consumption.        without water.
should they occur.

PAGE 61 Show Image
                                                 Padre Dam Municipal Water District
                                                  ANNUAL WATER QUALITY REPORT 1994
How to read
                                  PARAMETER                                                  NIWO      HELIX    COMBINED
this report...                                                   EEDERAL          STATh     SKINNER    LEVY     OVERALL
                                  PRlMARYSTANDARDS                 MCL            MCL       PLANT      PLANT      RANGE

In California, drinking water     CLARFrY
standards (also called Maxi-         Turbidity (NYU)                0.5           0.5        0.08        .06     0.02-0.11
mum Contaminant Levels or         MICROBIOLOGICAL
MCL's) are divided into two         Total Coliform Bacteria (a)(%)  5%             5%         .00       ·00         .00
categories.                         Fecal Coliform Bacteria (b)(%) (h)            (b)         .00                   .00

PRIMARY STANDARDS re-             ORGANIC CHEMICALS (mg/L)(c)
                                     Total Trihalomethanes (g)      0.10          0.11)    11.1)14         0.1162  I1.tr3-0.11))()
late to public health concerns,   INORGANIC CHEMICALS (mg/L)

such as the presence of any         Aluminum                       NS              1.0       0.244      0.17     0.14-0.39
hannful compounds. These are        Antimony                        0.006          0.006    ND         ND          ND
set by the California Department    Arsenic                        11.05           1.05     NI)        NI)       Nl).())x)2
of Health Services and the U.S.     Asbestos (d)                    7.0            7A)      ND         ND          ND
Environmental Protection            Barium                          2.0            1.0       0.118      0.148   0.100-0.148
                                    Beryllium                       0.004          0.004    ND         ND          ND
Agency.                             Cadmium
                                    Chmmium                         0.005         0.005     ND         ND         ND
SECONDARY STANDARDS                 Cyanide                         0.1            0.05     NI)        ND         ND
                                                                    0.02           0.02     ND         ND         ND
relate to aesthetic qualities such  Fluoride (e)                  4.0 (2.0***)   I A-2.4     0.24       0.27    0.16-0.311
as taste, odor and color and are    Lead (1)                      (1)           (1)         ND         ND         NI)
                                    Mercury                         0.002         0.002     NI)        ND         ND
set by the California Department    Nickel                          0.1           0.1       ND         ND         ND

of Health Services. Both tylees of  Nittate (as NO3)               45            45          0.16        64       .06-.92
standards are listed in the tables. Selenium                        0.05          0.05       0.002       ND      ND-0.002
                                     Thallium                       0.002         0.002     ND         ND         ND
PARAMElER is the term useel       RADIONUCUDES (pCi/L)
to designate what is heing tested   Gross Alpha                     15           15          1.7         33      ND~4.7
and measured in the report.         Gmss Beta                       50*          50          3.7         3.11    ND.7.3

FEDERAL MCL is the accept-          Radium 226                  5(20*)            5         ND         <5        ND-<5
                                    Radon                        31)0*           NS         NI)        <5        ND-IS
able level thaI certain contami-  .  Stmntium-90                   11             8         NI)         0.9      ND-3.6
nants may he present in drink-      Tritium
                                    Uranium                     20.000       20,000         ND       1114      ND-4(X)

ing water according to the
                                                                   30*          2(1          6          3       2-11
federal government,                                                                         M~I)         HEI~IX   COMBINED

STATh MCL is the acceptable       SECONDARY STANDARDS            EEMDF(IttAL      SliTACTh SPKLlNANNYR LEVY     OVERALL

level according to the state gov- CHEMICAL PARAMETERS (mg/L)
emment.
                                    Aluminum                     0.05-0.2         0.21)     1)244       0.17    0.14-0.272

Padre Dam Municipal Water           Chloride
District cust?mers should view      Color                          250       250~500**      96        101   119-11)3
the columns labeled MWD             Copper (1)                     15            15
                                                                                             -          1        1-3
                                                                  (1)             1.0(1)   NI)        NI)      ND-().1)13
                                    Foaming Agents (MBAS)           0.5           0.5      NI)        NI)        NI)
SKINNER PLANTand HELIX              lmn                             0.3           1.3       NI)        NI)       NI)
LEVY PLANt In some areas            Manganese                       tW5            0.1)5   NI)         NI)        ND
                                    OdorThresho1d(TON~th            3              3       1h1         (hI       (h)
E)f the District, these water       Silver                          0.1            0.1     NI)         NI)       NI)

~ources are blended. Both            Specific Conductance (~mho/cm NS  9()(1~ I6111l**   1(137        941.4 IX- 1053
ources should he considered as       Sulfate                     251)      25I).500**     26()       2111     21P-MM
~our water supply. These num-        Total Dissolved So1id~       500    500- lt1f1**     6111      6111)   549-721)
)ers should be compared to the       Zinc                           5.0          5.11       ND         ND         ND
TDERAL MCL and STATE              ADDITIONAL PARAMETERS (mg/L)
ACL columns.                        Calcium                         NS             NS       72         76    6(1-111
                                    Cryptosporidium (i)             NS             NS      (i)        (il        (i)


 OMBINED   OVERALL                  Giasdia(i)                     NS             NS       Ii)        (i)        (i)
                                    Hardness (CaCO3~               NS             NS       296       2111.5 1 10-362.9
 ANGE indicates the least           (grlgal)                       NS             NS        17.3       16.5   9.4-21.2

id greatest amount of a MCL         Magnesium                      NS             NS       211         32          3.5-32
tected at hoth the Skinner and      pH (units)                    6.5-11.5       6.5-8.5     7.96       7.8        7.22-8A
    I                               Potassium                      NS             NS        4.11        4.6    4.1-6.5
 ~~~ants.te,st~~ultfigures          Sotlitim                       NS             NS       lO~       1119    119-115
e yeaiiy at'ernge.s.

PAGE 62 Show Image
                c~~~ Padre Dam Municipal
                                        Water District
                                                                                                  Special
 Notes                                   Measuring the maximum                                    considerations...
 All MCLs are measured in "parts  contaminant                      levels                        Fluoride Our community does
 per million" unless otherwise                                                                   not add fluoride to the water
 indicated. Parts per million is an                                                              we receive from MWD. If you
 equivalent measurement to                  drinking                   is                        are concerned about the
 "milligrams per liter."              Your                       water
                                                                               use of fluoride to prevent

a. Cannot be present in >5% of                                absolutely safe and well           tooth decay, see your dentist
   monthly required number of                                     within the federal and         about supplemental tablets or
   samples.                                                                                      treatments.
                                                                 state guidellnes.               Fish owners MWD disinfrt't~
b. The occurrence of 2 con-
   secutive total Coliform posi-                                                                 our water with chlottimines. j'
   tive samples. one of which is                           Precise laboratory equipment can      combination of chlorine and
   Fecal ColiformlE coli, con-                            detect minute traces of compounds      ammonia. Except for a slight
   stitutes an acute MCL viola-                             identified by the U.S. Environ-      odor or taste, this is not hani~il
   tion. Standards and results                             mental Protection Agency. Treat-      to the general public. However,
   based on distribution system
   sampling.                                           ment plant laboratories are strictly      cloramines must be removed
                                                          monitored by the state Department      before the water can be used in

c. 50 additional organic chem-                                   of Health for testing accuracy. aquariums. Consult with an
   icals were also tested                                                                        a
                                                            The federal and state standards      quarium supplier for chloram-
   but are not included here.                                                                    ine removal methods.
   All compounds were "not              are measured in parts per million and parts per bil-
   detected" in the testing. Data  lion. Note the following equivalent comparisons when re-      Kidney dialysis patients
   available upon request. viewing the test data included in this report:                        Chloramines must also be re-
                                                                                                 moved before tap water can be

d. Measured in million fibers per 1 part per million is:            1 part per billion is:       used by home kidney dialysis
   liter(longerthan 10 microns).  1 cent in $10,000                 I cent in $10,000,000        patients. Consult with a physi-

                                                                                                 cian in these cases for the proper
e. Federal level of 2 mg/liter is I minute in 2 years               I minute in 2,000 years      chloramine removal method.
   a secondary standard. The      I inch in 16 miles                I inch in 16,000 miles
   state level is dependent upon
   temperature.
                                                                                                     ATTENTION
 f. Federal MCL has been                  Key to Abbreviations                                          PROPERTY
  replaced by an action level
   which requires agencies to      MCL               Maximum Contaminant Level                      OWNERS AND
   show optimal corrosion con-                                                                       MANAGERS
   trol treatment.                 ND                Not detected in the testing                    Certain residents in
                                                                                                    multi-family housing or
g. Padre Dam distribution system   NS                No standard has yet been set by the federal or employees in local husi-
   samples were analyzed in                          state regulators                               nesses ma not receive a
   1994, range .034 to .097. over-                                                                          y
   all avcragc wis .054 mg/L.      NTU               Ncpl0cl~~i~ietric Turbidity Units              copy ~r this report if the

h. MWD and Helix use a flavor                        (suspended materials in tIle water)            property owner or man-
                                                                                                    ager receives the water
   profile analysis method.                                                                         bill. While not required
   Padre Dam distribution          piCilL            picoCuries per liter                           by law. the District urges
   system samples were analyz-     ttmhos/cm         micromhos per centimeter                       you to provide this infor-
   ed in 1994, overall average                                                                      mation to all residents
   was 3.                                            l'ess than
                                                                                 and employees. Call us
   Padre Dam distribution          *                 Proposed standard                              for additional copies
   system samples were analyz-                                                                      available free of charge.
   ed in 1994. neither organism    **                R~commended maximum level range                This report may be pho-
   was detected. Helix tested                                                                       tocopied and distributed
   eight plant effluent samples in ~~~               Secondary standard                             as needed.
   1994, no organisms detected.

PAGE 63 Show Image
Your questions...                                                                   .~~~, ~dre Dam Municipai
            I)
serious. In November 1994, Padre Dam tested its Water for both                               lOitipoTWsOOdox;id~~ve
giardia (a common parasite) and cryptosporidium. Neither organ-                              Santee' CA 92072-9003
                                                                                            (619) 448~3111
ism was detected.                                                                             ThO 562~27'8


6 ~                                                         -      The "Spillway" is published by Pa agency governed by a fIve~rnernher
   What causes cloudy water or had odors?              -    d~rte~~rn~~ Mcuusfo~meIOarslV~traerttD:r~Cctonto Board of        who are ejected by
                                                                 caming their water and sewer senece    Board r'eel~ngs are open to the
   Cloudy or milky-looking Water is usually caused by trapped         Please address any %~reittwantSpublic    are hetd at 3:30
air bubbles picked up from air in a water main or aqueduct, much            Editor, aodrass above p~d~~~~~~ month at the DistncI's
like a cascading waterfall. After water sits in a glass for a few Muniopal Water Distr)ct is a pubic live Office
minutes, the tiny air bubbles will dissipate. Odors can be caused                              Board of Directors
                                                                   Douglas S. Wilson  Division 1, President

by harmless algae that persists in water even after chlorine has                       ~raOciSAndG O~S~~he~~~  Division 2

been added at a treatment plant. A cross-connection in your home                              n. ~n:~~:~ Division 4
or neighborhood can create a dangerous backup, causing unpleas-                         Dan McMillan Division S
ant odors. PLEASE CALL THE DISTRICT if you detect any
odors so that we can investigate the problem.
                                                                                                                            Are hottled and filtered water s~fer to drink?

   Is there lead in our water?                                                 Your tap water is perfectly safe to drink. However, because of.

    Tests performed in 1994 on the District's imported water sup-          taste preferences, some people prefer to purchase bottled water or
ply showed no lead in the water leaving the MWD and Helix                  install a filtration device.
filtration plants. However, it is possible for lead to be absorbed            Don't be misled by high-pressure salespersons who telephone
into a domestic or commercial building from lead soldering in the          you identifying themselves as "from the water company. They
interior plumbing pipes.                                                   may warn that your water is contaminated and ask to visit your
   The public water supply contains several naturally occurring            home to make a "water test." Our employees will always correct ly
minerals, such as calcium. which coat the inside of pipes, help~           identify themselves over the phone and will not ask to enter your
ing prevent corrosion and leaching of lead into the water. You may         home unless you have contacted the District for a service call.
recognize calcium as "hard water stains" on your plumb-                       Some bottled water companies use the public supply. simply
ing fixtures.                                                              filtering it further. Filtration devices can be very expensive and
   Lead solder was banned from use in domestic interior water              some needlessly flush away large quantities of wafer down the
pipes and fixtures after 1986. if you are concerned about lead in          drain. Shop carefully and compare costs before you buy. Your public
your water, first verify that your pipes or fixtures contain lead and      water supply will always remain a bargain.
then obtain a test to check for lead from an independent labora-              -    -~ --
tory. Minimize any possible exposure by allowing tap water to              This report was prepared by the Padrc t)ttt0 Mtitiicip'il W'itcr I)istrict ii' coop
run forafewseconds (ifthe tap has not been used forsix hours or            eration with the Metroplitan Water District of Southern Calil-orni'.' and Ilic

more) before using water for drinking or cooking. Use this water           Helix Water District of La Mesa. California. If y(fl1 have any questions, pleise
                                                                           call the Padre Dam Municipal Water District Customer Service Departinetit at
for non-drinking purposes.                         -  (619) 448~3l II TDD (619) .562-277X. Sc hahla espaiiol.









                                    "Ii,   .`..~.,.

10887 Woodside Avenue. P.O. Box 719003. Santee, CA 92072-9003

Special Edition   Water Quality Report








~  t Pri,rtedo,i ,rc~'c1ed paper.

PAGE 64 Show Image
                                            w                                       W=~~&~w~=~w=~                               C

                     $ ~                      -                                                               C             _
                                                                                      - w      W


                                                                                   0    ~         V,          Z   w
                                                                                  w                      w           ~      z
                                                    w                       _                  w                     -      0
                                            ~       z      ~                _     =     w                Z
                                            uJ      w      -                      z
                                                                       C  ~       _     _         `J     w    ~                 0    -

                                                    z                                             =      ~     0  ~         ~   =
                                                                                                     ~   0     0  ~   0     ~
                                   ~        Lu                                     0~   0       0~   =            ~         w
                                   -uJ      ~                               V,-                    <0     ~

                                                            U                - ~ 0 _ 0> ~ 0 ~ C ~
                                    <  <  =  uJ                       -                               ~ < ~                 wW~
              ½                  -                                      -~  0~    =<                                 0      z<  Oz Q&j
                                                                                  a                      V,   <

















-
V                             - 0                    0  CC                     C    C   C       C                     0)
                                                                               C    C   C       0 CC      ~ Co        Co
                                   -,                `oCC,  ~                           _  _  _


                                                                                                          t E   ~      S
                                                                                                           = ~  0) ~
                                                                                                         C Co         0)
                 E      ~~~                                            ~-                                  =~~ ~~Cooo'

                                                                                  0)                        0) C C
                                                                                                              Co C 0) =

                                                          _                                                   ~
                                                                                                             C O~      ~
                                                          Co~                                             -C C


   a)0)C   m00O0E.                                                                0).                    0)C 0)~=0) ~= :--
                                                          Co               0  :o    ~                                 tCoE~~>0)
                                                          C                                       =             C0)=0)Co~~    C


~  ~<0)rn~   oO..     --            0      =~     flC   C                                         Co
                                                                                 C                ~
                                           Co                                0  ~       _         ~
      C-                -                      0).-  Co  0)            -  ..   -       0)      ~           = 0
                           {~~~=Co      Co~~   E     V                         _    Co            Co             VCo 0) .t ~ Co

           0)a;~=0)     ~~~E--a  =c                                   rWO      .           =ubC  ~         0)0)~=O~CObV~
                                                                                                  ~     E m 0) V ~          X

~  E CCCC      ~ V                    - 0) V             0)               ~   ~               Co              Co   ~    ~
                                           -                                  -                                   Co `0
                                      Co   ~=    Co       C                   ~=        ~      E  CoC     Co~ ~
~~O~v,Co'0C                                    Co    Co                                        =          00)    ~ 0)0)
                                                         ~Co          ~           ..              a       CC=~=>=~~                  `p












                                                                          V                                      .- V,
                                                           g                                       0)                           V,
                                                          =       ~  E .`e                         0) _ .-    0)  2 0)V,
                                                       -Co  V~    ~  ~  V                    _  E  C            ~  0
                 Iqj                                   =  =                ~o ~  V,    ~              V,~  E   ~V,  ~ =   ~
                                                                  0)       V, ·> 0)    ~      V                  ~ CC     Co ~ =

                 -   U                    -             N  Co V     ~             V              V,= C0) E    C   ~       ~  0)  0)0)
                     ~     0   ~        - -            0)    0)     ~        V0)  ~        0)  C V0)  E  V0   ~        ~


                                                                     00)~CoV ;o½ ~ 0)   ~        ~  0)         0) C ·~-   t VV, E
                     ~  .~   S                 -~      )0)OVtV= 0)V,~   ~     o>2~ ~~~  0)>C~ ~        ·0)V~     ~:5~~
                                                                                  C                    0)V,      Co       V     0






                                            Co                                                   0)

                                                                  0)
                                             V             ~      Co
                                            0)       C                                        V         Co
                 C-   ~            V         0           0)                                             0)
                      .~   ~,  L'  __       V,
                                                              V,  =                       _  =    C
                                   C    ~  Co             V0) ~                   C            0         Co
                                                          _                C     0)     ~     Co  V,    0)
                                   =    V        V    ~                V,        V,   0)      ~   C      V
                                   0    C        C  0)   0)   V   0)       V     0)               C

            ~    fl            -~          _                               _         0  ~
            ~  r-    -~            V,       CoV~     C   0)   ~~  ~    E   0)          _         0)     0)
                                                     ~~~          0)V,~~           0)~~      ~~          V,

PAGE 65 Show Image
               _                                                  -~
                                             ~
            0 =         ,-.                     .~ ~    =       = `J   =
                                       = ~              ~              =
                =
             ~ .0-
                                       =0            =    ~     E ~      =
                                      .2 ~        ~
       a)                              =     =
          a)a)~                                 a)           a)
                                             --=
                                        0
       Oa)~                          ~                  .-~=a)~
                                     = ~                 =t~     =-    E~-=
     ~ E ~                   -       ~t             a)~.=~~= a)> E 0     E
       0a)                   ~~      Ea)                   o~~~-~~~ ~    ~-              LLJ  - --
    U                                =          ~ E          =     E=     ~
                                                           0=
    _                                               U S                  a) 0               .      -
    _         0 E =.                                       ~ >  t --     =    -.
                                   ~~                                a)  _            ~= z ---
          a)    = ~                                        ~a)  --~=
                                   a)                    =~w =~~~ ~~     N0~~~        ~
    r.  ~         =                                 a) a)  .~ ~          a) == a)           I
   ~                                      ~~8 ~~Na)U                 = =                   - - -
                                              0 -~                `- - = =
                                             = ~ > ~                       = =
     -  a)  ~                      a) a)~~            = a)
                                  ~ a)       .    a)    a) a)~ > - .-- a) ~ == a)
    L =~=~>=            ~           ~~ :--   ~         =-a)a) `~~                     ~.~
                                    = ~ 0    ~- t~v'    ~     ~      0      ~ 0= 0    ~   1.---- -
                ~     ~=a)=
                              -~                ~-       a).-              ~ a)
                                    =a)=~~   L~=~~            -=~~~=~
   r- 0         ~      a)~0      ~~    0        0   0      >~=    ~                       -
          0 =    =   ~.= >  E ~        =                    =
           a)~=a)0   =~     ~~=~= a)         :;~~~~~ = 0      `      0
      a)  > ~     ~~     0~ ~      a)        .>
      -Lu ~    =  ~  =  0 ~ ~5 =    5= .~       a)       NO =     ~= E  =    =~       ~
      >   a)         0    ~       a)  ~ =    -- .~  -~a) a) =  -  ~  =      0~ ~
                                                                      ~  0= a)

          a)   a),      a)       = a)                               0
      o        ~ =     =a)~~a)a) a) ~ = =                            a)  ~       -~    ~
               ~= E      E       E ~ 0
                         -                                                            ~ ~-
                                 ~=  ~>~          ~~                  =         ~ 0    a)
                                     =            - a)                0
   a) .5 0 ~~         Ua) ~ =a) ~ a)    ~                                0
   U  ~~~~ a)    =   =     V,     =~ ~ a)          0 ~                          o1 a) = ~V,
                                   5               E a)~            L~.~ ~~          a)~V
         ?~ Ha)E~~      ~2-==~ ~o= == ~ .a)~       0~~a)=~
                ~ =                             a)        ~o                a) a) ~    =
           ~ U = ~ 0 a)     = ~ a) t   ~                  =              E = = = =  0  -
  ~      a) 0 ~ =.- =       0                             -                         =
           o= ~~ ~~ E 0  0 ~       ~ = a)       a)  ~ `J a)              ~       =
                = 0 ~            = ~       0       E ~ ~ 0           -           ~
       (I)     a) - ~                          0         _                0 ~ = =    0
    a)    t ~    ~ a)        ·~ =  0                    0                     -    .9
                    -           =        ~ S a) ~        ~ =                     0
  &   ~      0 0 ~=   &.- =~ E -~ 0 ~                                          ~ = ~ -~
                 =                                                             = -
     -  -                   -    0 .     =                                    ~ 0   = Co
     a)  .a)~ =                   ~~  8 a)    -~                           =.-  =     ~~r)
  V  ~  0   t ~=     - - = ~          ~ =    =     - - -    o           a)    ~ -   - a)
                            a) ~   0
       a)   0 E == =~~            a)  = ~-    0                                    a)~~a)=~~                =
     a)0       ~   0~    -:-~-~~~=-~~ o=0- ~         c a)E                       ~a)~0~o~
     ~      a)0.=> ~              0   ~ `J                   ~~       a)a)      0    ~
   ~ ~o       0          =~ ~         2~ E 0=5     =0         ·~           -=  =-  a)   ~
  t~~0                           -  ~ o~ -                       .            ~    22
       -a)           -   a)       a)                            --
     0=      a)   0 ~~   ~~ = =     ~ a) ~~~ n            ~c0~   %   ~ = V,~        0 a)
                         a) -.        a)~ V, -~ ~    ~ = ~ a) -              . a)
   ~  ~~~~.~oa)~  ~          ¼=~ V, = = a) ~ 8  ~                        ~0 ~= ~ ~= ~        - -    a)
     ~  0 a) a) a) ~=~    ?~ SE -~ ~ H ~        ~  8 ~~              .=       a)> ~ -~ t    ->  >  = -~
                                                                                       a)
         ~    a) 2            ~ 0    ~ ~ = a)  ~~.;  = = .9
    a) -= .>    -~    .   a) =   .       - .= ~ .              -~             ~    =             .=     -  _    ~ =
       V,                                =    2    `O~         S     a) _ _        ~~~N-                     -
          a)    2  =    2 a)            a) -                -  a)--0~-~            ;~~:--------              ..      =
     ~0  0 2   50  2  -~   =   =      a)                                        =~~                                  V,
                         ~ H ~ ~ 0    V,   0               --                  0 ~
                                                            -          .= ~

                                             5 ~      a)
              t~    a)a)                                ~ a)           2'
    ~      0 = ~       2 ~:~                           =
    t      - ~ = ~                          a) -                         a)                               a)
    0       = a) ~~     0 =                   a) a) ~2 ~   2.2 a).a)     ~.>  _ =                         a)~0       a)
       0 2 ~ =~= ~                 =                a) -a) a)   2 =~    2       0  a)                        =
                                                           = =                       a)    -~                   ~ 0
         _ a) ~~ a)                0       ~~ E   o          -~ a)              a)~ .~ -~          ~ V        0 S    a)
           t a) .2 Z 0 ~ 0    2    =  =           -
         a) o0 ~     0         ~ = =              - r 2      a)a)    ~ -     U      =~ ~           ~? a)        ~ - -- -
                                                                                                   -E
       --S~=-~ 0.~ a) >0         a).=0                     ~~0=.~      U-       0 t~t              ~~~~
        ~ 2          U a) a)       ~ 2 ~                   a).-           o0  >`   ~ ~=     0 ~                 =
               0 ~ V, = ~ = =       - -.-                   - = -~ =         -
    S    =-~ ~   2=a)~ThV,~ t ~t~a) -           I           =~~= a)a)  ~2U   =~  - 0a)  ~a) a)~           -= a) ~
         `J                                                                        ~   0                  `J 0-
   a)    ~~ a)   a) - = 0   5.- ~ =                         = = = =0 __      =00 ~                     0       -
                            -                               ~ 0           ~= ~ =   =   . ~a) ~ a)            a).-
          - a) = = = ~ = =      a)                       -      2                                -         -       .-- =
                     -.-                                    =   -                                  2244]~ C ~
                -   -                                                .- ~                 ~ = ~ = ~ a)      0~ = >0 ~
       a) ~  = =    =           =                 -         =-  0               V,                   - -   -~    a) a)
                       a) a)  0 `j                - -       ~0   ~     0     ~ a)                 ~0    ~  -     a) = .2
    -~ >     ~ 0 a)                                          -                  =             U      m -   =   -
             = =  2 - =-  =     = -           /5          a)  ~a) .--    a)    ~a)             =a)         =  a) a)
                             a) 0              ,           -
          ~ 2  ~    ==       -                                         -~                          _ ___
                      -                                           -                         a)0    _ ___    0
    =  -  ~  = 0    0                                        0  - 0   ~ -                                 ~~a)      ~~a)
    =  -       =- =                                          0 a)  ~  a)        a)
       -  a) =    -                               0        -           0           ~          0 ~ 0     ~  Lu .> ~
       a) -                                                0 -  -    - - a)  ~-~                 -
Co      2~=~So2S                      yO                       a) ~¼a)~     ~     o~=o~5o    -:          2~
        o a) ~U                                  -~         0~~a) ~~ C0
                                                                                    o~a)  Ea)~~~     ~<
                      ~ =                         -                     -~    .2 a)   ~ U ~  5 ~~ 8  ~             ~,Na)
                                                0    ~~a) ~o~~                        fo.-  -::=~~ :~            =  - -
          a)~a)                              a)  = -        ~a)                     -                                 U
                                                - ~            0 -                   ~ 0 -
   a)  0                                                     =       a)  C~=o     0    -  ~~o.2=~o~E~               ~---
         0 = =                                     -     a)          -
           = 0                                 0 - 0        - ~~ fl  0  -.-     C             ~ 0 ~  -           ~ = 2 -
~   H      = -                              <~ 2  ~~        ~a)-~    =                           0              0    .2
                                                            ~ 2=               0  ~ 0 =  ~ 0                         a)
                                                                        0 V, - ~ - ~                        t"~=~ o2 2 20

PAGE 66 Show Image
                 ~¶r=~e'r.2~-'~~- v~<1~'~g.~~~
                  Single family dwellings
Please see reverse side for additional billing information. For
accounts other than single family dwellings, please call the
Customer Service Department.

         r,i~

,1vt£~,. .1~~'             ~~r,RateAndusageaflowanceuncer

CUSTOMERS                      10% voluntary reduction goal
WITH GALLON
REGISTER METERS         TIER       RATE       TOTAL GALLONS
                               (pore for  I    (allowed in biff~ng
Includes portions               1100 gaf~~      period per f~)

ofElCajonand                        -~         -   --  -
Lakeside            Lifeline     $0.1 982           0 15,000



                    Standard 1     0.2158  - 15,001 - 80,000



                    Standard II    0.2674     80,001 & above



 -                       Ter, Rate And usage allowance under

CUSTOMERS                      10% voluntary reduction goal
WITH CUBIC FEET
REGISTER METERS         TIER       RATE     - TOTAL CUBIC FEET
                                 (pnce for 100 -   (allowed in bIfing
Communities of                    cubic feet)   pteod per f~r)

Alpine, Crest,
Flinn Springs,       Lifeline     S1.345            0- 2,000
Harbison Canyon,    -
Blossom Valley,     -
Dehesa                       -
                    Standard 1      1.431  -  2,001  10,700 -
1 cubic foot = 7.5 gallons


                    Standard II    1.542      10,701 & above


    I ~, If <-! s `.
$12 per bi-monthly billing period
System charge increases for larger size meters
TlrPFr) PlI INC,  tIll Ir I I t~r   All residential accounts are billed
in three blocks or tiers which have been developed to encourage
conservation by charging a higher price as more water is used in the
-billing periocI. The Lifeline tier applies to all residential accounts.

Rates effective with bitls mailed an or after 6/30/9S.

PAGE 67 Show Image
            (`F    `~? ) ~"~ `je~

$43 flat rate per bi-monthly billing period based
on average water usage in one equivalent single family
dwelling unit. For accounts other than single family
dwellings, please call the Customer Service Dept.



F.                        



                   PUMPING ZONE  RATE PElt 100 GALLONS

CUSTOMERS

WITH GALLON        Fletcher Hills   $00.0138
REGISTER METERS


                   Shadow Hills      00.0147


                   PUMPING ZONE  RATE PElt 100 CUBIC ~EEr

CUSTOMERS

WITH CUBIC FEET    Zone I            $00.142
REGISTER METERS


                   Zone II           00.283

                   Zone III          00.503

                   Zone IV           00.604

                   Zone V            00.748



                                 ·~MO~m?LY' MO~~flwL~
                  System charge    $12.00   $6.00

BASED ON

30,000 GALLONS     Water use        62.10   31.05
USED IN
BI~MONThLY
BILLING PERIOD     Sewer charge     43.00   21.50


                  TOTAL          $117.10   $58.55


                   System charge   $12.00   $6.00
BASED ON

5,347 CUBIC FEET
(40,000 GALLONS)   Water use        74.12   37.06
USED IN
BI-MONTHLY         Pumping/energ
BILLING PERIOD     based on Zone II 26.66   13.33

                  TOTAL            $112.78  $56.39

                  Customers are currently biled bi~monthly
Rates effective with bills mailed on or otter 6/30j95 -

PAGE 68 Show Image
                                                     I                                         -~

                                    CUSTOMER INFORMATION


Customer programs               Monitor your water use by reading your meter
The District offers several programs    Your water meterrecoms the amount of water used,justas an automobile's odom-
to help customers reduce water con-    eter records the number of miles driven. The meter is never reset. The last two
sumption and conserve the avai~able    digits on the register (horiwntal line of numbers) are not used in computing the
watersupply. Free conservation litera-    bill. The water usage on the bill is measured in units of 100, either gallons or
ture is available at the office. Please    cubic feet. To determine your meter type, lift the meter cover and match with the
call the Conservation Department for    diagrams below. The samples show how the numbers on the meter register are
information on current programs of-    used to determine water usage. Converiaon table: 1 cubic foot =7.5 gallons
fered to customers.                        GALLON METER                  CUBIC FEET METER
                                         Santee area                     Eastern service area
Spiliway newsletter                                -
The District publishes a customer          9
newsletter four times a year which                   I
is enclosed with the bills. The         8  A         -2              _
"Spillway" gives conservation tips as
well as timely information on District   ~    GALLONS                ;,    CUlIC FEE~
projectsandoperations.                     0 56 7 :  i                     123
-                                       6           4
Santee Lakes park
The District owns and operates the         567 Billing Units or          123 Billing Units or
Santee Lakes Regional Park and         56,780 Gallons                    12,345 Cubic Feet
Campground, an innovative reclama-    To test for a possible leak on your property or indoor plumbing system, stop all
tion project. District customers can    water use inside and out Note the position of the sweep hand and the numbers on
receive a discount entrance sticker   the register. Wait about 4 hours and recheck. If the hand has moved or the num-
for each registered vehicle by bring-    bers changed, water is leaking somewhere in your system. Some meters have a
ing a current vehicle registration form    small triangle which rotates when small amounts of water are being used.
to the Lake 5 park office.             Meters are inside a rectangular concrete box usually located near the roadway.


                                                                  Water softener
                 he following conservation measures are mandatory restrictions

                                                                     The District has operated a wastewa-
                                                                     ter reclamation plant since 1961. The
                  2. Water shall not be allowed to leave your        reclaimed water must meet very strict
                    property due to excess irrigation or neglect.    standards to be used for irrigation and

                  3. Repair all lealcs within 48 hours of discovery. filling the seven Santee Lakes.
                                                                     A District Ordinance prohibits the use
                  4. No washing of any paved surfaces except to      of self-regenerative water softeners in
                    alleviate extreme safety or sanitation hazards.  most parts of the sewer service area.

                  5. A hose equipped with an automatic shut-off      These water softeners (the type you
                    nozzle may be used at any time for watering or   recharge at home by adding salt) flush
                   vehicle washing.                                  salts and other waste material into the
                  6. Lawn watering or irrigation, other than by      sewer system. This salt makes it diffi-
                    hand or drip methods, is prohibited EXCEPT       cult to meet reclaimed water standards.
                    between the hours of 4:00 p.m. and 9:00 a.m.     Your compliance with the Ordinance
                    the following morning.                           is appreciated.




   Violation of the above water restridions can result in monetary penalties. (-~-See ~~.-.` Pb- ...~.~~.. on -rig WonuLlon
                                                                1O8S~   ~~ Avm~, P.O Box fl9OO3, S~n(xx, CA 92O?2~9OO3
                                                                (619)4483111 1110 s62~77S Oke ~! S:OO a.m.-S:OO pm.
                                                                

PAGE 69 Show Image
                                         CUSTOMER  INFORMATION


The Padre Dam Municipal Water
District is a public agency, called      Water pressure                                  Department
a special district, governed by          variations                                      phone numbers
five elected officials. Each director    Due to the varying elevations served            BillingI
represents a geographic region of the    by the District, there may be occasions         Customer Service        448-3111
service area.                            when the waler pressure at a service            Hours: 8:00 a.m. - 5:00 p.m.
                                         connection varies or is less or more            Water qualityl

Unique service groups                    than desired.                             Operations                   448-4551
The District provides both water and     Some customers install a pressure         Hours: 7:00 a.m              3:30 p.m.
sewer to the majority ofits customers.   pump or regulator unit at the property    Water pressurel
There are several unique service ar-     to maintain a constant pressure to the    Engineering                  448-3111
ear within the District. Please refrrto  household plumbing. A pump guard          Hours: 7:00a.m. -             4:00p.m.
the lVeThrn,ze Letter for ~our accoit,it switch is recommended. Ci~strn,~err       Conservation I
~imnber a,~sen~ce ~pe.                   are respotisiblefor nzw)itaiiri,ig llzeir Public Information           448-3111

Pepper Drive area - El Cajon             o~vIipw~Ipi~igrnidpressureeq,glonie,1t          Hours: 8:00a.m. - S:00p.m.
                                                                                         San tee Lakes
Sewer service: Padre Dam                                                Park & Campground                       448-2482
Water service: Helix Water District   Conversion table                                   Hours: 9:00 a.m. - 5:00 p.m.
Account information is provided to    + 1 cubic foot = ZSO gallons                       Water Reclamation      448-8600
Padre Dam from the Helix Water Dis-                                                      Hours: 7:00a.m. - 3:30 p.m
trict. Please verify that the account + 1 billion unit for gallon                        Management/
information on the Welcome Letter is    register meters = 100 gallons                    Board of Directors        448-3111
correct and call us if it is not.     + 1 billion unit for cubic feet                    Hours: 8:00a.m. - 5:00 p.m.

Riverside Drive area - Lakeside        register meters = 100 cubic feet
Sewer service: Padre Dam                                                                  Bluing information continued on back
Water service: Lakeside Water
District or private well

Fletcher Hills/                                                         Account Number: Each meter has an account num-
Gillespie Field - El Cajon                                              ber. Numbers beginning with 2 have meters that regis-
Water service: Padre Dam                                                ter in gallons, those beginning with 1 or 3 have meters
Sewer service: city of El Cajon                                         that register in cubic feet.
Pumping charges: Padre Dam                                              System Charge: A flat amount based on meter size
(Fletcher Hills only)                  .    · · ·                       that is charged for each active account. This pays for
Eastern services area - Crest,                                          meter reading, maintenance, and billing.
Alpine, Harbison Canyon,
Blossom Valley, Flinn Springs            .  `                           Sewer Charge: Sewer charges are based on service
Water service: Padre Darn or                                            type. See Welcome Letter for type.
private well
Sewer service: county sanitation                                        Water Use/Usage x 100 = : The amount of water
districts or private septic              .                              used during the billing period. One billing unit equals
Pumping charges: Padre Dam                                              either 100 gallons or 100 cubic feet. Refer to your ac-
                                                                        count number for the billing unit type.

Crest customers
Customers in the Crest area. which                                      Pumping/Energy Charge: A charge for electricity
war previously served by the Crest                                      required to pump water to higher elevations, calculated
Public Utilities District (CPUD), have                                  for the actual amount of water used.
an additional charge on their bills.                                    Lileline.Standardl-Standardll: An inclining tiered
The Crest Charge is a combination                                       rate billing structure that encourages conservation. A
of three items-a loan repayment                                         use allowance is set for each tier.
of the CPUD, a system improvement

fund and payment of a prior debt ser-
vice. These were approved by the           Jt'dre Darn Mu-al                       Billing Questions and Information-call Customer S£rvice test.
CPUD voters.                                                                       10887 Wood,~e Avenue, P.O Box 719003. Santee. ~A 92077.9003

                                           ~A'cner Districi t619) 448.3111  TOD 562.2778  Offtce loun: 8:00 a.m.-S:00 pm

PAGE 70 Show Image
Billing procedures
The following is a summary of the billing and collection schedule for the water/sewer hills.
Bills are mailed by the Customer Service Department on the last working day and third working day of the month.

              I         a                                      0

  STEP 7      Bill mailed to customer.                    Customer has 20 calendar days to
                                                          pay the bill.


  STEP 2      Past due notice mailed on 21st day          Customer has five working days to pay






              10% of the bill. There is a minimum and     on the past due notice, Step 4 will occur.
              maximum amount.


  STEP 4      Notification of impending service discon-   Customer has 48 hours to pay bill,
              nection (shut-off) is hand-delivered (all   including all additional charges, before
              reasonable attempts are made) to the        service will be shut off. Pay in person or
              residence. A notification fee is added to   use night drop before 8 AM on date due.
              the bill.                                   If the bill cannot be paid, call Customer
                                                          Service Dept. before service disconnection
                                                          (shut-off) date to arrange payment.


  STEP S      If bill has not been paid in the required   Pay bill, notification fee, reinstatement fee
              48 hours, District personnel shut off water and any additional charges in person
              at the meter. Water is never shut off on    during regular business hours. Additional
              the day before a holiday, or on a Friday,   charges may include:
              Saturday or Sunday. Shut-off date may not
              be any earlier than 35 calendar days from   + Security deposit - the amount is based
              the date the original bill was mailed. A     on the highest billing during the past
              reinstatement fee is added to the bill.      12 months for the account.
                                                          + Overtime charge - if reinstatement of
                                                           service requires District personnel to
                                                           work overtime, an additional charge
                                                           is imposed.


  STEP 6      District dispatches employee to turn on     If water is restored after normal business
              water service.                              hours, District personnel may accept only
                                                          check or money order from customer
                                                          for payment.



       Billing concerns and additional information                                        Board of Directors
Customers with questions about a        lower parking lot ol the Administm      Douglas S. Wilson, President Division 1
paflictilar hill. lee or charge sh~~uld tivc oflice f~'r alter-hours piyment.~. ~rancis G. Daugherty         Division 2
contact the District's Customer Ser-    Bills may he paid in person at l08X7    Andy Menshek                 Division 3
vice Department. Specific procedures    Woodside Avenue. Bills are not con-     ~lma R. Carroll              Division 4
are outlined on the back of the bill.   sidered paid until received by the Dis- Dan McMillan                 Division 5
if a security deposit has been paid, it trict. Please do not mail cash.         Board meetings are open   to the public
will be refunded at the end of a two    Due to meter-reading schedules,         and are held at 3:30 p.m.    the second
year good payment record or at the      billing and payment dates cannot        and fourth Tuesday of     each month at
termination of service if certain con-  be adjusted. Advance payments can       the District's   administrative office.
ditions have been met.                  be arranged for extended absences       Customers are encouraged    and welcome
A night deposit box is located in the   or vacations.                           to attend.

PAGE 71 Show Image
             U)- C~,' ~ ~~~Cffi~~~
      ~ e)~~3 ~o3~~ C ~ -.
        0  ~ V   5      C,, ~ 3 ~
           -  CD~~~~O~
      ~ OCD Vv~ ~CD~OCD=~CD ~
        ~


        (D,~OO  O~~CD~~CDC,,~VCD ~.
      ·~ ~  --CD~ - Cn~ ~ CD C
  L   ~    ~~
        C
        ~    CD    CD   0 C,,
           "`C,, ~  ~- =
               ~~~~VC cn  CD CD
        C,,              C
           _    ~~(D5O~OO"'CD
             no,  CD    C V
           0-





















                             0)

~"` stop

  watcr             ~  C

  wastc





  I--,



  otUffnI~

                             0
  thctap

PAGE 72 Show Image
                                                                                  aNViNI









                                                                    4JG)

                                                                    (U                                   0
                                                                                                 ~      U
                                                             U              `h    ~              -~     u?a)
                                                             S      -
                                                                                        4'              -~
                                                                   0                    :         -~
                                                                 -                -     E         -~

                                                             -~ -                                ~~~

                                                          -                                      ~
                                                          ·                       0)    Ln
                                                                                                        -0.-
                                                                                                        ~-4J
                                                          -  4'             -       -  --,              o'J~'n

                                                                          --                 0
                                                               c~  O+a  -         a,   --     ~ ~a  =a~
                                                                    -~   :~       E     -
                                                                    ~~o'~~~       E     -     :~~-
                                                                                        `U
                                                                                 `n     `L









                                                                                    a)    CL     V
                                                                                    =      0
                                                                                           -     0
                                                                                                 0
                                                                                                 a)

                                                                          0)   ~    -~    =

                                                                                           ·~     V~    a)~~
                                                                                    a)   Cr)    Cr)

                                                                             o      a)

                                                                                     V


                                                                             a)

                                                                                          CL
                                                                  0~                -~     -
                                                                             CL           a)    a)


              Cr) Cr)      Cr)
                  ~     Cr) ~                                                __           Cr)  -


                  _                 _                                                          Cr)~   ~:.~~



(j)      ~0>V               ~~O~~                                                   ocr;

 4J      =~0=~~             2~w  >                                       O'~  EE  a)Cr)   >    Cr)
 ~       -Sc')                 V~~>  ~                                                           0~   ·~~~

         0a) a)~cL)>    a)~ ~ Cr)~ V)~  ·--                                               0       n;
~         =Cr)Cr)~V~~o  --          0   ~                                ~0t'S-~a)         ~   C') 0
                                    0   =                                                      a)~  `uo;'n


                       a)           -   -                                        Cr) = .--
            -                                                                         -  C     C ~

         a)Cr) Vc =         V> C  a)                                         0                 -- a)  `n~Oo
              H         = a) Cr)        a)                                  Cr)
                                                                            Cr) ~ = -










                                                               ~        2 0  C - CL ~          ~ a) -
                                                                                  CL a) 0
                                                                            E o- a) V          a' = ~~ a)
                                                                             o Cr) V     V~    = =
              _                                                              0 =        --    -
                                                                                         C')C >  =
                    -               C                                       -            a)Va)Cr) ~fO~E
             Cr)~c')~a)a)Ca) 0a)~c')~ -- 0                     U~       -~ C         a)=~~=a)           Utj

              a)Ca)  =                  0)                                     0  = 0) a)~~VE~  ~C1~

         C a)        C') 0)  0)a) Cr)>  0                                      C        _      Cr)a) a)


C                 CV  c')# cn       E    ~                                     =       a)>
       Cr)~ E0 CL           C           C                                  C,) ~        U)     -~ ~ -
          ~= c')~Cr) C CL Cr)       0    ~
                 Cr)      H ~u     LL  U)                                      (`I c~    -~        ~

PAGE 73 Show Image
0'  ~II:;~~~~iIs(cAiIisI~tI~~I~AvI;i;;~~: `Vi~CI)"'

































~  ~1re

      ~~I; I-I~~~III  `I~II) ((I~) ~~` `7X

PAGE 74 Show Image
              Padre Dam Municipal Water District
                       Speaker's Bureau
               Available for Group Presentations
                           July 1995


The Padre Dam Municipal Water District has a speaker's bureau and would like the opportunity
to present today's water issues to your group or organization. Our service area includes the
following communities: Santee, the Grossmont College and Pepper Drive areas of El Cajon, the
western portion of Lakeside, and the communities of Flinn Springs, Harbison Canyon, Blossom
Valley, Dehesa, Crest and Alpine. We wish to reach organizations and associations within our
service area to help our community become well-informed about these important issues.

Presentations are designed to meet the needs of your grnup. We offer 20-minute programs on
the following topics:

         ·    Padre Dam - who we are and what we do

         ·    The District's water reclamation facility
              and upgrade project

         ·    State and local water supplies and distribution systems

         ·    The Santee Lakes Regional Park and Campground


Please fill out the speaker's request form and mail it to the District's Public Information office at
the Post Office Box address above. We will call you back to schedule your presentation. Or if
you prefer, call the Public Information Department directly at 448-3111 x246 for more
information.
We look forward to meeting you and your organization in the near future.



                 Speaker's Bureau Request Form

Organization:______________________________________________________________________

Date and Times of regular meetings:_________________________________________________

Meeting location: ___________________________________________________________________

Desired topic: __________________________________________________________________

contact person and telephone number: _____________________________________________

PAGE 75 Show Image
           Cf).
           Cf)




0











                                                                       ¼








_                       `¼)










                              .                                    C
                            0
                                 oo                        -
                                    I.                             a



                                                                   0







                                                           ~~f)

PAGE 76 Show Image
-, ~I~tSIQ ~WM                                   dI~Iunh WDQ ~~D~
                                                                   a~~ Aq pap~AWd s~u~i a?q~L
                                 ·uoj~~~doo~ JnoA Joj noA ~URtLL

  ~1q~nJ~A  s1~  ~AJ~SUO3  A~iunrnwo~  ino~~i~~~0i5~~~i
  PU~ ~~S~M J~~~A~  ssaip~~u  Bui~~uiwjj~  ~!  ~U~n~
  -sai   si,q~   `~s~nb~   uodn   Aiuo   J@~~M   ~U!pI.AWd
  Ag   ,vs~  ~snI  `i~~gM jo  ss~~~  ~  a~I.i  p,noA j~  `Os
                                                   ·A~p AJ3A~ %u()jJR19 ~AP.S ~M
  `J3~'?M ~U!AJ@s Aiau~~noi ~ou Ag   3~j  `I~!~  III.j Put'
  asuji `Ms~M o~ ~oiu £-~ sasn paAJas J~P.M jO ss~~~
  tj~I?~  JaA!}~ oPWoIo~ a~j~ pu~ P!~Uoj'.;t'~ UJ~~)Jou
  UIoJj    `APMp,   saII.tu   Jo   SP~ip'intj    tuoij   saiuo~
  J~~~M ~uI.~u!JP JflO  J~~P·M JO Sa3inos ~i?J~11P.1J MaJ
  M~!M  ~asap  P!J~-!~uas  ~ SJ  P.!uJojIIp~  t1J1q~no~









  This res~autsnI is prnmo~inv w~Ier conservalion h~





















                         `·1·   1·                                      

PAGE 77 Show Image
   The FRUGAL FRIAR says:
     D~n't hose down payed `surfaces
     except to cleanup asafety or
     health hazard.

 Conservation brochures and videos available
 at the administrative office
 10887 Woods'ide Ave., Santee
 or call Customer Service at               -~ -

 258-4600


`Padre Dam water conservation guidelines
remain in effect at all times, regardless of water supplies.











   · The FRUGAL FRIAR says:




Padre Dam water C()nservali()n gui~lclines
remain in effect at all limes. regar~lless ()f w;iier `supplies.



       Padre Dam Municipal Waler Disirid

PAGE 78 Show Image
                CHAPTER 1  -  SECTION 10631  -  D


D.  Provide a schedule of implementation for proposed actions as
indicated by the plan.

The 16 Best Management Practices as included in the Memorandum of
Understanding regarding Urban Water Conservation in California,
includes a three-year implementation of the 16 practices.  See
attached schedule of implementation.

Other conservation programs sponsored by the District and San
Diego County Water Authority sponsored are generally on-going.
Occasionally, a new program will be developed which will have an
implementation of short duration or only one fiscal year. The
costs for District sponsored programs or shared programs are
budgeted for each fiscal year, from July 1 through the following
June 30.

PAGE 79 Show Image
                     RESOLUTION NO. 91-91

           RESOLUTION OF Tf~E BOARD OF DIRECTORS OF
              PADRE DAM MUNICIPAL WATER DISTRICT
            APPROVING AND AUTHORIZING EXECUTION OF
             MEMORANDUM OF UNDERSTANDING REGARDING
            URBAN WATER CONSERVATION IN CALIFORNIA


       WHEREAS, a Memorandum of Understanding regarding urban
water conservation in California has been presented to the
Board, a copy of which is attached hereto as Sxhibit A; and

       WHEREAS, signatories to said Memorandum of Understanding
consist of California urban water suppliers, public advocacy
organizations, and interested groups, as so defined, and

       WHEREAS, it is in the interest of the District to
approve and authorize the execution of said document;

       NOW, THEREFORE, IT IS HEREBY RESOLVED, DETFRMINED AND
ORDERED by the Board of Directors of Padre Dam Municipal Water
District as follows:

       1. That the said Memorandum of Understanding be and it
is approved.

       2. That the General Manager or the Assistant General
Manager be and he is authorized and directed to execute said
document on behalf of the District.

       PASSED AND ADOPTED at a regular meeting of the Board of
Directors of Padre Dam Municipal Water District held on the
10th day of September, 1991, by the following vote, to wit:

 AYES:   Wilson, Daugherty, Berry, Carroll, Johnson
 NOES:   None
ABSENT:  None



                                 Y¼X"Wen½~

ATTEST:



 %%½ere~iW~ary~~

 7~~~\~IPAL wA?~

/~  0~GAN~?f0       ~
                  `p
~~  NOV. 23, 1955  c~
    C~i~ i~~~'~

PAGE 80 Show Image
               PADRE DAM MUNICIPAL WATER DISTRICT
               Best Management Practices Implementation Schedule


- CONSE~VATIO ---   - ~~b-
METHOD~:...½       ..           {:;--.-.-.---.; {.~ ... -- .~Y~A - HR~ -










dislribulion system
audits

BMP7               x
public inlorniation

BMP8               x
school education

BMP 13             x
water waste
prol~ibil loris
(Ordinance)

BMP 14             x
water conservation
coordinator

BMP 2c.                             x
plumbing retrofit kits

(3MP 3                              x
distribtilioi~ 5y5l('I))
audits and sysleni
leak repairs


BMP 1                               x
use of water meters
and billing customers
for water used

BMP 6                               x
create landscape
conservation
ordinance (for tiew
developments or
projects) or encourage
adoption ot ord.

BMP 11                              x
billilig structure to
include conservation
pricing

PAGE 81 Show Image
                                 N. .y:;--;. -  ;~$).:;~A.~.Tw .;.z V     HRE~ -

                                       .-  -1 91~to-
- B.M..i~.;     -.. .  .  ...~~  .Qt~  ½.     .6.3-


BMP 12
create provisions in
landscape                                     x
conservation
ordinance lor
individually-built
SFllon~es andior
renovation~ot existing
landscapes in SFH~s

BMP 13                                        x
water waste
prohibitions
(Ordinance) to include
specific applications)

BMP 16                                        x
ULFT rebates or
oll~er mandates lor
reirolits

8MP 1                                                                  x
water audits  Interior
and exterior - for
customers oth~r tt~an
large irrigators






water audits lor
commericallindustrial
customers

BMP 11                                                                 x
conservation pncing
lor sewer service

BMP 15                                                                 x
financial incentives to
custon~ers (wholesale
and retail) for
conserving
IMPLEMENTATION
NOT YET SPECIFIED
flY TI-tE COIJNCtL

PAGE 82 Show Image
                CHAPTER 1  -  SECTION 10631  -  E


E.  Provide an urban water shortage contingency plan that
includes all of the following elements that are within the
authority of the urban water supplier.

The District prepared a Water Shortage Contingency Plan in
January 1992.  The Plan was adopted by the Board of Directors on
January 14, 1992, subsequent to review, public inspection and
comment, and the holding of a formal public hearing.  Notice of
the public hearing was published within the jurisdiction of the
District giving the time and place of the hearing, pursuant to
Section 6066 of the Government Code. Material from that Plan has
been incorporated into this 1995 Update.

The notice of public hearing and Resolution 92-4 are attached.

PAGE 83 Show Image
               Padre Darn Munici~al Water District

FOR PUBLICATION:
January 2, 1992
January 9, 1992

                    NOTICE OF PUBLIC HEARING

                    OF THE BOARD OF DIRECTORS
             OF PADRE DAM flUNICIPAL WATER DISTRICT
                    TO CONSIDER ADOPTION OF A
                 WATER SHORTAGE CONTINGENCY PLAN
                        January 14, 1992

       In accordance with Section 10642 of the Urban Water
Management Planning Act of the California Water Code, notice is
hereby given that on January 14, 1992 a hearing will be held at
3:30 p.m. by the Board of Directors of Padre Dam Municipal Water
District, to receive public comment on a proposed Water Shortage
Contingency Plan.

       At that time the Board will consider adoption of a
resolution approving the plan.  If approved, the Water Shortage
Contingency Plan will become a supplement to the Urban Water
Management Plan adopted by the District on December 11, 1990.

       Copies of the Plan are available for public review in the
lobby of the District Administration Building, 10887 Woodside
Avenue, Santee, California.

       For further information concerning the Plan or the Public
Hearing, please contact Lesley Robin, Public Information
Representative, at 448-3111.

       Any person desiring to submit written comments should do so
no later than the 5:00 p.m. on January 13, 1992, by delivering such
comments to the Board Secretary at the foregoing address, or mail-
ing to P.O. Box 719003, Santee, California 92072.

       The PUBLIC:HEARING will be held in the Board Room at the
District Administration Building, located at 10887 Woodside Avenue,
Santee, California.  Interested persons may appear at the hearing
to present comments.


Dated: December 24, 1991



 thrynChiche3 ter
Board Secretary


D1-legals;
hearing/contingency/plan

PAGE 84 Show Image
                      RESOLUTION NO. 92-4

            RESOLUTION OF THE BOARD OF DIRECTORS OF
              PADRE DAM MUNICIPAL WATER DISTRICT
           AMENDING ITS URBAN WATER MANAGEMENT PLAN
         BY ADOPTING A WATER SHORTAGE CONTINGENCY PLAN


       WHEREAS, the District adopted an Urban Water Management Plan
on December 23, 1985 by Resolution No. 85-124, which was amended on
December 11, 1990 by Resolution No. 90-91; and

       WHEREAS, the California Legislature enacted Assembly Bill liX
during the 1991 Extraordinary Session, amending the Urban Water
Management Planning Act by revising Water Code Sections 10620-10621,
10631 and 10652, and adding Section 10656; and

       WHEREAS, ABliX mandates every urban water supplier as defined
in the Act to amend its Urban Water Management Plan by developing a
Water Shortage Contingency Plan to be filed with the California
Department of Water Resources by January 31, 1992; and

       WHEREAS, the District has prepared such a plan and made it
available for public inspection, and has held a public hearing
thereon, following publication within the jurisdiction of the Dis-
trict of a notice of the time and place of the hearing, pursuant to
Section 6066 of the Government Code; and

       NOW, THEREFORE, IT IS HEREBY RESOLVED, DETERMINED AND ORDERED
by the Board of Directors of Padre Dam Municipal Water District as
follows:

       1.  That the WATER SHORTAGE CONTINGENCY PLAN of Padre Dam
Municipal Water District, a copy of which is attached hereto as
Exhibit A, be and it is approved and adopted prior to January 31,
1992, as required by the California Legislataure.

       2.  That the Secretary of the District be and she is author-
ized and directed to file with the California Department of Water
Resources a copy of the District's Water Shortage Contingency Plan,
amending its Urban Water Management Plan.

         PASSED AND ADOPTED at a regular meeting of the Board of
Directors of Padre Dam Municipal Water District held on the 14th day
of January, 1992, by the following vote, to wit:

  AYES:  Daugherty, Berry, Carroll, Johnson
  NOES:  None
ABSENT:  Wilson

                                ~~IIIw,   9-,

                                         4~~ ~r%si ent
ATTEST:                        ~+.`~

PAGE 85 Show Image
               CHAPTER 1  -  SECTION 10631  -  El


El.  Past, current, and projected water use and, to the extent
records are available, a breakdown of those uses on the basis of
single-family residential, coininercial, industrial, governmental,
and agricultural use.

As determined in the District's 1989 Water Supply Master Plan,
the water service area for the District is expected to reach a
buildout population of 198,600.  The annual population growth
rate for the next 10 years is 1.8%.  The long-term annual
projected growth rate for the next 55 years (build-out) is 1.57%.
Source:  SANDAG, Population and Housing Estimates and Study
Projections.

See attached chart,  Past, Current and Projected Annual Potable
Water Sales in Acre Fee.

PAGE 86 Show Image
                                                                                                                                                                                                                                                                                                                                                                                 iJIJ~




                     a)
                                                                                                                                                                        ~             d           &
    a,
   U
CL-CU
                                                                                                                                                                                         ~Lno)'Qo)O


 U,
 CU

                                                                          0)      cv)                                                                                                  0)


                                         0)
                                                      -:            ~                                                                                                   0)        w            o             CO
                                                                        v~            E             =                                                                 Corn
                                        ~                  0            -~            E             -~       Co                                           0)             0             -~          E       =~           -
                                        Co                 =           0)             0                      ~                                            Co             =            0)           0

PAGE 87 Show Image
               CHAPTER 1  -  SECTION 10631  -  E2


E2.  An estimate of the minimum water supply available to the end
of 12, 24 and 36 months, assuming the worst case water supply
shortages.

Disaster scenario, total supply interruption

The District purchases 100% of its water from the San Diego
County Water Authority which in turn buys it from the
Metropolitan Water District of Southern California.  The water is
a blend from the Colorado River and northern California sources.

The District has no reservoirs to collect natural runoff and no
artificially constructed reservoirs to hold imported raw water
supplies.  The District operates no wells and has no gr6und water
sources or desalination plants.

A wastewater reclamation plant supplies reclaimed water to a
series of recreational lakes, the Santee IJakes, and irrigates the
surrounding parkland.  By 1997, this facility will be producing 2
MGD.  After the use taken daily to supply the Santee Thakes, 1 MGD
will be available for irrigation purposes within the City of
Santee.  The production of 2 MGD of reclaimed water from this
facility will supply 10% of the District's daily water demand.

In the event that the treated water aqueduct operated by the San
Diego County Water Authority which supplies water to the Padre
Dam Municipal Water District were interrupted, the District would
have to rely on the maximum four day's operational storage in its
tank reservoirs and supplies from an intertie to a neighboring
District.

If supplies provided through the aqueduct operated by the
Metropolitan Water District to the San Diego County Water
Authority were to be interrupted, the scenario for the District
would be the same.

Insufficient regional emergency storage

There is insufficient emergency storage for both the District and
its suppliers.  Several member agencies of the San Diego County
Water Authority own and operate their own emergency reservoirs.
On the whole, these reservoirs have direct connections only to
their particular service areas.

In order to address insufficient emergency storage for the SAn
Diego Area, the Metropolitan Water District of Southern
California currently has plans to increase this storage by
constructing the Eastside Reservoir near Hemet, California.

PAGE 88 Show Image
The San Diego County Water Authority is addressing the lack of
regional emergency water storage in the area and is proposing to
construct facilities and systems which would increase the
available water storage in the area by 90,100 acre feet. The
project is in the final environmental review stage (December
1995) -

The District shares an intertie (Connection 6) with a neighboring
provider, the Helix Water District, which owns a 9,000 acre feet
storage reservoir and filtration plant.  Through arrangements
with the County Water Authority, the District utilizes this
intertie on a daily basis.  For emergencies, this intertie can
supply less than one-half of the District's normal warm season
demand.


Long-term supply shortages, 50% reduction

In the event that the District were to have supplies reduced by
50% for a lengthy duration, compensatory reductions in use would
have to occur.  Reductions would need to closely match the level
of supply cutbacks.  Therefore, a 50% reduction in supply to the
District would need to be matched by a 40% reduction in use,
accounting for 10% supplied by reclaimed water from the
District's reclamation facility.

Average daily purchases of water through two supply connections;

Padre Dam MWD
Summer average
(July,August,Sept 1995 average)
Connection 4 (direct CWA)         14.34 million gallons per day
Connection 6 (via Helix WD)       10.07 million gallons per day
Total                             24.41 million gallons per day

Win~er average
(Jan, Feb, Mar 1995 average)
Connection 4 (direct CWA)           8.03 million gallons per day
Connection 6 (via Helix WD)          .89 million gallons per day
Total                               8.92 million gallons per day


The amount of water obtained from connection #6 via Helix Water
District varies according to season.  Generally, District
purchases of water are 2/3 from connection #4 and 1/3 from
connection #6.

Typically, the District can receive B million gallons per day
from the Helix Water District connection #6.  However, with the
addition of a booster pump utilized in emergencies, 16.8 million
gallons per day are available through that connection.  During an
emergency, the Helix Water District would need to carefully
consider the demands of its own customers before making the water
available to other agencies.

PAGE 89 Show Image
The storage tank reservoirs within the District contain
approximately 4 day's average use.  With a 50% reduction in
customer demand, this reserve could last for 8-10 days.

The attached chart shows the amount of water estimated to be used
at normal demand projections for three years and the "worst case'
supply projections at a 50% supply shortage.


            WHOLESALE MINIMUM WATER SUPPLY AVAILABLE
                AT THE END OF 12, 24, & 36 MONTHS


                            ACRE-FEET

  Purchased in      12 Month        24 Month        36 Month
  Fiscal Year     Supply at 50%   Supply at 50%   Supply at 50%
   1994-1995        Cut Back        Cut Back



Note:     10% of the District's water demands could be met by the
          2 MGD reclamation facility during an emergency.

PAGE 90 Show Image
               CHAPTER 1  -  SECTION 10631  -  E3


E3.  Stages of action to be undertaken by the urban water
supplier in reponse to water supply shortages, including up to a
50% reduction in water supply, and an outline of specific water
supply conditions that are applicable to each stage.

The District continually monitors the water supply and demand of
its customers.  As all water supplies are purchased from the San
Diego County Water Authority, int~rruptions to Authority supplies
or restricted supplies from the Metropolitan Water District can
cause immediate short or long-term shortages to the District.

Current District Rules and Regulations authorize the General
Manager or designee to take any appropriate actions necessary to
achieve the water conservation goals set for the District in
cases of supply shortages or emergencies. See Ordinance 91-5,
"Water Conservation Plan" in the Appendix.

At the time of preparation of this Plan, revisions to the
District's current Rules and Regulations are being compiled to
address certain actions required by the District during
shortages.  In several instances, the need for immediate
restrictions has caused a series of actions by District staff to
immediately curtail unnecessary water use, such as landscape
irrigation. These measures have been imposed in the past at the
discretion of the General Manager.

The revisions to the District's Rules and Regulations will
formalize those policies. It is expected that these revisions
will be considered by the District's Board of Directors in late
1995. See "Staff Recommended Draft - District Rules and
Regulations, Section 5, Water Supply System" in the Appendix.

Depending on the severity and duration, during water supply
shortages, the District may implement certain procedures and
activities listed below:

1)   Impose Emergency Water Use restrictions, as required by San
     Diego County Water Authority or for District need. (See
     Chapter 1, E-4 and explanation below.)

2)   Declare and implement actions for the District's Water
     Supply Management Condition (See Appendix.)

3)   Implement stage of IICP as required by Metropolitan Water
     District of Southern California (See explanation below and
     Ordinance 91-6 in the Appendix.)

4)   Implement District Conservation Rates and Water Use
     Allowances for each rate,  (See Chapter 2-~ and Ordinances
     94-13 and 94-14 in Appendix.)

PAGE 91 Show Image
5)   Obtain water supplies, if available, through inter-ties to
     neighboring agencies.  (See Chapter 2-2.)

6)   Assist in implementing Mutual Aid Agreements with
     neighboring utilities and other disaster preparedness
     agencies.  (See explanation below.)

7)   Establish actions incorporated in Standardized Emergency
     Management Systems (SEMS) as needed.  (See explanation
     below.)

8)   Implement public information campaigns to meet water
     restriction goals, including instructions in the appropriate
     use of greywater, if permitted by local health officials.
     (See Chapter 1-K, Chapter 2-6, and Best Management Practices
     Report included with this Plan).


Further details about these items are:

1)   San Diego County Water Authority, emergency water use
     restrictions

     In the event that the District's wholesale water provider,
     the San Diego County Water Authority, declares that supplies
     to the region are cut back to a 50% level, it may require
     member agencies to enact certain water use restrictions to
     achieve this level of reduction. These restrictions should
     be similar to those set out in the Authority's Ordinance 91-
     6.  Districts may also be subject to various penalties
     levied by the Authority and/or the Metropolitan Water
     District for not achieving these percentage reductions.

     The San Diego County Water Authority's Ordinance No. 91-6,
     adopted June 25, 1991, that in the event of an emergency or
     long-term supply reduction,  Establishes rules, regulations,
     and restrictions so that available water supplies are
     allocated among member agencies for the greatest public
     interest and benefit.   Included in this ordinance is a list
     of water use restrictions to be used by retailers within its
     service area if the retailer does not have in place similar
     use restrictions.  See Ord. 91-6, CWA  Restrictions on Water
     Supplies  in the Appendix.

3)   Metropolitan Water District of Southern California
     Incremental interruption and conservation program'

     The level of conservation required for the region is set by
     the Authority's supplier, the Metropolitan Water District,
     who has established an Incremental Interruption and
     Conservation Program (IICP) which was adopted on December
     11, 1990 as a means of allocating water to its member
     agencies during drought conditions. The Authority is obliged
     to comply with reductions and restrictions enacted by the
     

PAGE 92 Show Image
    Metropolitan Water District and to pass them on to its
    member agencies, which includes the Padre Dam Municipal
    Water District.

    On January 22, 1991, the Padre Dam Municipal Water District
    adopted Resolution 91-8 authorizing implementation of the
    IICP to its retail districts and passing on any water use
    and supply restrictions and financial incentives and
    disincentives to those districts (See Resolution 91-8
    attached.)

6)  Mutual Aid Agreements

    The District has entered into mutual aid agreements with
    several neighboring utilities and other local public health
    and safety agencies to provide voluntary sharing of
    materials, equipment and personnel among the contracting
    parties, based upon need.  The District also participates in
    a mutual aid agreement with the Metropolitan Water District
    Cooperative Systems plan.

7)  Standardized Emergency Management Systems

    The District has re-written all emergency preparedness and
    response documents to comply with the state mandated
    Standardized Emergency Management Systems (SEMS) as required
    by SB 1841.  The new document will be adopted by the
    District's Board of Directors by Resolution in December 1995
    to comply with required adoption date of January 1, 1996.
    The SEMS document simplifies and provides standardized
    emergency response procedures for all districts, police,
    fire and other public health and safety authorities with the
    state.

    There are four basic parameters in the SEMS procedures.  An
    incident manager must be declared who then delegates
    activities in the areas of operations, planning assessment,
    logistic resources and administration.  Since all utilities
    and response authorities will utilize the same structure
    during an emergency, the SEMS approach allows personnel to
    be utilized at other agencies with a mimimun of orientation
    and effort.

    In addition to adopting the SEMS plan, the District
    participates in a Multi-Agency Coordination System and a
    Multi-Agency Radio System (MARS).

PAGE 93 Show Image
                     RESOLUTION NO. 91-8

           RESOLUTION OF THE BOARD OF DIRECTORS OF
             PADRE DAM MUNICIPAL WATER DISTRICT
             PROVIDING FOR THE IMPLEMENTATION OF
               THE METROPOLITAN WATER DISTRICT
                   OF SOUTHERN CALIFORL~IA
       INCREMENTAL INTERRUPTION AND CONSERVATION PLAN


      WHEREAS, four consecutive years of drought conditions
throughout the State of California and the Colorado River Basin
have created an unprecedented threat to the sufficiency of the
imported water supply of the San Diego County Water Authority
and Padre Dam Municipal Water District; and

      WHEREAS, the Metropolitan Water District of Southern
California has evaluated the groundwater and surface storage
reserves of its member agencies, and has found them to have
been substantially depleted by the drought; and

      WHEREAS, the San Diego County Water Authority has de-
termined that the local storage reserves of its member agencies
have also been substantially depleted by the drought; and

      WHEREAS, the Metropolitan Water District of Southern
California has implemented a plan of interruption and conser-
vation of its limited water supply in a manner that will pro-
tect, to the extent possible, adequate supplies for 1991, and
also thereafter if the drought conditions should continue; and

      WHEREAS, the San Diego County Water Authority, as a
member agency of the Metropolitan Water District of Southern
California, is implementing guidelines for the plan; and

      WHEREAS, Padre Dam Municipal Water District, as a member
agency of the San Diego County Water Authority, shall be also
subject to the terms and conditions of the plan;

        NOW, THEREFORE, IT IS HEREBY RESOLVED, DETERMINED AND
ORDERED by the Board of Directors of Padre Dam Municipal Water
District as follows:

      That the General Manager is hereby authorized and di-
rected to implement the Metropolitan Water District of Southern
California's Incremental Interruption and Conservation Plan, in
accordance with guidelines issued by the San Diego County Water
Authority, as set forth in Exhibit A attached, in order to
effectively provide assurance of an adequate water supply for
1991 and subsequent years.

PAGE 94 Show Image
         PASSED AND ADOPTED at a regular meeting of the Board
of Directors of Padre Dam Municipal Water District held on the
22nd day of January, 1991, by the following vote, to wit:

  AYES:  Wilson, Daugherty, Berry, Carroll, Johnson
  NOES:  None
ABSENT:  None




                                          Pres
ATTEST:




         Secre'tary




  ~~%\toI~nAizL~W44:e

         0


:~  nov. fl1 Lg~5 I

PAGE 95 Show Image
               CHAPTER 1  -  SECTION 10631  -  E4


E4.  Mandatory provisions to reduce water use that include
prohibitions against specific wasteful practices, such as gutter
flooding.

The District has adopted Ordinance 91-5  Water Conservation Plan
which contains water use restrictions for its customers.  This
current Ordinance is the third revision to the District's Water
Conservation Plan and is the result of two years' experience with
both voluntary and mandatory water rationing.  Certain water use
restrictions have been modified as a result of customer use
habits and enforcement experience.  The current version contains
financial penalties for violating any of the provisions of the
ordinance.

The plan is divided into two sections Part I and Part II. Part I,
entitled UNORMATh AND WATER SHORTAGE CONDITIONS,  contains water
use restrictions and enforcement measures to be in effect at all
times, including times of water supply shortages.

Part II, entitled  WATER SHORTAGE EMERGENCY CONDITIONS,  contains
additional measures and strengthens the restrictions in Part I.
Stronger enforcement measures are added. The restrictions in Part
II are to be used in times of severe cutbacks from the District's
water supplier, or in times of a temporary disruption of supply,
storage, distribution or other facilities.

The current version of Part I was developed in collaboration with
five other neighboring water districts.  It was felt, after
several months' experience with mandatory rationing, that
customers would be more cooperative if the restrictions were
consistent with those of their neighbors.  In addition, joint
public education between the agencies would be more effective and
during times of drought restrictions, joint publicity would be
cost-effective.

None of the districts involved in this collaborative process had
service area boundaries that coincided exactly with any city
limits. For example, one municipality is served by three water
districts.  Certain neighborhoods had water served by one
provider while on an adjacent street, residents were served by
another. Additionally, these Districts were in the same climatic
zone, with consistent weather patterns and watering reouirements
for landscape.

The collaborative process was especially beneficial in
determining water use restrictions on outdoor landscaping.
Consistent restrictions also facilitated cost-sharing of
newspaper advertising (See Ordinance 91-5 in the Appendix).

PAGE 96 Show Image
               CHAPTER 1  -  SECTION 10631  -  E5


E5.  Consumption limits in the most restrictive stages.  Each
urban water supplier may use any type of consumption limit in its
water shortage contingency plan that would reduce water use and
is appropriate for its area.  Examples of consumption limits that
may be used include, but are not limited to, percentage
reductions in water allotments, per capita allocations, an
increasing block rate schedule for high usage of water with
incentive for conservation, or restrictions on specific uses.

On February 26, 1991, the District established an inclining block
rate structure with use allowances within each block to encourage
decreased water use during times of supply shortages.  Within
this structure is the flexibility to alter use allowances within
each block.  The use allowances are decreased by the same
percentage reduction that is being required of the District as a
whole.  The base is determined by the average use for customer
type.

The District does not use historical comparisons for use
reductions and does not use a per capita allocation for billing
determinations. The block rate structure has been successful in
reducing customer demands to the level required by the District's
supplier. See Ordinances 94-13 and 94-15,  Water Commodity Rates'
and Ordinance 94-15 `Water Use Allowances" in the Appendix.

PAGE 97 Show Image
               CHAPTER 1  -  SECTION 10631  -  EG


EG.  Penalties or charges for excessive use.

The District's inclining block rate structure contains three
prices for water used in different quantities.  The highest rate
is priced to discourage water used in quantities subject that
rate.

The District does not have penalties or charges for excess use.
The billing structure does not use a per capita or household
allocation system.  See Ordinance 94-13 and 94-14  Water
Commodity Rates~ and Ordinance 94-15  Water Use Allowances' in
the Appendix.

PAGE 98 Show Image
               CHAPTER 1  -  SECTION 10631  -  E7



E7.  An analysis of the impacts of the plan on revenues and
expenditures of the urban water supplier, and proposed measures
to overcome those impacts, such as the development of reserves
and rate adjustments.

The District adopted a tong Range Financial Plan in (Ordinance
94-12) on January 19, 1995 which forinalized language for
established general funds, restricted cash funds, and trust
funds.  Included in the restricted cash funds is a rate
stabilization fund.

Conservation education and enforcement efforts to achieve a 50%
decrease in water use over a 12-36 month period, would require
additional expenditures.  The extent of these added costs will
vary, depending on the severity and duration of the supply
reduction and the degree of customer compliance.

In 1991, the District adopted an inclining block rate structure
that can be used to increase the price of water at various use
levels.  This rate structure can be adjusted to be responsive to
certain supply conditions.

Once the District's water reclamation facility 2MGD upgrade
project is fully operational, approximately 10% of the District's
daily water demand can be supplied by reclaimed water from the
facility.

The calculations below indicate the estimated loss of revenue
from the sale of water to customers during a 36-month cutback of
50% in water supplies. At the end of a 36-month cutback, total
losses in revenue to the District are estimated at $4,103,252.

At the time of this writing, there are sufficient funds in the
Rate Stabilization designated fund to maintain operational
expenses over a 36 month period of time.


         Estimate of Decreased Revenue at 50% Reductions


                      Dec. 1996       Dec. 1997     Dec. 1998
                      end of 12       end of 24     end of 36
                       months          months        months

 Loss in Water          $ 946,884    $ 1,248,397   $ 1,907,991
 Revenue

PAGE 99 Show Image
            --PADRE STANDARD PRACTICES          DATE:          PAGE
                 DAN xtJNICIPAL WATER DISTRICT  EFFECTIVE

                           -AND
                     POLICIES ~ANt:rAL          January l~,    I
                                                   1995      ___________

 Section      Section Title:
                                                Ordinance
 19           INTERNAL OPERATING PROCEDURES     No. 94-12       8



19.1      FNND STRUCTURE

19.1.1    Basis of Accountin~
          The District utilizes accounting principles appropriate
          for an enterprise fund to record its activities.  Revenue
          and expenses are recognized on an accrual basis of
          accounting.

19.1.2    The General Fund

          For internal management, the District maintains a general
          fund to account for its five operations:

          1. Wholesale Water

             Wholesale water operation is responsible for
             developing, acquiring, transferring, storing and
             delivering potable water to the District's retail
             operation, Thakeside Water District, Riverview Water
             District, and the County of San Diego.

          2. Retail Water

             Retail water operation is responsible for
             developing, acquiring, transferring, storing and
             delivering potable water to retail customers in ~he
             western (ID A) and eastern (ID 1) service areas.

          3. Waste Water Disposal

             Waste Water Disposal is responsible for collection
             and disposal of sewage with the District sewer
             service areas (ID A and B).

          4. Water Reclaxtiation

             Water reclamation is responsible for treatment and
             distribution of reclaimed water to irrigation
             customers and the Santee takes.

          5. Santee takes Park and Campground

             Santee takes provides recreational services to
             campers, picnickers, and fishermen at the Santee
             lakes Regional Park and Campgrounds

PAGE 100 Show Image
           PADRE DAX MUNICIPAL WATER DISTRICT  EFFECTIVE      PAGE
-~                 STANDARD PRACTICES          DATE:
                          AND
                    POLICIES ~wWAL             January 19,     2
                                                  1995     ____________

 Section      Section Title:                                   of
                                               Ordinance
 19           INTERNAL OPERATING PROCEDURES    No. 94-12       8




         Also, the District accounts for its capital expenditure
         programs within the general fund.

         The District also records and distributes general and
         administrative support costs to operat~ons and capital
         programs within the general fund based on the cost of
         support service provided.

         ~estrioted Cash rIJnds

         The District maintains restricted cash funds for each
         operation to provide cash for the following purposes:

              1. Rate Stabilization

                 Rate Stabilization Fund compensates in the event
                 of an economic or other cyclic downturn, or in
                 case of a natural disaster.  The contribution to
                 the rate stabilization shall be established by
                 the Board of Directors annually.  The fund shall
                 - not exceed 10% of the operation, plus. tn ~rnount
                 calculated to assure continued operations without
                 rate fluctuation through a period of drought.
                 The Goal of the Board of Directors is to
                 establish an annual rate stabilization of 1% of
                 operating expenses.

              2. Replacement

                 Replacement Fund funds replacement of facilities,
                 vehicles and other equipment as they reach the
                 end of their useful lives.  The contribution to
                 the replacement fund shall be established by the
                 Board of Directors annually.  The goal of the
                 Board of Directors is to establish a contribution
                 to the replacement fund in the amount of 50% of
                 the depreciation expense on current assets until
                 a long range replacement plan is developed.  At
                 that time the contribution will be made annually
                 by the Board of Directors and based upon the long
                 range replacement plan.

              3. Betterment

                 Betterment Fund provides a contrIbution from the
                 rate stabilization fund to pay for facilities
                 

PAGE 101 Show Image
         PADRE DAX XtmICIPAL WATER DISTRICT  EFFECTIVE      PAGE
                 STANDARD PRACTICES          DATE:
                         AND
                   POLICIES xANUAL           January 19,     3
                                                1995      ___________

Section    Section Title:                                    of
                                             Ordinance
19         INTERNAL OPERATING PROCEDURES     No. 94-12       8



               required because of inadequate capacity of new
               requirements that benefit existing users.  The
               amount of contribution to the Betterment Fund
               shall be established by the Board of Directors
               annually.

           4.  Capacity Expansion

               Capacity Expansion Funds are revolving funds used
               ~o provide for the construction of facili~ies
               needed to extend services to new users.

19.1.4   Trust Funds

PAGE 102 Show Image
                CHAPTER 1  -  SECT~ON 10631 -  E8


E8.  A draft water shortage contingency resolution or ordinance
to carry out the urban water shortage contingency plan.

The District adopted Ordinance 93-15 on November 23, 1993 which
sets water use allowances within the consumption billing tiers to
encourage conservation during diminished water supplies.

The District adopted Ordinance 91-5 "Water Conservation Plan' on
April 16, 1991 which allows for implementation of measures to
appropriately allocate diminished water supplies.

The District adopted the Water Shortage Contingency Plan,
Supplement to the 1990 Urban Water Management Plan, on January
14, 1992, subsequent to review, public inspection and comment,
and the holding of a formal public hearing.  Notice of the public
hearing was published within the jurisdiction of the District
giving the time and place of the hearing, pursuant to Section
6066 of the Government Code.

The notice of public hearing and Resolution 92-4 are attached.

PAGE 103 Show Image
                Padre Dam MuniciDal Water District

FOR PUBLICATION:
January 2, 1992
January 9, 1992

                     NOTICE OF PUBLIC HEARING

                     OF THE BOARD OF DIRECTORS
               OF PADRE DAM MUNICIPAL WATER DISTRICT
                     TO CONSIDER ADOPTION OF A
                  WATER SHORTAGE CONTINGENCY PLAN
                         January 14, 1992

       In accordance with Section 10642 of the Urban Water
Management Planning Act of the California Water Code, notice is
hereby given that on January 14, 1992 a hearing will be held at
3:30 p.m. by the Board of Directors of Padre Darn Municipal Water
District, to receive public comment on a proposed Water Shortage
Contingency Plan.

       At that time the Board will consider adoption of a
resolution approving the plan.  If approved, the Water Shortage
Contingency Plan will become a supplement to the Urban Water
Management Plan adopted by the District on December 11, 1990.

       Copies of the Plan are available for public review in the
lobby of the District Administration Building, 10887 Woodside
Avenue, Santee, California.

       For further information concerning the Plan or the Public
Hearing, please contact Lesley Robin, Public Information
Representative, at 448-3111.

       Any person desiring to submit written comments should do so
no later than the 5:00 p.m. on January 13, 1992, by delivering such
comments to the Board Secretary at the foregoing address, or mail-
ing to P.O. Box 719003, Santee, California 92072.

       The PUBLIC:HEARING will be held in the Board Room at the
District Administration Building, located at 10887 Woodaide Avenue,
Santee, California.  Interested persons may appear at the hearing
to present comments.


Dated: December 24, 1991



KathrynChjc~~5 ter
Board Secretary


Dl-legals;
hearingl contingency/plan

PAGE 104 Show Image
                      RESOLUTION NO. 92-4


            RESOLUTION OF THE BOARD OF DIRECTORS OF
              PADRE DAM MUNICIPAL WATER DISTRICT
           AMENDING ITS URBAN WATER MANAGEMENT PLAN
         B? ADOPTING A WATER SHORTAGE CONTINGENCY PLAN


       WHEREAS, the District adopted an Urban Water Management Plan
on December 23, 1985 by Resolution No. 85-124, which was amended on
December 11, 1990 by Resolution No. 90-91; and

       WHEREAS, the California Legislature enacted Assembly Bill lix
during the 1991 Extraordinary Session, amending the Urban Water
Management Planning Act by revising Water Code Sections 10620-10621,
10631 and 10652, and adding Section 10656; and

       WHEREAS, ABliX mandates every urban water supplier as defined
in the Act to amend its Urban Water Management Plan by developing a
Water Shortage Contingency Plan to be filed with the California
Department of Water Resources by January 31, 1992; and

       WHEREAS, the District has prepared such a plan and made it
available for public inspection, and has held a public hearing
thereon, following publication within the jurisdiction of the Dis-
trict of a notice of the time and place of the hearing, pursuant to
Section 6066 of the Government Code; and

       NOW, THEREFORE, IT IS HEREBY RESOLVED, DETERMINED AND ORDERED
by the Board of Directors of Padre Dam Municipal Water District as
follows:

       1.  That the WATER SHORTAGE CONTINGENCY PLAN of Padre Dam
Municipal Water District, a copy of which is attached hereto as
Exhibit A, be and it is approved and adopted prior to January 31,
1992, as required by the California Legislataure.

       2.  That the Secretary of the District be and she is author-
ized and directed to file with the California Department of Water
Resources a copy of the District's Water Shortage Contingency Plan,
amending its Urban Water Management Plan.

         PASSED AND ADOPTED at a regular meeting of the Board of
Directors of Padre Dam Municipal Water District held on the 14th day
of January, 1992, by the following vote, to wit:

 AYES:   Daugherty, Berry, Carroll, Johnson
 NOES:   None
ABSENT:  Wilson
                                    MA              y ~~
                                  ltIIIW,~

                                              resient
ATTEST:


   `Breta
                 ry

PAGE 105 Show Image
               CHAPTER 1  -  SECTION 10631  -  E9


E9.  A mechanisin for determining actual reductions in water use
pursuant to the urban water shortage contingency plan.

The District receives all of its potable water through two
metered connections.  During times of water shortages, these
meters are read daily.  The District's distribution system allows
for reading meters at all turn-outs in the retail system.  Three
wholesale terminal reservoirs are used for distribution to
portions of the District's retail service area and to the
Lakeside Water District and Riverview Water District.

The District utilizes a telemetry system to monitor all water
flows and levels in the District's 26 storage reservoirs.  During
emergency periods with water cutback goals of 50% reduction,
water flows into the District were measured daily and determined
that use was down to 50%, and exceeded that on some days, during
the emergency.

PAGE 106 Show Image
                CHAPTER 1  -  SECTION 10631  -  F


F.  Describe the frequency and magnitude of supply deficiencies,
based on available historic data and future projected conditions
compar~ng water supply and demand, including a description of
deficiencies in time of drought and emergency and the ability to
meet deficiencies.

The District imports 100% of its water from the San Diego County
Water Authority who purchases this water from the Metropolitan
Water District of Southern California.  In April 1989, the
District declared a Stage 2 Water Alert at the request of the
Authority.  This marked the first time that the District had
required mandatory conservation from its customers in the history
of the District.  A chronology of drought/conservation response
is attached.

The District's water reclamation facility 2 MGD upgrade will be
able to produce 10% of the District's normal daily water demand.
During an emergency, this would help to offset the need for
imported water.

Included below is a description of the Metropolitan Water
District's Incremental Interruption and Conservation Plan (IICP)
and its relations to water supplies for the San Diego County
Water Authority.  The material is taken from the Authority's
Draft Urban Water Management Plan 1995 Update with permission.

SAN DIEGO COUNTY WATER AUTHORITY, DRAFT URBAN WATER MANAGEMENT
PLAN 1995 UPDATE, SECTION 7, DROUGHT MANAGEMENT

In the recent past, the Authority has largely shared the water
shortages of its sole supplier, the Metropolitan Water District
(MWD) .  Because an average of 90 percent of the water used in the
San Diego region is imported from MWD, shortages that are imposed
by the MWD tend to be translated to equivalent shortages by the
Authority.

Drought shortages during 1991-92 were ameliorated, however, by
the Authority's ability to purchase transfer supplies from a
newly established state water bank, and by using water stored in
local surface reservoirs.  Each of these measures lessened the
conservation requirement of Authority member agencies by about
five percent.  Whereas MWD required a reduction of 31 percent of
base-year (1989-90) deliveries, the Authority requested its
member agencies to reduce deliveries by 20 percent during that
year.  Transfers are expected to play an even larger role in
lessening future water shortages.

Recent Drou~ht Mana~ement Programs  The six-year drought that
ended in 1992 resulted in a number of regional programs designed
to fairly and efficiently deliver water during times of shortage.
Major drought management plans began in 1988, when MWD prepared a

PAGE 107 Show Image
Drought Action Plan to reduce regional water demands.  The Plan
included the optimization of supplies from the State Water
Project and the Colorado River Aqueduct, and a number of demand
management techniques, including voluntary 10 percent
conservation.  In 1989, an Authority committee developed a model
water supply emergency ordinance that specified appropriate
responses to various levels of supply.  The ordinance was also
used for drafting individual member agency ordinances.

MWD adopted a revised Drought Action Plan in 1990 that
intensified both supply and demand management.  While maintaining
its 10 percent voluntary conservation goal, MWD instituted a
conservation incentive program that paid $100 per acre-foot to
any member agency that reduced demand to less than 95 percent of
what was used during the same period in 1989.  Also beginning in
1990, Authority water deliveries from MWD began to be reduced
under an MWD program called the Incremental Interruption and
Conservation Plan (IICP).

The IICP had several stages of delivery reductions, which were
determined largely by the availability of imported supplies from
the State Water Project and local supplies from MWD's member
agencies.  The program had six stages of delivery reduction
targets, ranging from Stage 1, voluntary conservation of 10
percent, to State 6, which reduced non-f irm deliveries by 30
percent.  The percentage reductions used in each stage were based
on deliveries made in 1989-90, adjusted for growth, loss of local
supplies, conservation, and reclamation.  The IICP featured
financial penalties, or disincentives, for agencies that failed
to reduce deliveries to the appropriate level.  For a brief time,
MWD also offered financial incentives to those agencies that
conserved in excess of the stage target.  A chronology of the
IICP and delivery reduction targets is given in Table 7-1.

MWD and 11 other urban and agricultural water districts
participated in a State Drought Bmergency Water Bank, beginning
in 1991.  The water for the bank was obtained by following or
idling farmland in northern California, using groundwater instead
of surface water, and transferring surplus surface waters from
local reservoirs to the bank.  During the 1991-92 fiscal year,
the Authority purchased more than 21,000 acre-feet from this
bank.  This water was critical to alleviating the severity of the
local drought shortage.

Authority requests for conservation from its member agencies
essentially mirrored each IICP stage.  In December 1990 MWD
initiated IICP Stage 1 and the Authority requested its member
agencies to reduce overall water consumption by 10 percent; in
February 1991 MWD went to Stage 3, and the Authority requested 15
percent conservation; in March 1991 MWD went to Stage 5 and the
Authority requested 31 percent conservation.  Later the Authority
purchased state water bank supplies and used local water to
reduce its conservation target to 20 percent.  This lasted until
heavy rainfall restored supplies for the entire state in March

PAGE 108 Show Image
1992.

To achieve the conservation targets through this period of
drought, the Authority and its member agencies launched
aggressive short-and long-term water conservation campaigns.

In March 1991, the Authority enacted Ordinance 91-1, "Declaring
the Existence of a Water Shortage Emergency Condition and
Establishing Procedures to Preserve and Allocate Available Water
Supplies."  This ordinance provided direction for securing and
managing water supplies during times of drought, making delivery
allocations to member agencies, conservation programs to achieve
water savings, and financial surcharges for exceeding
allocations -

Current MWD Drou~ht Management  In response to the dry winter of
1994-95, MWD established the 1995 Drought Management Plan.  This
plan, which was designed as a set of operating procedures for
calendar year 1995, sought to minimize impacts to the retail
customer.  The principles of this plan, which are also supported
by the Authority, are given by MWD as follows:

     Avoid mandatory stages of IICP to the extent practicable.
     Use water management programs in a coordinated and efficient
     manner.
·    Operate MWD's system to capture and store excess water in
     groundwater and surface storage.
·    Encourage regional storage during periods of excess supply
     and encourage use of this storage during periods of drought.
·    Use equitable means to conserve and use alternative
     supplies.
     Adopt measures that will balance costs and inconvenience to
     customers.
·    Avoid financial hardship to MWD and its member agencies.
     Use cost-effective transfer programs.
·    Use public information to encourage efficient water use, and
     to educate the public on water supply and reliability
     issues.
·    Recognize the need to minimize the impacts of water shortage
     on the region's economy.
·    Reward conservation efforts through water allocation
     methodology and penalize inefficient water practices.

MWD modified its IICP program for 1995, and planned to use
implementation of this program only as a final resort during a
water shortage.  Notable changes to the program included the use
of a three-year average base period (currently 1989-92), revised
conservation stages, and a target marketing system for marketing
unused allocations between MWD member agencies.  Current IICP
stages, percentage reductions, and disincentives for use over
target levels are given in Table 7-2.  The overall reduction is
for all MWD member agencies as a whole, not for the Authority.

Current Authority Drought Management  Since 1991, the Authority's

PAGE 109 Show Image
Ordinance 91-1 has been through a number of revisions and
amendments.  The latest version is Ordinance 94-3, "Ordinance of
the San Diego County Water Authority Establishing Contingency
Plans, Rules, Regulations, and Restrictions, so That Available
Water Supplies are Allocated Among Member Agencies for the
Greatest Public Interest and Benefit."  A copy of this ordinance,
which was adopted by the Authority board in December 1994, is
included in this (the Authority's) Plan as Appendix B.  A table
of water conservation measures that are recommended by this
ordinance to achieve water savings is also included in Appendix B
(Authority's Plan).  This table provides a number of conservation
scenarios, including short-term water system failures, in which
no water would be delivered by the Authority.  This situation
could exist if the region were subjected to an earthquake that
severed Authority or MWD pipelines.

Ordinance 94-3 uses the following principles to secure and manage
water supplies during a drought:

     Minimize shortages by using Authority-owned storage and
     securing additional supplies.
·    Increase deliveries from MWD through target marketing
     provisions of the IICP.
     Negotiate with member agencies for the use of locally stored
     water.
     Allocate available MWD supplies using IICP methodology and
     reduction percentages for firm and agricultural supplies.
     Recommended conservation programs and techniques to member
     agencies.
-    Monitor member agencies deliveries and use.
·    Share MwD disincentive surcharges for using excess water.

The Authority is somewhat limited in the range of supply options
that are available to cope with drought shortages.  Currently,
the Authority neither owns nor operates any surface reservoir or
groundwater facilities, reclamation plants, or desalination
plants.  To supplement normal deliveries from MWD, the Authority
may use water it stores locally (up to 40,000 acre-feet),
purchase supplies from the state water bank, increase its MWD
allocation through MWD's target marketing system, or purchase
water transfers independently of MWD.  The Authority is also
reviewing opportunities to store water in the groundwater basins
of other MWD member agencies, a supply that would be used only in
times of drought.

Revenue Im~acts of Drought  The Authority receives 53 percent of
its revenue from water sales.  If these revenues are less than
required to meet the Authority's financial obligations, a rate
stabilization fund is utilized.  If these monies are not
sufficient, revenue enhancement options would be reviewed and
appropriate responses implemented.

In the event of a water emergency, an ordinance similar to
Ordinance 94-3 would be activated to respond to the level of

PAGE 110 Show Image
shortage.  At that time drought response stage actions would go
into effect, and the Authority would be operating with reduced
water sales.  The amount of decreased revenue would depend upon
the response stage under which the Authority would operate.


             Table 7-1 zICP Z~lementation, 1990-1992

Date of Im~lementation  Stage  Percent of Firm/Nonfirm Reduction

December 1  1990        1                        10 (Voluntary)
February 1 1991         3                            10/30
March 1    1991         5                            20/50
March      1992         3                            10/30
April 1    1992         1                   10 (Voluntary)
November 8 1994      None                              N/A





                 Table 7-2 Features of 1995 izCp

     Reduction in                           Overall
     Agricultural   Reductions of Firm      Reduction Disincentive
Stage Deliveries      Deliveries (%)       (%)            (S/AF)
  1       30               5               6              $134
  2       30              10              11              $168
  3       40              15              16              $302
  4       50              20              22              $419
  5       75              25              28              $553
  6       90              30              33              $670

PAGE 111 Show Image
               CHRONOLOGY OF CONSERVATION CUTBACKS


4/24/89   District declares Stage 2 Water Alert per CWA request,
          effective 5/1/89.  MANDATORY 10%  Restrictions already
          in place on the books, existing rate structure not
          changed.

10/90     Stage 2 revised to allow for extended hours due to
          Daylight Savings Time.

1/22/91   District adopts MWD's IICP and agrees to require
          cutbacks of customers to the level requested by MWD.
          District to be penalized if water use is ABOVE 1989
          levels. District reports monthly water use statistics
          t? CWA/MWD.

2/91      MWD pro~oses 50% mandatory cutbacks

3/91      "March Miracle" rainfall changes MWD's IICP goal to 30%
          MANDATORY

4/91      IICP goal changes to 20% MANDATORY eff. 5/91
          District adopts 4-tiered rate structure and 2 sets of
          rates "Normal" and "Conservation',

          District revises Stage 1,2,3,4 water use restrictions
          to "Restrictions (~) always in effect'1 and `1Emergency
          restrictions" on 4/16/91 after collaboration with other
          east/south county water agencies.

4/1/92    "End of Drought'1 declared after "Fabulous February"
          rainfall. MWD changes conservation goal to 10%
          VOLUNTARY.  District rates revert back to "normal" vs
          II conservation . 1~

11/23/93  District changes 4-tiered rate structure to 3 tiers
          "Lifeline, Standard I and Standard II" effective 1/94.

PAGE 112 Show Image
                CHAPTER 1  -  SECTION 10631  -  G


G.  To the extent feasible, describe the method which will be
used to evaluate the effectiveness of each conservation measure
implemented under the plan.

The District uses several methods of evaluating the effectiveness
of conservation measures.  Programs which are implemented by
consultants whose services are shared by the District and it's
wholesaler, the San Diego County Water Authority, are primarily
measured by utilization.  Fixture replacement and retrofit
programs allow for fixed amounts of water savings to be
calculated per retrofit.

Other conservation programs such as landscape water audits are
more difficult to quantify water savings.  Factors such as
weather patterns and changes in ownership can affect water use
and conflict with yearly comparisons of water saved.

Utilization of programs, requests for educational materials,
responses to items in District printed materials, questions at
speaking engagements and community events provide informal
tracking of interest and utilization of conservation programs.

See ?WCalifornia Urban Water Conservation Council Best Management
Practices Retail Water Agency Annual Report" in the Appendix.

PAGE 113 Show Image
                    CHAPTER 1  -  10631  -  H


H.  Describe the steps which would be necessary to linpiement any
proposed actions in the plan.

Each fiscal year, District staff develops a Public Relations
Annual Plan which is adopted by the Board of Directors.  The Plan
includes a description of various public information, customer
education and community relations programs planned for the
District for the following fiscal year.  A section on
Conservation Programs is developed and included in detail.

A Conservation budget is prepared by staff for each fiscal year
and included with the operating budget.  As the District is a
signatory to the Memorandum of Understanding Regarding Urban
Water Conservation in California, the District is obliged to
implement, where feasible, 16 Best Management Practices.  These
practices are designed to achieve permanent water savings, either
through plumbing retrofits, behavioral change in water use
practices or other measures.  Several of the 16 Best Management
Practices are for internal agency use to monitor water use,
implement rate structures, etc.

A member of the District staff is assigned responsibility to
design and implement the District's conservation programs.

PAGE 114 Show Image
             CHAPTER 1  -  SECTION 10631  -  1, 1-4


I.  Describe findings, actions, and planning relating to all of
the following:

1.  The use 0£ internal and external water audits for single-
family residential, multifamily residential, institutional,
commercial, industrial, and governmental customers, and the use
of incentive programs to encourage customer audits and program
participation.

2.  The use of distribution system water audits.

3.  Leak detection and repair.

4.  The use of large landscape water audits.


The above listed items are included in the W?California Urban
Water Conservation Council Best Management Practices Retail Water
Agency Annual Report.

District customers have continually been faced with increasing
water rates over the past several years.  Participation has been
excellent in programs that offer incentives to replace high water
use plumbing fixtures, ULFT rebate and voucher programs, free
showerhead replacements, etc.

Due to the demographics of the service area, it is more difficult
to achieve complete utilization of home water audits.  The
majority of the lot sizes in the service area tend to be small-
average, making for less opportunity for water savings outdoors.
Other portions of the service area which do have large
landscapes, may not have someone at home during the day to take
advantage of the audit opportunities.

The District does not offer financial incentives on the bills for
decreased water use.

PAGE 115 Show Image
                CHAPTER 1  -  SECTION 10631  -  j


J.  Describe actions and planning to eliminate the use of once-
through cooling systems, non-recirculating water systems, and
non-recycling decorative water fountains, and to encourage the
recirculation of water if proper public health and safety
standards are maintained.

The District's Engineering department reviews all applications
for new water service in the District.  All applicants for new
service are carefully reviewed to determine the prospective water
uses at the property.  The District does not have any ordinances
against non-recirculating water systems.

Due to the very light industrial activities within the District's
service area, there are no large industries that require cooling
towers.  Since all of the District's water supply is imported,
car washes and similar operations in the area would find it
economically prohibitive if the water was not recycled in the
operations.

There are several light industries that use substantial amounts
of water for cooling. The District's industrial waste ordinance
permits frequent inspections of the facility.  This affords the
opportunity for District employees to review water use as well as
wastewater discharge complianc~.  At these opportunities, any
water-conserving procedures can be recommended.

All outdoor decorative fountains in the District's service area
have been recently constructed and, as with car washes, would
find it economically prohibitive to not recirculate water in the
fixture.

PAGE 116 Show Image
                CHAPTER 1  -  SECTION 10631  -  K


K.  Describe actions and plans to enforce conservation measures.

The District uses a variety of methods to educate customers on
the current conservation measures.  Some of these are articles
printed in the District's customer newsletter, notices printed on
bills, and display advertisements in the local newspaper.  The
District has a water conservation mascot, the Frugal Friar, which
is used in publications to provide reminders of water
conservation measures and wise water use methods.

Enforcement of water conservation measures is included in the
District's Water Conservation Plan (Ordinance 91-5). During
recent mandatory water use restrictions, customers were self-
policing and reporting visible violations of the water use
restrictions.  The District was not able to provide employees to
be solely on patrol looking for violations, but when reported
violations were called in to the District office, crews were
dispatched via mobile radio by the customer service department to
the site in ouestion.

If an employee noted the violation, procedures were begun to
notify the customer by mail.  A second offense noted by an
employee generates a fine.  See Ordinance 91-5 "Water
Conservation Plan" in the Appendix.

PAGE 117 Show Image
                CHAPTER 1  -  SECTION 10631  -  L


L.  To the extent feasible, describe the amount of water saved
through water conservation measured employed by user groups.

As part of a 1993 update to a District Residential Classification
Study comparing water use and lot size, an average bimonthly
water consumption per household was determined over a several
year period.  The lowest consumption for each group in the study
occurred in 1991, when the District experienced the highest level
of mandatory rationing required by its wholesaler.  A portion of
this 1993 study is attached.

See `California Urban Water Conservation Council Best Management
Practices Retail Water Agency Annual Report."

PAGE 118 Show Image
                CHAPTER 1  -  SECTION 10631  -  N


M.  Describe actions and planning to ensure the involvement of
community members within the service area with regard to water
management planning -

The District purchases 100% of its potable water from the San
Diego County Water Authority, which has the responsibility for
distribution of water to its member agencies.  Over 90% of these
deliveries are purchased from the Metropolitan Water District of
Southern California.  Regional water management planning for
additional supplies and storage are components of the long range
regional planning of these two wholesale agency.

Two key projects recently of these two agencies have involved
extensive community involvement - the Eastside Reservoir of the
Metropolitan Water District and the Emergency Storage Project of
the San Diego County Water Authority.  Both of these projects are
designed to provide additional water storage for the area in case
of emergencies or long-term restricted supplies to the area.

The District has a variety of ways that the community
participates in water management planning, particularly in the
area of developing additional recycled water.

Community meetings have been held to provide information and hear
comments on District planned increases in the production of
reclaimed water. Environmental documents have been widely
distributed for public comment.  Public hearings have been held
to receive formal public comment.  Participation in community
events, a speaker's bureau and open house informational meetings
have provided opportunities for informal public comment.

Additional storage facilities (tanks) have been constructed by
the District in the service area in recent years.  The three
constructed most recently involved an extensive community
relations program, allowing the public an opportunity to receive
detailed information on the need for these projects.  Each
written communication provided a District staff name and phone
number for questions and comments.

The adoption of a Water Master Plan, Wastewater Master Plan and
Water Reclamation Master Plan in recent years provided
opportunities for community groups and interested parties to
provide comment.

PAGE 119 Show Image
C~ER 2

PAGE 120 Show Image

PAGE 121 Show Image
            CHAPTER 2  -  SECTION 10632  -  (a), (b)


(a)  In addition to the eleinents required pursuant to Section
10631, a plan projecting a future use which indicates a need for
expanded or additional water supplies shall be adopted in
accordance with this chapter and shall include an evaluation of
the following alternatives. (Refer to the following sub-sections
1 through 7.)

(b)  The preparation of the plan shall be coordinated with local
water, waste water, and planning agencies.

The Padre Dam Municipal Water District is both a wholesaler and
retailer of potable water.  In addition, the District produces
and distributes reclaimed water.  Approximately 80% of the
wastewater collected in the District's collection system is
discharged into the San Diego Metropolitan Sewerage System where
it is processed at a regional wastewater treatment facility with
an ocean outfall.

tJocated completely within the District's service area is the
incorporated city of Santee and portions of another city, El
Cajon.  Other unincorporated coinmunities within the District's
service area are subject to the governance of the County of San
Diego.

The District works closely with all of these communities
including several fire protection districts, sanitation
districts, and planning agencies to developing and implementing
areas of this Plan.  The development of additional recycled water
sources is coordinated with the San Diego County Water Authority.

PAGE 122 Show Image
            CHAPTER 2  -  SECTION 10632  -  1, lA, lB


1.  Recycled water.  The plan's evaluation of this alternative
shall provide information on recycled water and its potential for
use as a water source in the service area of the urban water
supplier and shall include all of the following information.

lA.  (Recycled water) A description of the wastewater collection
and treatment systems in the supplier's service area, including a
quantification of the amount of wastewater collected and treated
and the methods of wastewater disposal.

13.  (Recycled water) A description of the recycled water
currently being used in the supplier's service area, including,
but not limited to, the type, place and quantity of use.

In 1990, the District commissioned engineering consultants, Dudek
and Associates to develop a Water Reclamation Master Plan.  The
Plan was adopted by the District's Board of Directors on January
22, 1991, Resolution 91-7.  See attached.

Included in this subsection is material taken from the Water
Reclamation Master Plan which provides a detailed description of
the wastewater collection and treatment systems in the service
area, a quantification of the amount of wastewater collected and
treated, and the methods of wastewater disposal.  See attached
Chapters 1, 2, 3 from the "Water Reclamation Master Plan.

Also included as a description of the recycled water currently
being used in the District's service area are two fact sheets and
several pages from the Padre Dam Water Reclamation Project Final
Subsequent Environmental Impact Report, prepared in February 1995
by Brian F. Mooney Associates and adopted by the District's Board
of Directors on February 22, 1995.  See attached `Padre Dam Water
Reclamation Project Fact Sheet,  District Fact Sheet, `I and
"Reclamation Project Final Subsequent EIR."

At the completion of upgraded facilities at the District's Santee
Water Reclamation Plant, the production of reclaimed water will
increase to 2 MGD.  This will supply approximately 10% of the
daily water demands in the District.

PAGE 123 Show Image
                      RESOLUTION NO. 91-7

            RESOLUTION OF THE BOARD OF DIRECTORS OF
              PADRE DAM MUNICIPAL WATER DISTRICT
            ADOPTING WATER RECLAMATION MASTER PLAN


       WHEREAS, On February 13, 1990, by Resolution No. 90-13
the Board of Directors of Padre Dam Municipal Water District
approved an agreement with Dudek & Associates (Luke-Dudek Civil
Engineers, Inc.) for development of a water reclamation master
plan; and;

       WHEREAS, on December 26, 1990, the Board accepted the
Water Reclamation Master Plan for review; and the Board having
found said plans to be exempt from California Environmental
Quality Act requirement~, in accordance with Section 15262,
Feasibility and Planning Studies, a Notice of Exemption was
filed with the San Diego County Clerk; and

       WHEREAS, an informal public meeting on the proposed
master plan was held on January 10, 1991, and revisions based
upon public comments were subsequently incorporated into the
draft documents; and

       WHEREAS, a public hearing was fixed for consideration
and adoption of the Proposed master plan, and notice thereof
was given in the manner provided by law; and

       WHEREAS, a hearing was held on January 22, 1991, at
which time the public and other persons were given opportunity
to appear before the Board to present their views prior to the
Board's action on the staff ~ec0mmendation; and

       WHEREAS, the Board has heard all persons desiring to be
heard, and has considered the proposed Water Reclamation Master
Plan, the recommendations of staff members, and all comments
received during the public review process;

       NOW, THEREFORE, IT IS HEREBY RESOLVED, DETERMINED AND
ORDERED by the Board of Directors of Padre Dam Municipal Water
District as follows:

       1. That the Water Reclamation Master Plan be and it is
adopted as a guideline for future planning of District water
reclamation facilities.

       2. That no facilities or projects described therein
shall be designed or constructed without approval of the Board,
after compliance with the California Environmental Quality Act.

PAGE 124 Show Image
         PASSED AND ADOPTED at a regular meeting of the Board
of Directors of Padre Dam Municipal Water District held On the
22nd day of January, 1991, by the following vote, to wit:

  AYES:  Daugherty, Berry, Carroll, Johnson
  NOES:  None
ABSENT:  None
Director Wilson abstained from the vote.




                                         Pres 1ea~t
ATTEST:




         ~ecre tary



  ~~~~tIPAL ~~~

~   0~GANt40


o~  ~~y 23. 1955  ~
    C~i~INo1t$~~ I

PAGE 125 Show Image
                                                       ~`~SL~i ~iafl



                              CHAPTER 1

                               SUMMARY




1.1  INTRODUCTION

The preparation of this study was authorized by the Padre Dam Municipal Water District
(PDMWD) in the form of a contract titled "AGREEMENT FOR PROFESSIONAL
ENGINEERING SERVICES BETWEEN PADRE DAM MUNICIPAL WATER DISTRICT
AND LUKE-DUDEK CIVIL ENGINEERS, INC.1 and dated March28, 1990.

The purpose of the Water Reclamation Master Plan (Master Plan) is to define,
encourage, and develop the use of reclaimed water within the PDMWD boundaries. The
Master Plan provides guidance for the planning, scheduling, budgeting, and
construction of a water reclamation system in the PDMWD.

1.2  DESCRIPTION OF STUDY AREA

The study area is defined by the Padre Dam Municipal Water District (PDMWD) water
service boundary and is shown on Figure 1-1. The 85 square miles of the PDMWD are
comprised of the City of Santee, a portion of the City of El Cajon, and the unincorporated
communities of Lakeside, Flinn Spring, Harbison Canyon, Blossom Valley, Alpine,
Dehesa, and part of the Crest area.

1.2.1Land Use

Residential uses in Santee are primarily composed of single family detached units with
some multi-family developments. Commercial development in Santee occupies 181
acres with the majority devoted to retail uses.

Only a small portion of the City of El Cajon is included in the study area, which includes
primarily the Gillespie Field area. The land use designations include both industrial park
and general industrial uses.

The Lakeside Community Plan reports that most of the Current Urban Development Area
in Lakeside is planned for residential use. Agricultural uses have given way to residential
development, but a considerable amount of small scale farming still exists. Crest and
Harbison Canyon are both communities which retain fairly high residential densities
surrounded by areas of lower density estate development and large areas of
undeveloped land.






                                 1-1

PAGE 126 Show Image
                             -,-             6~£L~:kr:one        76


                                  Like Powey                  RAMONA
                                  Reservoir      6?

                              16          POWA?







                           Mirernir
                           Reservoir
                                                       -  ~~Sen Vicente
                                                             Reservoir




                                                                               )~~~~E~eisC~:~oviotsrn


                                      Sante.
                                      Likes                    -,





















                                               Sweetwater



























STUDY AREAlPADRE DAM MUNICIPAL WATER DISTRICT

                                                                              GRAPHIC SCALE

                                                                              ·1~
                                                                              0    2.5     5 MI.



                                        FIGURE 1-1

                                       -VICINITY MAP


                                                                   DUDEK & ASSOCIATES, INC.

PAGE 127 Show Image
Existing development in Alpine has a rural character typified by light agricultural activities
practiced in conjunction with residential uses.

1.2.2Water Supply

The PDMWD began in 1977 as the result of the merger of the Santee County Water
District and the Rio San Diego Municipal Water District. As a water agency, PDMWD
sells water on a wholesale and retail basis. The PDMWD serves approximately 17,780
water customers. The current average water demand for PDMWD is about 16 MGD with
a peak day demand of 25 million gallons per day (MGD).

The wholesale water supply system is Improvement District C. Improvement District C
wholesales water to two other improvement districts, Improvement District No. 1 and
Improvement District A, which are operated by PDMWD as retail water service areas,
and to the Lakeside Water District and the Riverview Water District.

1.2.3Wastewater Agencies

PDMWD functions as both a water and sewer agency. The PDMWD sewage operations
serve only the City of Santee Corporate limits and a small portion of the community of
Lakeside and the Pepper Drive area within the County of San Diego. The community of
Winter Gardens and parts of Alpine and Lakeside are served by individual sanitation
districts operated by the County of San Diego. The City of El Cajon operates and
maintains sewage collection facilities within its incorporated areas.

1.3  LOCAL WATER RECLAMATION PLANNING

1.3.1San Diego Clean Water Program Planning

In 1981, the EPA tentatively approved the waiver for secondary treatment for the City of
San Diego, but reversed its tentative approval of the waiver. In 1987, the City of San
Diego decided to discontinue waiver efforts, and has proceeded to implement a
secondary treatment program while concurrently planning to maximize water
reclamation in the Metropolitan Sewage System (METRO) service area.

The Clean Water Program (CWP) for Greater San Diego was created to meet San
Diego's commitment to provide secondary treatment and water reclamation. The CWP
proposes a 24 MGD water reclamation plant for the Santee region by the year 2010.

1.3.2San Diego River Basin Reclaimed Water Planning Study

The recommended water reclamation of the project San Diego River Basin Reclaimed
Water Planning and Development Study (SDRB Study) combines the recommended
wastewater treatment alternative for the Santee Water Reclamation Facility (WRF) and
the recommended reclaimed water distribution facility alternative into an overall project.




                                  1-3

PAGE 128 Show Image
Phase I of the study includes an initial 14 MGD nutrient removal plant with stream
discharge that is ultimately expandable to 34 MGD. Uve-stream conveyance is used to
deliver reclaimed water to downstream users and pipelines are used to serve upstream
users.

1.3.3Basin Plan Amendments

Since the implementation of the Basin Plan in 1976, three changes of Basin Plan water
quality objectives for the San Diego Hydrographic Unit have been approved to relax the
ground water quality objectives to promote the use of reclaimed water in the region.

In April 1990, the Regional Board adopted Resolution No. 90-26 which modified Chapter
5, Implementation Plan of the Basin Plan. The recently adopted Resolution No. 90-40
revises Resolution 90-26 by adding additional language that narrows the setting of
effluent limitations for reclaimed wastewater constituents to a range no higher than the
Basin Plan groundwater objectives, and no lower than an increment above the Basin
water supply.

1.4  RECLAIMED WATER POUClES, REGULATIONS, AND REOUIREMENTS

1.4.1Regulatory Requirements

In California, the policy on the use of reclaimed water is in Sections 13650 and 13551,
Article 7, of the California Water Code, titled "Waste Water Use".

The State Department of Health Services (DHS) has established quality, treatment,
reliability, and operational standards for the reuse of reclaimed water, which are
contained in Title 22, Division 4 of the California Administrative Code (Title 22).

The DHS requires that an engineering report be prepared containing a detailed design of
the proposed reclamation system. In addition to the detailed engineering report, a
contingency plan will be required to assure that no untreated or partially treated
wastewater is used. Guidelines in Title 22 also describe the operational procedures to
be implemented at the reclamation facilities.

The Regional Water Quality Control Board (Regional Board) issues State Waste
Discharge Requirements to agencies producing reclaimed water, and discharging
treated wastewater to land. The Regional Board issues federal National Pollutant
Discharge Elimination System (NPDES) permits to agencies discharging treated
wastewater to navigable waters of the U.S.

To the users and purveyors of reclaimed water, the Regional Board issues a separate
permit termed Water Reclamation Requirements, which describe the criteria and
restrictions required for the safe use of the reclaimed water.





                                 14

PAGE 129 Show Image
1.4.2Irrigation Water Quality Criteria

Reclamation of wastewater for irrigation must include a comparison of the quality of
reclaimed water with standards applicable to irrigation use.

Salinity, measured in total dissolved solids (TDS), is one of the most important water
quality parameters in determining the suitability of reclaimed water for irrigation. When
reclaimed water is used for irrigation, salts may accumulate in the soil.

Toxicity due to a specific ions occurs when that ion is absorbed by the plant and
accumulates in the plant in amounts that result in damage. Sodium, chloride, nitrogen
and boron in high concentrations are of particular concern in irrigation because of their
potentially toxic effects on some plants.

The forms of nitrogen found in wastewater, largely ammonium with some nitrate, behave
in the same manner as applied fertilizer nitrogen. Excessive nitrogen levels may cause
problems in some sensitive plants by stimulating vegetative growth instead of flowering
and fruiting.

1.5  WASTEWATER FACILITIES AND FLOW CHARACTERISTICS

1.5.1Santee Water Reclamation Facility

Operated since January of 1968, the existing Santee WRF, which is now owned by
PDMWD, is located in the western portion of the City of Santee in Sycamore Canyon.
The PDMWD has completed the planning, environmental review process, and
preliminary design work for an expansion of the Santee WRF to 4.0 MGD. Along with
plant expansion, the PDMWD is proposing modifications to the Regional Board's Basin
Plan and its NPDES permit. These revisions would allow a year round discharge of up to
4.0 MGD of reclaimed water through Santee Lakes into Sycamore Creek and the San
Diego River.

1.5.2Wastewater Tributary Basins, Flows, and Quality

The PDMWD wastewater facilities serve an area of about 13,000 acres that are located
almost entirely within the City of Santee, but also extend into a small section of San
Diego County. The wastewater conveyance system consists of about 139 miles of
sewer, trunk sewer and force mains, and four pump stations.

The existing flows from the nine drainage basins within the PDI\4WlD service area
currently average 4.87 MGD, with a peak hourly flow of 9.24 MGD. Ultimate flows for the
PDMWD wastewater conveyance system are projected to be about 12 MGD by the year
2035 with a corresponding peak flow of 22 MGD.

PAGE 130 Show Image
The San Diego County Water Authority (SDCWA) has developed criteria for wastewater
quality to ensure the suitability of wastewater for reclamation samples of wastewater at
various locations within the study area have been analyzed by the Industrial Waste
Control Division of the City of San Diego's Water Utilities Department. The samples
exhibit acceptable wastewater quality based on TDS levels.

The SDCWA has also developed criteria for wastewater quality control in areas tributary
to reclamation facilities. These tributary protection measures include monitoring, inflow
and infiltration protection, industrial waste regulation, and regulation of self-regenerating
water softeners. The PDMWD currently has a general ordinance for tributary protection
measures that restricts or prohibits waste discharges to the wastewater system upon a
finding by a noticed public hearing that the discharge is harmful to wastewater treatment
and reclamation facilities or reclaimed water users.

1.6  RECLAIMED WATER MARKETS

In the study the term "reclaimed water market" is used to identify a location where
reclaimed water could be used to replace the use or future use of potable water. The
reclaimed water markets were divided into five main categories: irrigation uses, industrial
uses, commercial building uses, recreational uses, and ecological enhancement.

Irrigation uses of reclaimed water may include the irrigation of pastures, crops,
nurseries, golf courses, cemeteries, parks, campuses, and residential, commercial and
freeway landscaping. Irrigation water demands are non uniform, varying seasonally from
the effects of wet and dry weather periods.

The amount of water required for irrigation is dependent on the type of vegetation, soil
type and condition, hours of daylight, temperature, topographic and geologic conditions,
and the method of irrigation water application. In the report, an average applied water
irrigation demand of 30 inches per year [2.5 acre feet/year (AF/YR)j was used for
landscape irrigation markets, unless specific data was available.

Three areas of agricultural production are included as potential markets for reclaimed
water use: the 560 acre avocado grove of Rios Canyon Ranch, 28 acres of avocado
production along La Cresta Road, and the approximate 600 acres of land designated as
agriculture preserve located in the Lakeside Community Plan.

The Carlton Oaks and Willowbrook Country Clubs maintain two golf courses, and three
additional golf courses in the planning stages were identified. Golf courses are planned
for the Fanita Ranch, Alpine, and High Meadow Ranch developments. The Fanita Ranch
Golf Course will be about 175 acres; however, since it is likely that much of the golf
course will remain in a natural state with no irrigation and since no details are available, it
was assumed that 60 percent of the 175 acres will be irrigated. An 80 to 90 acre golf
course is planned for the High Meadow Ranch development.

PAGE 131 Show Image
Water use by the California Department of Transportation (CALTRANS) for irrigation of
landscape along freeways within San Diego County offers a potential market for
reclaimed water. Areas of landscaping along freeways include medians, right-of-ways,
and interchanges of Interstate 8 and 67, proposed Route 125, and the planned extension
of Route 52.

The City of Santee irrigates and maintains several landscaped medians of major streets
such as Mast Boulevard, Carlton Hills Boulevard, Mission Gorge Road, and Town Center
Parkway. A significant market for reclaimed water is the irrigation of the many city and
county parks within the study area. Reclaimed water can also be used to irrigate school
yards. Like roadway medians, schools have small potential irrigation demands, but are
easily identified and can be included if near a larger market or distribution pipeline.

Reclaimed water can be used to irrigate common areas in residential neighborhoods and
front lawns of developments in single family areas with proper controls by a home
owners or simular association. Another beneficial use of reclaimed water would be to
irrigate fire breaks behind developments that border canyons, because brush-laden
slopes present a major fire hazard.

For the large undeveloped areas designated as residential use, it was assumed that 10
percent of the area that had slopes less than 25 percent had the potential to use
reclaimed water. Areas with slopes greater than 25 percent were considered
undevelopable.

The potential reclaimed water markets categorized as commercial/industrial
developments include the Santee Town Center, Upper San Diego River Improvement
Project (USDRlP), Edgemore Senior Center/Hospital, Home of Guiding Hands, and the
commercial/industrial parks around Gillespie Field. Three potential industrial markets
were identified which include Woodward Sand and Gravel, Nelson Sloan Sand Plant, and
Precast Concrete.

New potential markets for reclaimed water are the existing or proposed commercial
buildings within the study area. These buildings, if dual plumbed could utilize reclaimed
water. Neither the California Department of Health Services nor the San Diego County
Department of Health Services has approved the use of reclaimed water for indoor
commercial building use due to the questions and potential of cross connections.

Recreational use of reclaimed water includes replenishing the $antee Lakes to make up
water lost by evaporation, consumptive use by plants along the perimeter of the lakes,
and seepage.

The Regional Board believes that stream discharge to the San Diego River has great
potential for both promoting the use of reclaimed water and in enhancing a valuable
riparian habitat. The Regional Board is expected to allow the initiation of a year round
stream enhancement discharge to the San Diego River. As another potential use,
reclaimed water from the Santee WRF could be used as recharge water for groundwater
basins.



                                  1-7

PAGE 132 Show Image
1.7  RECLAIMED WATER SYSTEM

The reclaimed water system is based on the Santee WRF being initially expanded to 4.0
MGD. Future expansions of the Santee WRF will provide sufficient reclaimed water for
the subsequent phases of the reclaimed water system.

1.7.1Development of Reclaimed Water System

Transmission and distribution pipelines will be sized to meet peak day demands.
Transmission facilities between pump stations and to reservoirs will be constructed by
the PDMWD. Distribution pipelines to individual markets beyond the Initial Prnject will be
the responsibility of the reclaimed water users. Where reclaimed water is planned to
serve an existing demand, water pressures at least equal to the pressure of the existing
system is required to minimize on-site retrofitting. Similar to the potable water system,
the reclaimed water system will provide a minimum pressure of 30 pounds per square
inch (psi) and a maximum pressure of 200 psi. The pressure zones of the reclaimed
water system will parallel the pressure zones of the potable water system.

Transmission pipeline pump stations will be provided by the PDWMD and will be sized
for peak day demands, pumped over 24 hours. For reliability, a minimum of two pumps
will be supplied; one duty and one standby. Booster pump stations required to serve
individual markets will be the responsibility of the reclaimed water users.

Operational storage is required to match the 24-hour production and the 8 hour irrigation
period. The operational storage required to match the supply and demand is 67 percent
of the peak day demand, and will be provided by the PDMWD.

Hydraulic analysis of the distribution system was accomplished on a micro-computer
using the University of Kentucky's KYPIPE network analysis software. The reclaimed
water system was developed in two phases with the first phase being oversized to
accommodate future facilities and demands.

1.7.2Description of Reclaimed Water System

The Initial System will distribute approximately 3.5 MGD (4.0 MGD less the 0.5 MGD
losses from the Santee Lakes) of reclaimed water from the expanded Santee WRF to
those markets that have existing reclaimed water demands and those markets that are
expected to have demands by 1995 during the peak period. The annual reclaimed water
use will be about 2,216 AF/YR. Of this total reclaimed water use, approximately 366
AF/YR will be discharged to the Santee Lakes. The service area of the Initial System
primarily covers the developed areas of the City of Santee and the community of
Lakeside. The backbone of the distribution system includes a pump station at the
Santee WRF a pump station at the Santee Lakes, and a 30-inch pipeline extending to the
storage reservoir. A 24-inch pipeline continues from the reservoir to the end of the
service area. These pipelines are sized to accomodate the future flows of the ultimate

PAGE 133 Show Image
system. Smaller pipelines will be constructed to connect the system to the users. The
Initial System facilities are sized to accommodate the requirements of the Ultimate
System. The estimated cost for the Initial System facilities is $22,000,000 which includes
engineering, legal and administration, construction managements costs, and
contingencies. The O&M cost for the Initial System are estimated to be $123,000/Yfl.

The Ultimate System consists of a series of transmission pump stations and storage
reservoirs which define separate service areas. Additional distribution pipelines will be
constructed as development occurs. On a peak summer day, the ultimate distribution
system will distribute approximately 14 MGD of reclaimed water throughout the PDMWD.
Annually the Ultimate System will deliver about 7,325 AF/YR through the distribution
system and will discharge about 366 AF/YR to the Santee Lakes. The additional facilities
required for the Ultimate~System, including transmission facilities possibly funded and
constructed by the PDMWD and distribution facilities possibly funded and constructed
by developers, is estimated to cost $51,000,000. The additional O&M would be about
$1 ,180,000/YR.

1.8  CAPITAL IMPROVEMENT PROJECTS

The Capital Improvement Projects (Cl P) are those facilities which will be possibly funded
and constructed by the PDMWD. The ClP schedule for constructing these facilities is
based on the estimated market development, reclaimed water availability, and required
funds. The Initial System is scheduled for construction in Fiscal Years 1991-92 and
1992-93. The CIP schedule lists projects for a 10 Year System and an Ultimate System.

1.9  IMPLEMENTATION

The step to implement a water reclamation program for the Initial System are divided into
several components: environmental and regulatory, planning, and design and
construction. The environmental and regulatory component includes preparing
environmental documentation, obtaining Waste Discharge Requirements and Water
Reclamation Requirements from the Regional Board, and obtaining user agreements or
issuing permits. Planning tasks that must be undertaken include developing a
financial/revenue plan and reclaimed water pricing policy, preparing Rules and
Regulations, developing and executing a public awareness program, and coordinating
planning efforts among agencies. The design and construction component includes the
preparation of a design report; preparation of design plans and specifications; the
advertisement, bidding process, and award of the construction contract, and the actual
construction of the reclaimed water facilities.

1.10 ALTERNATE INITIAL RECLAIMED WATER SYSTEM

A separate analysis was conducted for the initial project without planned expansion and
is included in Appendix G. The smaller facilities constructed for the Alternate Initial
System would not accommodate future flows of the Ultimate System. The alternate

PAGE 134 Show Image
system requires a 14-inch pipeline from the pump station at the Santee WRF to a 3.66
million gallon (MG) reservoir and a 12-inch pipeline from the reservoir to the end of the
system as compared to 30-inch and 24-inch pipelines. For the most part, the smaller
pipelines that connect the users to the system are about the same size in both systems.
The estimated cost~for the Alternate Initial System facilities is $18,000,000 for capital
facilities and $1 12,000/YR for O&M.

From funding and planning standpoints, constructing the Alternate Initial System may be
beneficial. The funding currently available may only be sufficient to construct the scaled
down Alternate Initial System. The future reclaimed water demands of the large
undeveloped areas were estimated based on projected development. The uncertainty of
future demands may warrant constructing only facilities to serve markets with known
demands.

The disadvantage of constructing the Alternate Initial System would be experienced if in
the future it was decided to expand the system. The Alternate Initial System facilities
would have to be upsized to accommodate the increased flows of the expanded system.
Pipelines would have to be paralleled and larger pump stations would have to be
constructed. The original costs of the Alternate Initial System facilities plus the costs to
parallel the pipelines and to expand the pump stations would be greater than if the larger
facilities were constructed initially.




























                                 1-10

PAGE 135 Show Image
                            CHAPTER 2


                          INTRODUCTION




2.1  AUTHORiZATION


The preparation of this study was authorized by the Padre Dam Municipal Water
(PDMWD) in the form of a contract titled "AGREEMENT FOR PROFESSIONAL
ENGINEERING SERVICES BETWEEN PADRE DAM MUNICIPAL WATER DISTRICT
AND LUKE-DUDEK CIVIL ENGINEERS, INC." and dated March 28,1990.

2.2  BACKGROUND


The resolution aufhorizing Luke-Dudek Civil Engineers, Inc. (now Dudek & Associates,
Inc.) to prepare this Water Reclamation Master Plan was approved by the PDMWD
Board of Directors on February 13, 1990 by Resolution No. 90-13. The study was jointly
funded equally by the San Diego County Water Authority (SDCWA) and the PDMWD.

The PDMWD functions as both a water and sewer agency. As a multi-purpose agency,
the PDMWD provides wholesale and retail water; wastewater collection, treatment, and
disposal; water reclamation; and recreational facilities at the Santee Lakes Regional Park
and Campground. The PDMWD has no local supply of water and depends on imported
water purchased from SDCWA. In turn, the PDMWD wholesales water to the Lakeside
and Riverview Water Districts and retails water in the City of Santee, a portion of El
Cajon, and severnl~unincorpornted communities extending eastward including Alpine.
Sewer Service by the PDMWD is limited to the City of Santee, parts of El Cajon, and a
small portion of the County of San Diego.

The PDMWD owns and operates the Santee Water Reclamation Facility (WRF); however,
the PDMWD and the City of San Diego are currently in negotiations concerning the lease
of the Santee WRF site. These negotiations are the result of the City of San Diego's
secondary treatment program and concurrent planning efforts to maximize water
reclamation in the San Diego Metropolitan Sewerage System (METRO) service area.

The Clean Water Program (CWP) for Greater San Diego was created to meet San
Diego's commitment to provide secondary treatment and water reclamation. In July
1989, the CWP published the Water Reclamation and Reuse Master Plan for
Modffications to the Metropolitan Sewage System and the Framework Plan Report for
Modifications to the Mefropolltan Sewage System. Both plans identify water reclamation
facilities in various parts of the METRO service area, including the City of Santee. The
estimated capital cost of the recommended facilities, which would treat approximately
243 million gallons per day (MGD) by the year 2010, is $2.6 billion.





                              2~1'

PAGE 136 Show Image
Concurrent to the CWP planning, the SDCWA authorized Luke-Dudek Civil Engineers,
Inc. and Black & Veatch, Engineers-Architects to prepare the San Diego River Basin
Reclaimed Water Planning and Development Study (SDRB Study). The SDRB Study was
jointly funded by the SDCWA, PDMWD, and the City of San Diego, and the County of
San Diego who were all mutually interested in developing a feasible water reclamation
plan for the San Diego River Basin Area utilizing an expanded Santee WRF.

The PDMWD recognized the need to continue its efforts to implement a water
reclamation program within its water service area. On November 14, 1989, the Board of
Directors of PDMWD adopted Ordinance No. 89-13, "Ordinance of Padre Dam Municipal
Water District Amending Rules and Regulations of Improvement District A, Water
Division, and Improvement District No. 1 (Water Reclamation)." The adoption of this
ordinance defined the scope of the Water Reclamation Master Plan and authorized its
preparation. The scope and objectives of the Water Reclamation Master Plan are
described below.

2.3  MASTER PLAN OBJECTIVES

The purpose of the Water Reclamation Master Plan (Master Plan) is to define,
encourage, and develop the use of reclaimed water within the PDMWD boundaries. The
Master Plan will provide guidance for the planning, scheduling, budgeting, and
construction of a water reclamation system in the PDMWD.

The Master Plan describes the existing and future sewage system, drainage basins
tributary to the Santee WRF, and the proposed development of the Santee WRF. The
designation of sewage drainage basins tributary to the Santee WRF will allow the
PDMWD to implement permitting, monitoring, and control measures within its boundary,
and to negotiate such measures with agencies outside the PDMWD sewer service area.

The Master Plan identifies sources of potentially poor quality wastewater tributary to the
expanded Santee WRF based on existing wastewater quality data which is also reported
in the Master Plan. The Master Plan also discusses a source control program with
recommendations to preclude the discharge of contaminants, such as salts, that would
be detrimental to~the PDMWD's reclamation program.

Additionally, this Master Plan addresses the PDMWD regulations for reclaimed water use
within its boundaries. The Rules and Regulations will govern the design and operation of
reclaimed water facilities, and are required by the State Department of Health Services
(DHS) and the Regional Water Quality Control Board (Regional Board). The Rules and
Regulations are included in the Master Plan as Appendix I and will be able to be
distributed as a separate document. A Standard Reclaimed Water User Agreement has
also been prepared for the PDMWD's reclaimed water customers and is included as
Appendix J.






                                 2-2

PAGE 137 Show Image
A Public Awareness Program, is outlined in this Master Plan. Based on successful
programs by other reclaimed agencies, the Public Awareness Program will provide the
PDMWD with a plan to develop positive public relations on the subject of water
reclamation.

Implementation of the Master Plan is also presented as a schedule for the design and
construction of reclaimed water storage and distribution capital facilities. The capital
improvement projects schedule includes yearly projects for the initial five-year
reclamation program period, projects scheduled for completion by the tenth year of the
program, and projects required for the ultimate system. The schedule is phased based
on the demand and timing of market development, availability of reclaimed water, and
the reasonable availability of funding. Coordination among agencies including the
County of San Diego, City of San Diego, SDCWA, Helix Water District, Lakeside Water
District, Riverview Water District to treat, Lakeside Sanitation District, and the Alpine
Sanitation District purvey, and use reclaimed water is also taken into account in the
schedule.

The Master Plan is intended to be a changing document that is to be updated every five
years.

2.4  ACKNOWLEDGEMENTS

Dudek & Associates, Inc. wishes to acknowledge PDMWD staff, the SDCWA, and City of
Santee staff for their assistance in the preparation of this Master Plan.

























                                2.3

PAGE 138 Show Image
                               CHAPTER 3

                       DESCRIPTION OF STUDY AREA



3.1  STUDY AREA BOUNDARY AND LOCATION

The study area for this report is defined by the Padre Dam Municipal Water District
(PDMWD) water service boundary. The PDMWD is located about 20 miles from the
Pacific Ocean and about 22 miles north of the U.S. -Mexican border. The western border
is formed by the City of San Diego boundary adjacent the City of Santee and the eastern
border is defined by the National Cleveland Forest boundary. North of the PDMWD lies
the San Vicente and El Capitan Reservoirs and the Barona Ranch Indian Reservation.
The 85 square miles of the PDMWD are comprised of the City of Santee, a portion of the
City of El Cajon, and the unincorporated communities of Lakeside, Flinn Spring,
Harbison Canyon, Blossom Valley, Alpine, Dehesa, and part of the Crest area.

3.2  LAND USE

The existing and projected development within the study area is presented in Table 3-1.
Development of the incorporated areas within the study boundaries is guided by the City
of Santee General Plan and the City of El Cajon General Plan. Development of the
unincorporated areas within the study boundaries are guided by the Lakeside
Community Plan, the Crest/Dehesa/Harbison Canyon/Granite Hills Subregional Plan,
and the Alpine Community Plan which are part of the San Diego County General Plan.
These planning areas are shown on Figure 3-1. Since each area has specific planning
documents, the land use within each area will be discussed separately.

3.2.1Santee

Residential uses in Santee are primarily composed of single family detached units on
standard subdivision lots with some multi4amily developments generally located along
major roadways. Commercial development in Santee occupies 181 acres with the
majority devoted to retail uses. Industrial development is in the form of light industrial
uses characterized by assembly, electronics, research and development, and light
warehousing uses. Office professional development is limited, encompassing about 20
acres. Public/semi-public land uses including schools1 public and private parks, and
churches cover a considerable portion, about 25 percent, of the developed acreage in
the City of Santee. Over half the area of the City of Santee is currently vacant. The
primary vacant areas are undeveloped canyons and hillsides in the north and southeast
and steeply and rolling terrain in the southwest portion of the City of Santee. A significant
portion of vacant acreage is also found along the San Diego River corridor: the floodway,
the flood plain, and large relatively developable parcels.





                                  3-1

PAGE 139 Show Image
CITY OF                         ¼ Sen V~c.n a
SAN DIEGO                         Secarvolr                        ~aIac:rvo~r



                                     -                                  tan

                      -   L   ESIDE C ~MUN~%~

                          PL  N

                                 ~~~J `/I~,~~~,          - -
    Santee                                 Lake Jenntnge
    Lake~                             `    Raaarvotr










 Lake Murray              e             HARBISON CANYO;½t½.Lv~)zli~
 Reservoir                              GRANITE HILLS

                    EL CAJON         & SUBREGIONAL A~EA
                                        --u- ~7~t5iL~oveIand


            25






    LEMON
    GROVE








                   Sweetweter
                   Reservoir


      54











                                                              GRAPHIC SCALE

                                                              O~MI.




                                   FIGURE 3-1

                                PLANNING AREAS


                                                           DUDEK & ASSOCIATES, INC,

PAGE 140 Show Image
                                      Table ~1

                          Existing and Ullimate Development
                               Within the Study Area1



                             Existing Development        Projected Ultimate Development
l,and Use                          (Acres)                          (Acres)


Residential                       13,800                           35.390
Commercial/Industrial              1.200                            2,070
School/Institutional                 260                              320
Parks/Open Space                   1,440                            5,170
Vacant/Undeveloped                36,736                            1,370
All Other Categories               1.090                               90

Total                             43,040                          44,4102


Souroe: Oi~ft Waler Supply Plan, Waler Master Plan. WssIewatsrPlan, Engineering Scienoe, April IggO.

I Does not Include lakeside and Riverview Water Districts.
2 Includes area presently outside the PlOluW0's boundary.



3.2.2 El Cajon

The El Cajon Planning Area is a part of the metropolitan San Diego area, Only a small
portion of the City of El Cajon is included in the study area, which includes primarily the
Gillespie Field area. Adjacent the airport, the land use designations include both
industrial park and general industrial uses. Approximately 70 acres just southwest of the
field and industrial park is designated open space. The remaining areas of the City of El
Cajon within the study area are, for the most part, designated as residential, ranging
from low density to high density.

3.2.3 Lakeside

Findings in the Lakeside Community Plan report approximately 88 percent of the Current
Urban Development Area in Lakeside is planned for residential use. Single-family plan
designations predominate over about 90 percent of the area planned for urban
residential development. Large-scale agricultural uses have given way to residential
development; however, a considerable amount of small-scale farming still exists in the
community and many homes in the residential areas of Lakeside have small horse
corrals. The Lakeside Community Plan has approximately 300 acres devoted to
commercial uses which are located in the Lakeside Town Center and in other small
commercial developments distributed throughout the Community. The Lakeside
Community Plan identifies three major areas which are currently used for industrial
purposes: the Upper San Diego Improvement Project, the Slaughterhouse Canyon Area,
and the area along Olde Highway 80 east of Lake Jennings Farm Road,




                                         3.3

PAGE 141 Show Image
3.2.4Crest/Dehesa/Harbison Canyon/Granite Hills

The Crest/Dehes.a!Harbison Canyon/Granite Hills Subregion has three primary focal
points of land activity. These are comprised of the three communities of Crest, Dehesa,
and Harbison Canyon. Granite Hills is a developed area but lies outside the PDMWD
boundary. Crest and Harbison Canyon are both communities which retain fairly high
residential densities surrounded by areas of lower density estate development and large
areas of undeveloped land much of which is constrained from development. Small areas
of commercially zoned land exist in each of the communities. According to the
subregional plan, only three percent of the subregional planning area is in agricultural
production because of the severe topography and lack of imported water facilities. The
Dehesa Valley is orientated toward an agricultural lifestyle and although water is limited,
certain crops such as oats and hay are produced. Some small husbandry exists,
primarily horse breeding.

3.2.5Alpine

The Alpine Community Plan area covers 108 square miles situated in the foothills of the
Cuyamaca Mountains. Existing development has a rural character typified by light
agricultural activities practiced in conjunction with residential uses. The pattern for
community development presented in the Alpine Community Plan accommodates
growth in and surrounding the existing town of Alpine, designating the agricultural areas
and remote more mountainous areas for low density rural uses. Residential development
ranging from single family houses on half acre or less to multi4amily units is contained in
the Country Town (Town Center). Major commercial development is generally restricted
to properties along Alpine Boulevard, Arnold Way, and the Tavern Road-Interstate 8
interchange area.

3.3  WATER SUPPLY AGENCIES

A major element in the development of a new water source such as reclaimed water is
the evaluation of existing water supply issues and water quality. Water supply facilities
and water use trends will determine the need for additional water supply and the water
quality needs will establish the suitability of reclaimed water for reuse.

3.3.1Regional Water Supply Agencies

Potable water delivered to the study area is supplied through the vast delivery system of
the State Water Project and the Colorado River Aqueduct by the Metropolitan Water
District of Southern California (MWD) and the San Diego County Water Authority
(SDCWA).







                                 34

PAGE 142 Show Image
The MWD was organized in 1928 and is restricted to the production, transportation, and
distribution of water fdr municipal and domestic purposes. It supplies water to 27
member agencies in Southern California, including the SDCWA, with a combined
population of over 13 million people. MWD's firm supply from its Colorado River
Aqueduct and the State Water Project is anticipated to decrease from 1.97 million acre-
feet per year (AF/YR) in 1987 to 1.39 million AF/YR by the year 2000 unless additional
measures and facilities are initiated. Demand for imported water is expected to increase
from 1.6 million AF/YR to 2.0 million AF/YR during the same period.

MWD now has five pipelines providing service to the SDCWA. MWD's jurisdiction of
these pipelines end at a delivery point approximately six miles south of the Riverside-San
Diego County line at which point the SDCWA takes over.

The SDCWA delivers raw and treated imported water to its 24 member agencies which,
in turn, supply almost 95 percent of the population of San Diego County. The
distribution system of the SDCWA consists of the extension of the aqueducts from the
MWD delivery point to the member agencies throughout the San Diego County. The
primary treated water source is the Skinner Filtration Plants which is owned and
operated by MWD. Some treated water is also purchased from local treatment plants
within San Diego for delivery to other member agencies.

3.3.2Local Water Supply Agencies

The water agencies that serve the study area and adjacent areas are shown in Figure 3-
2.

The PDMWD began in 1977 as the result of the merger of the Santee County Water
District and the Rio San Diego Municipal Water District. As a water agency, PDMWD
sells water on a wholesale and retail basis to the are~ described above. The PDMWD
serves approximately 17,780 water customers. The current average water demand for
PDMWD is about 16 million gallons per day (MGD) (18,200 AF/YR) with a peak day
demand of 25 MGD.

The wholesale water supply system is called Improvement District C. The water for the
PDMWD is purchased from the SDCWA and enters Improvement District C through
connections at the SDCWA Aqueduct Pipeline No. 4 and at the Helix Water District's
R.M. Levy Water Treatment Plant at Lake Jennings. Improvement District C wholesales
water to two other improvement districts, Improvement District No. 1 and Improvement
District A, which are operated by PDMWD as retail water service areas, and to the
Lakeside Water District (LWD) and the Riverview Water District (RWD). PDMWD's
facilities include over 250 miles of water mains, 14 pump stations, 22 reservoirs, and 13
pressure reducing stations. The three largest reservoirs total 51 million gallons (MG) of
storage.






                                  3.5

PAGE 143 Show Image
                              I        RAMONA

 CITY OF                               M.W.D.
PoWAY


               27
                                   San VIc~nte                 (r
                                   ~fisIIrvoir




CITY OF
SAN DIEGO


     Santee
     Lakes












  Lake Murray
  RCS~rVO½i2~~~1xw.~.~~










                                            F



     LEMON                    OTAY W.D.





      j..   ·/ !~n:¼$;~irter             I
      54    ¼                                            TA$W.D.
                                                            L73.
          BA LD.                   --____

LEGEND

       STIlIDY AREA

M.W.D. MUNICIPA~ WATER DISTRICT                         GRAPHIC SCALE
W.D.   WATER DISTRICT                                    `I.
 ID.   IRRIGATION DISTRICT                               O1.53MI.
(I.D.) IMPROVEMENT DISTRICT


                                 FIGURE 3-2

                               WATER AGENCIES


                                                        I)UDEK & ASSOCIATES1 INC.

PAGE 144 Show Image
As mentioned1 the LWD purchases its water from PDMWD. As shown on Figure 3-2,
Lakeside Water District is just east of Santee. LWD's major water users are single family
dwellings and apartment complexes. Agricultural irrigation accounts for less than 2
percent of LWD's water use. The distribution facilities include three pump stations, a
booster pump, and five steel tank reservoirs with a total capacity of about 7 MG. LWD
also has a 1 MG reservoir not in use. The District's current demand is approximately
4,500 AF/YR.

The RWD also purchases water from PDMWD and, like the LWD, is responsible for
providing its own distribution system with customer services, billings, disinfection, and
general maintenance. In 1988, the RWD purchased 1,593 acre-feet of potable water
from PDMWD. The RWD has four reservoirs ranging from 0.84 MG to 1.5 MG, with a
total storage capacity of 4.24 million gallons, and several pump stations located in
Lakeside.

The municipal water supply for the study area is treated at either the Helix Water
District's R.M. Levy Treatment Plant or the MWD's Skinner Filtration Plant. In some
areas of the PDMWD, the water sources are blended. Water quality recently reported by
the PDMWD is listed in Table 3-2.

                                      Table 3-2

                           Municipal Water Supply Quality


                          Symbol              MWD        Helix Levy    Combined
Constituent               and Unit        Skinner Plant     Plant      Overall Range


Calcium                  Ca      mg/I          51           58          38 - 68
Magnesium                Mg      mg/I          22 -         24            20-26
Sodium                   Na      mg/I          78           79            72-87
Potassium                K       mg/I          3.9          4.0           3.6-4.2
Sulfate
Chloride                 SO4     mg/I         161           195          114-231
                         Cl      mg/I          84           70            67-100
NItrate
FIuoflde                 NO3     mg/I          ND1          ND1          ND1
                         F       mg/I          0.16         0.25         0.12-0.29
Total Dissolved Solids   TDS     mg/I          480          515          416-561
Total Hardness as        CaC03   mg/I          220          245          177-273
H + Concentration        pH                    8.04         7.75         7.55-8.20
Specific Conductance             I£mho/cm      790          833          721-880
Turbidity                        NTU           0.12         0.05         0.04 - 0.06


Sau~ce: Pad,. Dam Municipal WAter District Water Ouality Report 1989.

I Not detected in testing.











                                         3.7

PAGE 145 Show Image
3.4  WASTEWATER AGENCIES

This section provides a brief description of the wastewater collection and disposal
systems within service areas of the study area. Several sewer agencies provide sewer
services to the study area. The these agencies are shown on Figure 3-3.

As previously noted, the PDMWD functions as both a water and sewer agency. The
PDMWD sewage operations serve only the City of Santee Corporate limits and a small
portion of the community of Lakeside and the Pepper Drive are within the San Diego
County. The community of Winter Gardens and parts of Alpine and Lakeside are served
by individual sanitation districts operated by the County of San Diego Public Works
Department. The City of El Cajon operates and maintains sewage collection facilities
within its incorporated areas. Areas not served by a particular sewer agency are served
by on-site septic systems.

Sewage from the City of El Cajon; the Alpine, Lakeside, and Winter Gardens Sanitation
Districts; and about seventy-five percent of the sewage from the PDMWD sewer service
area is discharged into the San Diego Metropolitan Sewage System (METRO) via the
East Mission Gorge Interceptor Sewer (EMGlS). Sewage collected in METRO is treated
at the San Diego Point Loma Wastewater Treatment Plant. The Point Loma Plant
currently provides advanced primary treatment and releases the effluent into the ocean.

A portion of the sewage from the PDMWD sewer service area is pumped to the Santee
Water Reclamation Facility (WRF) which is located- north of Mission Gorge Road in the
western part of the City of Santee. The existing treatment plant facilities and capacities
are discussed in detail in Chapter 6.

PAGE 146 Show Image
                                     San Vlcentp.               (
                                     Resarvolr                  (


      7             - -                                         F Ca~I~sn
                                                                R~q~rvoi










                                                  Th  ¼--

                                                                              S







                                         ~U~~%Thn7~












LEGEND

 1   ~AeDR~r D8AeMrvMicWe~DArea Qo LEMON GROVE
                                   Sanitetlon District
 2   LAKESIDE Sanitation District
                                  SPRING VALLEY

     WINTER GARDENS Sewer          Sanitation District       GRAPHIC SCALE
 3   Melntenance District

 Q4  ALPINE Sanitation District Q2 OTAY Water District       01.53 MI.
                                   Sewer Service Area

 ~   City of POWAY
     Sewer Service Area

     RAMONA M.W.D.

 Q   City of SAN DIEGO                       FIGURE 3-3

     City of EL CAJON                   SEWER AGENCIES

     City of LA MESA

                                                        DUDEK & ASSOCIATES, INC.

PAGE 147 Show Image
                              CHAPTER 3

                             REFERENCES




Luke-Dudek Civil Engineers, Inc. and Black & Veatch, Engineers - Architects. San Diego
River Basin Reclaimed Water Planning and Development Study, October 1989.

City of Santee General Plan, January, 1986.

City of El Cajon General Plan 2000 City of El Cajon General Plan Amendment 1990-01

Part XXII, Crest/ Dehesa/Harbison Canyon/Grante Hills Subregion Plan, San Diego
County General Plan, December 1989.

Part Xl, Alpine Community Plan, San Diego County General Plan, December 1989.

Part IV, Lakeside Community Plan, San Diego County General Plan, December 1989.

Engineering Science, Inc. Final Padre Dam Municipal Water District Water Supply Plan,
July, 1990.

Engineering Science, Inc. Final Padre Dam Municipal Water District Water Master Plan,
July, 1990.






















                               3-10'

PAGE 148 Show Image
          PADRE DAM

                                           PROJECT
                                             A tsader In


          PAMMU                            Aeclamallon ~nce 1961
             DRE DA       NICIPAL WATER DISTRICT






FACT SHEET

Padre Dam Municipal Water District has been reclaiming and reusing water for 33 years.
Since 1968, highly treated reclaimed water has been produced from municipal wastewater to
supply the seven lakes in the Santee Lakes Regional Park and Campground. Boating and
fishing are popular activities on the Santee Lakes. Annual attendance at the park is over
290,000 visitor days.

The District is upgrading the treatment plant facilities at the Santee Water Reclamation Plan
to provide additional water for distribution to industrial, governmental and commercial
customers for irrigation. The District, recognizing that future potable water supplies are
becoming more limited, is planning to produce more reclaimed water as an economical source
of additional water. The District is dedicated to offering its customers a drought-proof supply
of water for outdoor irrigation.

Operational Chan~s
The treatment plant upgrade will involve installation of new processes to produce high quality
reclaimed water for the Santee Lakes and outdoor irrigation. A Bardenpho process will
remove organic matter, suspended solids, nitrogen and phosphorous from the water.
Chemical precipitation using alum will remove additional phosphorous. A final filtering
process will remove minute particles, producing a clear product. Chlorine disinfection with a
miminum of a 2-hour detention time will ensure the highest purification and safety standards.
The portion of reclaimed water for the Santee Lakes will be de-chlorinated to protect aquatic
life. Excess reclaimed water will be discharged through the Lakes to Sycamore Creek and
the San Diego River.

Distribution System
A 25-mile distribution system will deliver the reclaimed water to approximately 80 sites in
Santee. To date, the District has installed 10 miles of reclaimed water mains along and under
several city streets. As part of the upgrade project, 15 miles of new pipeline will be added.
All reclaimed and potable water mains are kept completely separate. The major reclaimed
water distribution mains will be along Carlton Hills Boulevard, Mast Boulevard, Magnolia
Avenue (north of Mast), Fanita Drive and Prospect Avenue in Santee.

An existing 1.5 million gallon water storage tank will be converted to hold reclaimed water
for operational (daily) storage. Annual irrigation demands for the system are approximately
325 million gallons. The distribution system is designed to deliver 2 million gallons per day
and will be capable of carrying additional flows to accomodate filture expansions.

PAGE 149 Show Image
Construction Schedule
Construction for the plant and distribution system is scheduled to begin in summer 995
The project plans to deliver reclaimed water to customers by the high irrigation demand
months of summer 1997 -


Ouplity of Reclaimed Water
The reclaimed water will be low in nutrients and suitable for many uses, It is ideally suited
for landscape irrigation of street medians, parks, golf courses and open spaces at commercial
facilities and residential housing. Reclaimed water has a proven safety record. Strict
monitoring controls are always in effect to ensure the safety of the product.  The quality of
reclaimed water is regulated by the State Regional Water Quality Control Board with input
from the San Diego County Department of Health Services. Reclaimed water will meet State
Administrative Code Title 22 criteria for the highest level of quality. This level is designated
safe for full body contact. i.e, it is safe for individuals to come into contact with the water.

In order to keep reclaimed water quality suitable for irrigation of all types of plant materials.
the District prohibits the use of self-regenerating water softeners which discharge salt brine
into the sewer system. This local ordinance is in effect throughout most of the District's
sewer service area.

Project Cost and Rates
The cost of the complete project is approximately $20 million. Low interest loans for over
half of this amount have been set aside by the State of California for this project. Additional
sources of funding are available and are being pursued by the District. Reclaimed water rates
will be set by the Padre Dam Municipal Water District Board of Directors.

Customer Application and Connection Process
The general process an applicant would follow is described here:
·     Request forms from the Director of Water Reclamation or Customer Service,
·     Review the District's Rules and Regulations governing the use of reclaimed water,
·     Make the necessary conversions or retrofits as recommended by the District,
·     Have the irrigation system inspected by the District,
o     Have meters connected to the reclaimed system by the District.

Speaker's Bureau and Plant Tours
The District has a taained Speaker's Bureau available to address businesses, clubs and
organizations. Groups of any number are welcome to tour the Santee Water Reclamation
Plant. Tour requests should be made in advance. For more information, contact Harold
Bailey, Director of Water Reclamation, Monday-Friday 7:00 AM to 3:30 PM, at 448-8600.






Revised 5/95
\wpdocs\recwater\facts2.kit

PAGE 150 Show Image
                       PADRE DAM MUNICIPAL WATER DISTRICT
          10887 Woodside Avenue, P.O. Box 719003, Santee, CA 92072-9003
                    (619) 448-3111     T.D.D. (619) 562-2778
                       office hours 8:00 a.m. to 5:00 p.m.

                                   FACT SllEET




llISTORlCAL DATA:   Ir' 1976. the voters of the District's service area approved the merger of the Santee
                    County Water District, formed in 1956, into the Rio San Diego Municipal Water
                    District. formed in 1955. The surviving agency was named the Padre Dam
                    Municipal Water District and uses 1955 as its origination date. The District is named
                    for the Old Mission Dam located just a few miles west of Santee. The dam, built
                    circa 1807, has been named a historic water landmark. It is located five miles east
                    of the Mission San Diego de Alcala, founded in 1769, the first of California's 21
                    Spanish missions. The aqueduct and flume supplied water to the mission and are
                    believed to be the first major non~indigenous irrigation project on the coast.

                    The District is a multi-purpose public utility providing wholesale and retail water,
                    wastewater collection, disposal, treatment, wastewater reclamation and recreation in
                    the Santee Lakes Regional Park and Campground.

SERVICE AREA:       Approximately 85 square miles in five improvement districts. Sewer service to the
                    City of Santee, parts of El Cajon, and the county of San Diego. Water service to the
                    City of Santee. parts of El Cajon, and the unincorporated areas of Lakeside, Flinn
                    Springs, Harbison Canyon, Blossom Valley, Alpine, Dehesa, and Crest.


POI~UL,t liON       Service area population estimated at 127,903
SERVED:             (based on 1990 SANDAG computations, adjusted for growth)

NUMBER OF           22,285 customer accounts; 13,133 accounts receiving water and sewer service;
CUSTOMERS           6,756 receiving water-only service; and 1,469 receiving sewer-only service; 239
                    vacant accounts


NUMBER OF           104
EMPLOYEES:

ANNUAL BUDGET:      $46,412,156 (1994/95)


WATER MAINS:        313.77 miles

RESERVOIRS:         26 tank, 5 partially underground and 3 completely underground reservoirs. High
                    water elevations range from 630 to 2,646 feet. Total existing storage capacity is
                    106.5 million gallons.

PAGE 151 Show Image
PUMP STATiONS:          14 pump stations. Elevations vary from 466 to 2,286 feet above sea level.


W~t TER SOURCES:        100 percent is purchased from the San Diego County Water Authority which in turn
                        ~buys it from the Metropolitan Water District of Southern California. The water is a
                        variable blend from the Colorado River and northern California sources. The District
                        has no reservoirs to collect natural runoff. The District wholesales water to the
                        Lakeside and Riverview Water Districts.


SEWER MAiNS:            142 miles. Approximately 80 percent of the sewage is discharged into the San
                        Diego Metropolitan Sewage System and 20 percent flows to the main sewage pump
                        station at the Santee Field Operations Center for reclamation.


SEWAGE LIFT             The District operates three sewage lift stations and one main sewage pump station.
STATiONS:

RECLItMA TU)N           The District~s reclamation plant processes 1 million gallons of wastewater daily
PLAIVT:                 (mgd) generated from the Santee area. The influent is processed by an activated
                        sludge secondary treatment process then further treated in oxidation ponds and per-
                        colation basins, disinfected and treated with alum. The reclaimed water then fills the
                        seven Santee Lakes. By 1997, the District will increase the treatment capacity of
                        the plant to 2 mgd, install a BardenPho treatment process, tertiary filters and a
                        chlorine contact chamber. The additional reclaimed water will be distributed in a
                        separate system to Santee customers with large irrigation needs.

SANTEE LAKES:           The District owns and operates the SANTEE LAKES REGIONAL PARK AND
                        CAMPGROUND located in the City of Santee. The 190-acre regional park, which
                        opened to the public in 1961, includes seven recreational lakes and surrounding
                        parkland. The lakes are filled with reclaimed water and are world-famous as a
                        unique and successful water reclamation project. The park offers picnicking, fishing
                        (stocked regularly), boating and camping. There are 152 full hook-up campsites with
                        complete facilities. The park is open year-round and receives nearly 400,000
                        visitors annually for day-use activities and overnight camping.

GOVERNING BODY:         The District is a public agency governed by a five-member Board of Directors, each
                        representing a geographic area within the District. Directors are elected by the
                        voters for staggered four-year terms. Board meetings are open to the public and
                        are held at 3:30 p.m. the second and fourth Tuesdays of each month at the District's
                        administrative office.


San tee tt'ater Reclamation Plant    Field Operations Center        San tee Lakes Regional Park
10925 Strath,norc Drive              9120 Carlton Oaks Drive        and Campground
P. 0. Bnx 719003                     P. 0. Box 719003               9040 Canton Oaks Drive
Santee, CA 92072                     Santee, CA 92072               P. 0. Box 719003
(619) 44(~'f6()()                    (619) 4484551                  Santee, CA  92072
                                                                    (619) 448-2482

1195

PAGE 152 Show Image
                                                   Reclamation Project Final
II.   PROJECT            SCRIPTION                 Subsequent EIR


A.    Project Location
Padre Dam MWD is located in San Diego County, about 20 miles from the Pacific Ocean and about
22 miles north of the Mexican border and provides sewer andlor water service to an area of
approximately 83 square miles which includes the City of Santee and the unincorporated communities
of Irakeside, Crest, and Alpine (see Figure 1). The District operates the Santee Water Reclamation
Facility (Santee WRF) which is located immediately north of Santee Lakes Regional Park and
Campground in the northwestern section of the City of Santee. The Regional Park and Campground
is also owned and operated by the District. Figure 2 shows the location of the Santee WRF and the
general area of Santee where reclalmed water will be distributed for landscape irrigation. Access
to the Santee WRF is from Mast Boulevard or Carlton Oaks Drive via either Fanita Parkway or
through the Regional Park and Campground. The District's Field Operations Area is also located
adjacent to Santee Lakes on the north side of Carlton Oaks Drive.

B.    Project Objectives
-Padre Dam Municipal Water District provides potable water and sewer service to approximately
12,534 customer accounts, potable water service only to approximately 1,686 customer accounts, and
sewer service only to approximately 1,326 customer accounts in the Cities of Santee, El Cajon, and
the westerly portion of the unincorporated community of Lakeside. The District provides potable
water service to approximately 6,364 customer accounts in the unincorporated communities of
Blossom Valley, Crest, Alpine and Harbison Canyon. The two service areas are not contiguous.

Currently, the district collects approximately 3.0 million gallons per day (mgd) of wastewater. Of
this amount, approximately 4 mgd is conveyed to the San Diego Metropolitan Sewerage System
(METRO) for treatment at the San Diego Point Loma Wastewater Treatment Plant and released into
the ocean via an outfall. One million gallons per day is conveyed via a pump station to the Santee
Water Reclamation Facility (Santee WRF) for reclamation and reuse in Santee laakes and irrigation
of Santee lakes Regional Park. The existing plant is currently rated at 2.67 mgd, however, the
overall treatment process is constralned by the diminished capacity of the percolation beds which
serve as natural filters. The capacity of the natural filtration system is approximately 0.3 mgd.

The purposes of this project and the overall Padre Dam Water Reclamation Project are to:

·     Increase the volume of reclaimed water to adequately supply Santee lakes and malntain the
      health of this recreational resource.

·     Provide a source of reclalmed water for landscape and irrigation, thus off-sening the demand
      for potable water. This will be the only source of water over which Padre Dam has control.

·     Provide for treatment and disposal of 2 million gallons per day of wastewater to diminish the
      volume of wastewater conveyed to METRO.




Pad~ Dam Water R~iamaLion Project ElR                                          3

PAGE 153 Show Image
Raw sewage treated at Santee WRF passes through a treatment process which consists of an extended
aeration activated sludge plant followed by oxidation ponds, percolation basins, chlorination, and
alum clarification. This process results in a level of tertiary treatment which allows discharge of up
to 0.999 mgd in Sycamore Creek and the San Diego River. The reclaimed water from the Santee
WRF is also suitable for use at the Santee Lakes Regional Park and Campground. The park consists
of seven reclaimed water lakes used for fishing and boating, day use picnic facilities, and overnight
camping areas.  In addition to replenishing water in Santee Lakes that is lost by evaporation, the
reclaimed water is used on approximately 12 acres of landscaping at Santee Lakes Park.

Reclaimed water from the Santee WRF not used for lake replenishment or on-site irrigation at the
Santee Lakes Regional Park, or lost to evaporation, is discharged into Sycamore Creek from Santee
Lake 1, or is stored in the oxidation ponds for discharge to METRO during off-peak hours.
Discharge from Lake 1 is limited to 0.999 mgd by Padre Dam MWD's National Pollutant Discharge
Elimination System (NPDES) permit. The NPDES permit is more restrictive on the discharge of
reclaimed water during the dry weather months from March through October to prevent
concentrations of nitrogen and phosphorus in the treated water from promoting algal growth in the
low water flows of Sycamore Creek and the San Diego River.

The proposed project will provide an upgrade of the activated sludge process, additional tertiary
treatment equipment at Santee WRF and a distribution system with a reclaimed water reservoir,
pump stations, and pipelines so that the reclaimed water can be used for landscape irrigation along
roadways, at commercial and business locations, at multi-family housing, and at local parks and
schools. The project goal is to provide for the treatment and re-use within the Santee area of 2.0 mgd
of tertiary-treated reclaimed water, with the excess discharged to Sycamore Creek. The existing
oxidation ponds will serve as future reclaimed water storage ponds so that some excess winter flows
can be stored for supplying the Santee Lakes during summer when irrigation demands are high.

C.    Proposed Project
The proposed project includes improvements at the Santee WRF Plant Site located at the northerly
end of Santee Lakes, a distribution system for reclaimed water consisting of pipelines and other
improvements located throughout the City of Santee, and flood control and operating system
improvements at the Field Operations Area located on the north side of Carlton Oaks Drive.

1.    Plant Site Improvements

The proposed project will utilize existing treatment processes, convert and upgrade some existing
facilities, and construct new tertiary treatment facilities to provide a capacity of 2.0 mgd. Figure
3 is a flow diagram showing how the new treatment facilities will be integrated into the existing
treatment system. This upgraded process will enable wastewater to be treated to a level that permits
public contact ("non-restricted") in accordance with Title 22 criteria of the California Administrative
Code, which is the most stringent standard for reclaimed water use, and for discharge to Sycamore
Creek and the San Diego River Watershed.

The California Regional Water Quality Control Board, San Diego Region (RWQCB) has issued
Order 92-12 which sets requirements for discharge of wastewater to land and governs the use of



4                                         I~adre I)am Water Reclamation Project ElR

PAGE 154 Show Image
reclaimed water for irrigation; and Order 9348 which sets out requirements for discharge to Santee
Lakes and the San Diego River Watershed, up to a volume of 2.0 mgd.

Primary and Secondary Treatment Process.  The primary treatment process will remain
unmodified. Existing primary tanks are covered and malodorous air is withdrawn and introduced
into the aeration basins which serve to reduce the odor. One-half of the existing secondary treatment
tanks will be converted into the five-stage Bardenpho modification of the activated sludge process.
This is a biological nutrient removal process which effectively reduces nitrogen and phosphorous in
the effluent. The process is also effective at removing suspended solids and suspended and dissolved
organic material from the wastewater. The existing clarifiers will be utilized without modification.
Process pumping will be upgraded where necessary.

Tertiary Treatment Process. The addition of tertiary treatment facilities requires new operating
equipment and structures. Figures 4 and 5 show the existing Santee WRF and the proposed and
future facilities.  The major components of the process include two flocculation basins and
sedimentation tanks to provide coagulation, precipitation of phosphorous as an insoluble alum salt,
and clarification. The next process is denitrification filters where methanol is added in low doses
to facilitate conversion of nitrate to nitrogen gas while filtration to remove particulate matter is
achieved. Chlorine solution is then added as a disinfectant, and held in contact for two hours. Flow
for the reclaimed water distribution system will go directly to the reclaimed water pump station.
Flow for Santee Lakes or for storage in the existing oxidation ponds will be de-chlorinated by the
addition of sulfur dioxide.

Other Improvements. Other improvements are provided to support the main process described
above. Improvements to the chlorine storage and chlorine feed rooms will be made. A chlorine
scrubber will be provided to neutralize any chlorine that escapes in the containment rooms.  A
chemical storage area with a containment structure will be built. A new dechlorination building will
be provided. Other improvements are a new paved access road, various sidewalks, stairs, ramps and
safety railings. The existing operations building will be converted into a multipurpose room and
other support offices. The existing denitrification building will be converted to office spaces. The
existing control building will be modified into a larger laboratory, a control room, and office spaces.

Two existing tanks will be converted to a sludge fermentation tank and a washwater recovery tank.
An odor control system will be provided for the sludge fermentation tank. All improvements are
to be constructed within the existing graded and fenced plant area. Figure 6 is an elevation of the
proposed facilities as would be viewed from the east, looking west. New landscaping would also
be installed throughout the plant area.

Chemicals Stored and Used On-Site. The following chemicals will be stored and used on-site:

·     Chlorine gas in 1-ton containers
·     Alum solution
·     Polymers in liquid form
·     Methanol
·     Sulfur Dioxide in 1-ton containers.
·     Sodium Hydroxide in liquid form in the chlorine gas scrubber.
·     Sodium Hypochlorite in liquid form


Padi: Dam Wa&:r Rcciamauon Project EIR                                             II

PAGE 155 Show Image
Future Improvements. The plant is designed to be upgraded to a 4.0 mgd facility by additions to
the flocculation/sedimentation facility, filters, chlorine contact basins, and an additional secondary
clarifier. These fliture improvement locations are also shown on Figures 4 and 5.

Failsafe Disposal ~r Treated Effluent. The proposed project is required to have an alternative
failsafe method of effluent disposal pursuant to Title 22, Division 4, Chapter 3, Reclamation Criteria,
of the California Administrative Code. One failsafe method proposed by the project is live-stream
disposal to Sycamore Creek. The Santee WRF, pursuant to its NPDES Permit, is presently allowed
to discharge up to 0.999 mgd to Sycamore Creek and will be allowed to discharge 2.0 mgd when
the upgrade is complete. Additionally, the Padre Dam MWD has an agreement with the City of San
Diego to convey up to 6.22 mgd of raw sewage to the METRO System. This bypass system, along
with discharge to Sycamore Creek, would provide failsafe disposal for the proposed project.

Water Redamation Master Plan. The proposed project would implement a portion of the Padre
Dam Municipal Water District Water Reclamation Master Plan, prepared for the Padre Dam MWD
and the San Diego County Water Authority in February, 1991.  The proposed project would
implement only the initial components of the Master Plan and would not implement the Ultimate
System, which would serve an expanded reclaimed water market and would encompass a much larger
distribution system (see Section 6.1.2 of the Padre Dam MWD Water Reclamation Master Plan) than
that presently proposed.

2.    Distribution System Improvements

The proposed system would distribute approximately 800 to 1000 acre-feet annually of reclaimed
water from the expanded and upgraded Santee WRF to reclaimed water markets as listed in
Appendix D. These reclaimed water markets include landscaping for schools, parks, roadways, open
space, commercial and industrial developments, and a hospital.  Transmission and distribution
pipelines would range from 4" to 20" in diameter. Transmission facilities between pump stations
and markets would be constructed by the Padre Dam MWD and are proposed to extend
approximately 80,000 linear feet. The proposed distribution pipelines, as well as approximately
55,000 feet of existing pipelines, are shown on Figure 7. Table 1 is a detailed list of the proposed
pipelines to be installed. Caltrans would install pipelines for landscape irrigation for the extension
of Highway 52 from Big Rock Road to Fanita Road.

The service area of the reclaimed water distribution system generally conforms to the developed
areas of the City of Santee, as reclaimed water markets with an existing demand and location near
the Santee WRF were selected to minimize system cost. An existing 6" line in Mast Boulevard
extends into the City of San Diego and would serve Sycamore Canyon landfill. Water pressures at
least equal to the pressure of the existing system is required to minimize onsite retrofitting. Similar
to the potable water system, the reclaimed water system would provide a minimum pressure of 25
pounds per square inch (psi) and a maximum pressure of 200 psi.  The pressure zones of the
reclaimed water system would parallel the pressure zones of the potable water system.

Fanita Terrace Reservoir, also shown on Figure 7, would be taken out of service as a potable water
reservoir and used to provide the necessary hydraulic gradient to maintain system pressures. The
same capacity, 1.5 million gallons, would be maintained and minor repair and rehabilitation work
would be conducted prior to use as a reclaimed water reservoir. A potable water booster pump


12                                        Padrc Darn WaLcr Rectampuon Projcct EIR

PAGE 156 Show Image
station would be constructed within the graded or paved area adjacent to the reservoir in order to add
potable water to the system if needed to maintain a reliable supply to reclaimed water users. A new
larger potable water reservoir, known as Mesa Road Reservoir, is to be constructed in the ft:ture
approximately one mile east of Fanita Terrace Reservoir as a separate project.


                         Table 1. Proposed Distribution System
SLreet Name                                   1A~CStion                                               SizefLength
Padre Dam Aoeess Road                         Approximately 5' from cdge of existing pavement          20"!802' j
Organdy Lane from Poplin Drive to Rancho      Varies - street center line to 5' north of street        20"!905' j
Panita Drive                                  center line
Rancho Fanita Drive from Organdy Lane to      Varies from 6' northeasterly of street center line       20"!1547'j
Mission Gorge Road                            to 10' west of street center line
Mission Gorge Road from Rancho Fanita Drive   10' south of street center line                          20"!1310'j
to 860' east of Crossway Court
Mesa Road from Rancho Fanita Drive            Varies from 20' WeSt 0£ street center line to 10'          12"800'j
to 800' north                                 east of street center line
Prospect Avenue from 90' west of Panita Drive Varies from 10' south of street center line to 20'        6'1341 `j
to 260' east of Fanita Drive                  south of street centerline
Prospect Avenue from 567' west of Argent      Varies from 10' south of street center line to 11'        8"12088'j
Street to 571' east of Pathway Street         north of street center line
Mission Gorge Road from Fanita Drive to       Varies from 6' north of street center line to 49'        16"!1060'j
Canton Hills Boulevard                        north of street center line
Easement and Canton Hills Boulevard from      Varies from 14' west of street center to 41' west        16"rfl43'j
Mission Gorge Road to Lake Canyon Road        of street center line




                                                                                                      16"!5789' j
Mast Boulevard from Fanita Parkway to Carlton Varies from street centerline to 14' north of            8"11765' j
Hills Boulevard                               street center line
Mast Boulevard from Canton Hills Boulevard to Varies from 14' north of street center line to 32'       12"18704'j
Magnolia Avenue                               south of street centerline
Cuyamaca Street from Willow Pond Drive to     32' east of street center line                            6"!2100'j
Mast Boulevard
Cottonwood Avenue from Claudia Avenue to      8' west of street center line                            6"!1250' j
Palm Glen Drive
Palm Glen Drive from Cottonwood Avenue to     Varies form 12' north of street center line to 7'         6'fl04' j
Magnolia Avenue                               north of street center line
Magnolia Avenue from 1400' south of Palm      Varies from 10' east of street center line to 33'         8'!6032'j
Glen to Woodglen Vista                        east of street
Woodglen Vista Drive from Woodpark Drive to   Varies from 7' north of street center line to 15'          6"fl85'j
Magnolia Avenue                               north of street center line
Olive laane from 460' south of Mission Gorge  7' west of street center line                              4"1458'j
Road to Mission Gorge Road
Mission Gorge Road from 800' west of Olive    Varies from 30' south of street center line to 20' 4" and 6"!6481'j
lasne to Edgemore Drive                       north of street center line
Kenny Street from 600' west of Magnolia       10' south of street center line                            6"!600'j
Avenue to Magnolia Avenue
Magnolia Avenue from Kenny Street to 180'     Varies east of street center line                          6"1181'j
north of Kenny Street


Padre Dam Water Reclamation Project ~R                                                21

PAGE 157 Show Image
                    Table 1 (Continued). Proposed Distribution System

Street Name                                    Location                                           Sizeii~ngtb
inwood Drive from 185' south of Canton Oak'    5' west of street center line                          8~~185'j
Drive to Canton Oaks Drive
Cariton Oaks Drive from Inwood Drive to Stoyer Varies north side of street center line            S"!5910' j
Drive
Mesa Heights Road from Mesa Road to 80' east   16' south of street center line                       4"!993'~
of Mesa Ridge Road
Park Avenue f~~~m Cottonwood Avenue to         Varies north of street center line                   6"!1716'~
Magnolia Avenue
Magnolia Avenue from Park Avenue to 975.       Varies west of street center line                     6"1975'
north of Park Avenue
Willow Grove Avenue from Cariton Hills         5' north of street center line                      10~fl659'j
Boulevard to 150' east of ~1uowgrove Place
Tamberly Way                                   5' east of street center line                        4"1360'j
Carefree Drive from 592' west of Magnolia      10' north of street center line                      4~!592' i
Avenue to Magnolia Avenue
Crossway Court                                 20' east of street center line                        4~I305'j
Argent Street                                  10' west of street center line
Mast Bouievard from Magnolia Avenue to 600'    Varies from 24' south of street center line to 32' 12"!598' i












*  Converting an existing potable water pipeline to a reclaimed water pipeline


Please note that the Final Mitigated Negative Declaration referenced in Section 1, herein, addressed
four pipeline routes which have been deleted from the proposed project: Rancho Fanita Drive from
Organdy latne to Mesa Road was deleted because a portion of Rancho Fanita Drive is not currently
an improved street and surveys for biological and archaeological resources may need to be conducted
for this route; Mesa Road southerly of Mesa Heights Road was deleted because of biological and
archaeological considerations and because an alternative route within the Future Highway 125 may
be available in the future to serve Grossmont College; Magnolia Avenue from Prospect Avenue to
Park Avenue is not needed for existing reclaimed water markets to be served in this pipeline
construction phase; and Carlton Oaks Drive from Inwood Drive to Weathersfield Road is not needed
for existing reclaimed water markets to be served in this pipeline construction phase.

3.    Operations Area Improvements

The Padre Dam MWD Operations Area is located on the north side of Carlton Oaks Drive adjacent
to the main entrance to the Santee Lakes Regional Park and Campground. Sycamore Creek borders

22
                                                         Padre Dam Water Reclamauon Project EIR

PAGE 158 Show Image
the Operations Area on the west side. An existing influent pump station would be modified and
flood protection improvements would be installed at the Operations Area.

Proposed improvements within the Operations Area are shown on Figure 8 and described as follows:

      Flood Protection Improvements. Flood control improvements designed for 100-year storm
      protection are proposed along the north, west, and south side of the Operations Area and at
      the southwest corner of Santee Lake 1. The improvements consist of a wall to replace an
      existing block wall and fence on the west and south side of the Operations Area, a concrete
      dike and fence to replace a fence along the north side, a storm drain outlet on the south side,
      and various drainage sumps and pipes to direct surface drainage to the storm drain outlet on
      the south side of the Operations Area.  A concrete dike approximately 70 feet in length
      would be installed at the southwest corner of Lake 1 to match grade elevation 324.0 and
      prevent overflow of the lake into the Operations Area during a storm or flood.
      Approximately 8,000 square feet at the Operations Area entrance adjacent to Carlton Oaks
      Drive would also be re-graded to improve Site drainage and flood protection.

      Pump Station Improvements.  The existing influent pump station located at the Field
      Operations Area will be upgraded and fitted with a new odor control system. The upgrade
      will consist of comminutors to grind large particles in the wastewater, a low lift pump system
      to convey wastewater to METRO and to feed the high lift pumps which convey wastewater
      to the Santee WRF.  Compressed air will be added to the force main to help control
      generation of hydrogen sulphide which causes odors at reclamation plants.


D.    Environmental Setting
Potential project impacts will occur throughout the Santee area as a result of the proposed
construction of a system of reclaimed water distribution pipelin-es. More location-specific potential
impacts will occur in the vicinity of the Santee WRF and Padre Dam MWD Field Operations Area
located at the north and south ends, respectively, of the Santee Lakes Regional Park and
Campground.

The City of Santee is a growing community distinguished by its location along both sides of the San
Diego River. Incorporated in 1980, Santee has seen the development of new housing projects and
a regional commercial district known as Santee Town Center. Although sensitive native habitats
occur within the City, the majority of natural biological resources have been disturbed by urban
development and other human activities. The San Diego River corridor through Santee has been
altered by high flood waters, sand extraction activities, flood control improvements, and recreational
uses.  In general, native riparianloak woodland and non-native ruderal vegetation exists in the
undeveloped drainages while chaparral and coastal sage scrub dominate the upper slopes in the
southern and northern portions of the City. Freshwater habitat also exists within Santee Lakes and
in the San Diego River, Sycamore Creek, and Forrester Creek.

Significant natural areas within the City include the northern portion of the City where coastal sage
scrub and chaparral cover the hillsides and seasonal drainage flows toward Sycamore Creek; the
southwestern area of the City which contains portions of the steep, chaparral-covered slopes of



Padre Dam Water Reciamauon Project ~lR                                        23

PAGE 159 Show Image
Cowles Mountain and the Mission Trails Regional Park; and Rattlesnake Mountain in the
southeastern portion of the City dominated by coastal sage scrub.

Improvements proposed at the Santee WRF will occur within the fenced plant area on an existing
graded and cleared pad. The WRF is adjacent to the undeveloped Fanita Ranch area located to the
east and northeast. The nearest existing homes are approximately one-half mile to the southeast.
West and north of the Santee WRF is vacant land within the Miramar Naval Reservation; and to the
south is Padre Dam MWD's Santee Lakes Regional Park and Campground. Future development of
Fanita Ranch east of the Santee WRF is expected to result in up to 3,500 residential units, support
commercial uses, parks, natural open space, and a school.

With minor exceptions, improvements at the District's Field Operations Area will also occur within
the fenced and developed District land located east of Sycamore Creek on the north side of Carlton
Oaks Drive. The exceptions are a drainage outlet and grading which will extend into a landscaped
area on the south side of the fenced Operations Area; and a flood control dike to be installed at the
southwest corner of Santee Lake 1.

The Field Operations Area is bounded by Sycamore Creek on the west and Santee Lakes to the north
and east. West of Sycamore Creek is a residential area approximately 300 feet to the west of the
Operations Area; and on the south side of Carlton Oaks Drive is a residential area located
approximately 200 feet south of the Operations Area.

Sycamore Creek is an ephemeral stream nine miles long that originates southeast of the City of
Poway and dralns approximately 18 square miles of land to the north and west of Santee Lakes.
South of Carlton Oaks Drive, Sycamore Creek flows through the Carlton Oaks Golf Course as it
joins the San Diego River.

Much of the existing vegetation in the adjacent portion of Sycamore Creek was removed for flood
control in 1986. Adjacent to the Operations Area is a naturalized channel between 175' and 400'
wide.  Over the years it has become revegetated with a mixture of native and non-native species
which is predominantly southern willow scrub (Padre Dam, 1989).  Along the west side of the
Operations Area, a 6' chain link fence and/or a block wall 3, to 4' high separates the Operations
Area from Sycamore Creek.

West of the wall/fence is a level area of 5' to 6' in width and a slope 4' to 5' in height to the
Sycamore Creek streambed. The total overall distance from the wall/fence to the streambed is a
minimum of approximately ten feet. The slope bank and level area along the east side of Sycamore
Creek contains a mixture of willows, Brazilian and California peppers, oleander, yew pines, fan
palms, and wild grape which provide a visual screen for the Operations Area. Ice plant (Carpobrotus
edulis), giant reed (Arundo donax), hottentot fig (Carpobrotus edulis), African umbrella plant
(Cyperus alternifolius), and pyracantha also occur in this area. In addition to willows, native species
within the southern willow scrub (riparian) vegetation along the Sycamore Creek streambed include
chaparral broom, buckwheat, sage, mule-fat (Bacchait salicifolla), and lowland cudweed
(Gn~phallum paiustre).

The Biology Report (Padre Dam, 1989) for the Water Reclamation Project surveyed this portion of
Sycamore Creek for least Bell's vireo and other sensitive wildlife and individual plant species. While


24                                                Padrc Darn WaLcr Rcciamauon Project ~R

PAGE 160 Show Image
none were observed, sensitive species were identified in similar nearby habitats.  Some of these
sensitive wildlife and plant species would be expected to occur in Sycamore Creek. The Biological
Resources section of this EIR further describes existing habitat conditions in Sycamore Creek.


E.    Background
The Padre Darn MWD functions as both a water and sewer agency. Its current wholesale and retail
water operations serve approximately 120,000 customers with an average water demand of about 18
mgd.  The District depends on imported water purchased from the San Diego County Water
Authority to serve the City of Santee, a portion of the City of El Cajon, the Lakeside and Riverview
Water Districts, the community of Crest, and other unincorporated areas to the east, including the
community of Alpine.

Sewage operations by Padre Dam serve only the City of Santee, small areas within the community
of Lakeside located east of Santee and a small unincorporated area located north of El Cajon (Pepper
Drive). Approximately 80 percent of the District's sewage effluent is discharged to the METRO
system and is conveyed via the East Mission Gorge Interceptor Sewer (EMGIS) and the East Mission
Gorge pump station and force main to Point Loma Treatment Plant and ocean outfall. The City of
El Cajon and Sanitation Districts for Lakeside, Alpine, and Wintergardens also utilize EMGIS for
conveyance to METRO.

The Santee WRF has been in operation since 1968. As discussed in the Project Objectives (Section
II.B, herein), the treatment plant is currently rated at 2.67 mgd, and is further constrained by the
diminished capacity of the percolation beds which serve as natural filters. The District's NPDES
permit allows the discharge of up to 0.999 mgd of tertiary treated water into Sycamore Creek and
the San Diego River watershed.

In 1989, Padre Dam MWD certified the Final EIR for a proposed capacity increase at the Santee
WRF to 4.0 mgd; and in 1991 adopted the Water Reclamation Master Plan which had been prepared
for the District and the County Water Authority.  These documents were prepared to enable the
District to increase its discharge of tertiary treated effluent into the San Diego River, and to promote
beneficial use of reclaimed water for recreation and landscape -irrigation. As noted earlier in this
EIR, following these actions by the District, RWQCB issued Order 92-12 which sets requirements
for use of reclaimed water for irrigation, and Order 9348 which sets requirements for discharge to
Santee Lakes and the San Diego River, up to a volume of 2.0 mgd.  The proposed project will
enable the District's objectives and the RWQCB requirements to be met.

In June 1994, Padre Dam MWD submitted to the City of Santee a completed application to modif~
the Santee WRF's Conditional Use Permit P67-129 which had originally been granted by the County
prior to Santee's incorporation. A Mitigated Negative Declaration, incorporated herein by reference,
was prepared by City staff. A hearing on the application was held by the Santee City Council on
August 10, 1994. Following this hearing, the District determined to prepare this Subsequent EIR
to address in more detail issues raised by the City and the public.






Padre Dam Water Rcciamauon PmJccL EIR                                         27

PAGE 161 Show Image
E.    Growth Inducement
The California Environmental Quality Act (CEQA) requires that environmental documents evaluate
whether a proposed project would induce direct or indirect growth of population, economic
development or housing construction. This includes projects which remove obstacles to growth by
accommodating additional population or construction, such as expansion of public service facilities
(Public Resources Code Section 21100; CEQA Guidelines Section 13212g).

Growth inducement is defined by the San~Diego Association of Governments (SANDAG, 1987) as
any action or circumstance which produces population and/or economic growth in excess of
established projections. The causes of growth typically involve a complex and varied relationship
among several factors including economic setting, employment opportunities, natural population
increase, public policies, and local environment. All of these can influence the rate and extent of
growth, although economic and employment opportunities (and to a lesser extent local birthrates) are
considered the most important factors in the San Diego Region (SANDAG, 1987).  That is,
regardless of the environmental amenities or favorable local attitudes toward growth in specific area,
significant sustained population growth will normally not occur without adequate employment
opportunities.

If it is determined that a particular project would induce growth, then the secondary effects of that
growth must also be addressed. These may include effects to resource values such as traffic, air
quality, and public services resulting from additional population and/or construction.  Because
population and/or economic growth typically produce a varied range of effects which occur
simultaneously, attempts to label growth as categorically beneficial or adverse are considered
subjective. CEQA Guidelines state (Section 14125g) that growth in any area should not be assumed
as necessarily beneficial, detrimental, or of little significance to the environment.

The proposed project would entail construction of sewage treatment plant improvements and a
reclalmed water distribution system by Padre Dam MWD for the City of Santee and certain adjacent
areas. The District presently owns 6.22 mgd of capacity in the METRO system, and is permitted
by Regional Water Quality Control Board to release 0.999 mgd of treated wastewater. The upgrade
will allow treatment and release of 2.0 mgd of treated wastewater, but will not change the District's
capacity allocation in METRO.

Although no additional sewage treatment capacity is being created at the Santee WRF, the avallability
of reclaimed water for Title 22 uses and the concomitant additional avallability of potable water will
reduce the District's dependance on imported water. Dependance on imported water has resulted
in voluntary water conservation efforts and tiered pay schedules for water during times of drought.
Dependance on imported water has not been a deterrent to development. SANDAG has recently
released Series 8 Growth Projections that have been revised downward from Series 7 projections.

50                                        Padre Dam watcr Rcciamauon Projoct ElR

PAGE 162 Show Image
While the exact rate of growth and date that build-out will be reached is not specified by SANDAG,
there is little uncertainty that the population of the metropolitan San Diego region, including Padre
Dam's service area, will continue to grow.

The project would reduce the demand for potable water by replacing its use for irrigation. Pipelines
are proposed through developed areas and are intended to accommodate planned growth in
accordance with the Santee General Plan. The proposed project would not extend public services
or access into any areas where they previously were not available.

The proposed distribution of reclaimed water is not considered growth inducing pursuant to CEQA
for the following three reasons:

1.    Water reclamation targets specific market demands rather than basic service needs. That is,
      reclaimed water has limited applications and cannot meet water needs for most types of
      development in and of itself. Specifically, this includes uses such as human consumption and
      most domestic applications (cooking, washing, bathing, etc.).  Thus, the availability of
      reclaimed effluent would not induce growth in population or housing beyond established
      projections.

2.    Proposed reclamation uses are limited predominantly to irrigation demands which are
      currently met with potable water.  In the absence of reclamation, priority demands would
      continue to be met with potable water. Specifically, proposed reclamation uses which require
      irrigation to remain solvent (such as commercial agriculture) are likely to receive a priority
      for potable water supplies if reclaimed effluent were unavailable.  The proposed use of
      reclaimed water would thus not induce additional economic development, as such uses would
      have access to other (potable) water sources if necessary. Certain irrigation uses (such as
      freeway landscaping) may become more directly dependent on reclamation, although these
      irrigation uses are considered an incidental factor in the timing and rate of growth.

3.    Viable reclamation markets require demand and cost factors to enable reclaimed water to be
      economically competitive with the use of potable water. Such market conditions are subject
      to change with a number of parameters, including seasonal or long-term climatic variation.
      Thus, reclaimed water demand and use can vary substantially, independent of local
      population growth.

The proposed use of reclaimed water could conceivably increase the supply of potable water available
for development. That is, the use of reclaimed effluent for irrigation would free up potable water
for uses such as human consumption. This would not be considered growth inducing pursuant to
CEQA, for the following reasons:

1.    The availability of additional potable water in association with the proposed project would
      not be growth inducing in and of itself. Substantial shortfalls of potable water in the San
      Diego region may occur over the next 20 years, even with significant conservation measures.
      Additional potable water associated with the proposed reclamation project is thus not expected
      to significantly offset forecasts of regional water supply needs. in addition, Padre Dam's
      proposed treatment plant and distribution system improvements are not designed to provide
      potable water in excess of established regional growth projections.  Instead, the proposed



hdr: Dam Watcr Rcciamatwn Project EiR                                               51

PAGE 163 Show Image
       project seeks to reduce Padre Dam's dependence on METRO for sewage treatment, while
       also maintaining Santee Lakes as a recreational resource for the region.

2.     The availability of additional water supplies in and of itself would not induce growth due to
       the growth management policies already in place. The City of Santee General Plan contains
       goals, objectives, and policies to direct growth to planned development areas and to manage
       and control growth within the City.  Other goals, objectives, and policies of the Santee
       General Plan limit development in areas of environmental sensitivity or where public safety
       hazards exist. Specific techniques to implement growth control measures include land use
       designations and zoning classifications to control the type and density of local development,
       requiring specific plans for development of significant new projects such as Fanita Ranch,
       and requiring development fees to ensure adequate public facilities and services.






































52                                              Padrc Dam Watcr Reciamation Project EiR

PAGE 164 Show Image
  ORANGE
  COUNW



                                                                      RIVERSIDE COUNTY

                                                                      SAN DIEGO COUNTY
          CAMP JOS~PH H.        FALLBROOK
            PENDL~1ON
            U.S.M.C.B.

                                              ·PALA                      79



                            BONSALL

                                                           76
                                                                            ¾      · WARNER SPRINGS

                              76,



         OCEANSIDE              VISTA
                                  `L8~

                                           · SANM~RCOS

             CARLSBAD  ·                                               L~-   .SANTAYSABEL
                                                                                                    78 -
                                                 · ESCONDIDO

                           `5.            &~~¼\" ~                      78'




                                                  BEPNARDO                   Santee
                   ENCINITAS                      PANCHO c~~~·P.             Corp.


                                            (i&                               Bdy.
                       DEL MAR ·                · POWAY


                                                   SANTEE



                     LAJOLLA·  (5                                           If'.';,  ij'


                 PACIFIC BEACH   ·


                                 y¼SA·E~~~i{Iff,!{~!!~f'II'                              PDMWD
                    POINT LOMA  ·



                                                                                         Service
                             CORONADO             Sa E05        .~,         (Qa











N                                                                                           Regional Map
                     110 miles                                                                  Figure 1


                                                                                   Padr ~~ ~`aI~ L~c~M,~~.~ h~~~cc ~IR

PAGE 165 Show Image
                                                          · 0


                                                          o



                                                          0

                                                               E
                                                               0
ow:o~rn-w.~vts~

























                                                            0
                                                            0
                                                            0


                                                            b
                                                            0
                                                            0
                                                            (`1


                                                            0



                                             a)
                                             0







                                                               0



                                                               0
                                                               U)

PAGE 166 Show Image
                                                                     = -
                                                                  ~



                                                                  0
                                                                       E
               oZ




               LL                           w                          V
                                           -wo                         E

z00Z           w-
               OLL
                                           U) uJ
  C                           ww
                                                     C
     p                                                   w
                                           W~'nw     ~~  0

         ~C:W:WOz                          -o~       w
                                                     C~W~  ~


                        0
                                                           z
                                                                  C
               +              oz                                  U


      *                                              Zo

                             ~=C~w                   -~
                                           Zo        ~   =0
                                                         0
                              `n
                          w                CU)       ~   -~
                I                          oo        U)
                                                     0
               U)         -~               oa
            ~~Ow~U)w
            U)WZC~
LLJo-                         *                          ow

                          ~U)9











                                                   wz~
               oZ                                        w~Z
                                     ow           WC~U)    U)
               +                      0
                   0
                                     ow
            ZZz
                   wz~Oo= Zo  w~~        -
                          -   ~=     =w~
                   IL                ~o~       Z~          z
           ~oZw~~    *                 *
          U)~ =
                                               C)         zo
                                                         ~ ww
          OU)Z ~                                       t&- 0
0             ~0'L                                     ~ o~ wz
               I~=                                 CW Z0C~ Cw~
w         Z Z                                        IL IL U)

          ILZ~~~                        Z~~~           ~Z ~wz

                                         ~IL         ZW ILU)           U
wZ~       - U)                        O:'DC~        Z w~ILU)~~6
                                                         CU)
~~~  ~~~z -~o   W+                                 ~ ~: :~ ~~     I'








                                                                       0
                                                                       Co

PAGE 167 Show Image
                                                                                                                         ~LJ





                                                                                                                0        0

                                                                                                                         E



                                                                                          ¼


                                                                _______________________________                          E
























                                         4)     ·frka~        ~                   iN




                                                                           ~      M9IA~i~~





                                   ¼`   -                                9AI~iO ViINVJ












                                                                                                                   U
                                                                                                                   cn
                                                                                                                   o     -~
                                                                                                                   7
                                                                                                                         -`n-






                                                                                                                         CL
                                                                                                                         -U-


        a                                                                             ~~L&j
                                                                                      ~L~aj~t&j~~              -         E





`t\~Lu~
                                                                                                                         CL


                                                                                                               ·         0

                                                                                                                0~       D
                                                                                                                         0
                                                                                                                        U)

PAGE 168 Show Image
               CHAPTER 2  -  SECTION 10632  -  iC


ic.  (Recycled water)  A description and quantification of the
potential uses of recycled water, including, but not limited to,
agricultural irrigation, landscape irrigation, wildlife habitat
enhancement, wetlands, industrial reuse, groundwater recharge,
and other appropriate uses, and a determination with regard to
the technical and economic feasibility of serving those needs.

In 1990, the District commissioned engineering consultants, Dudek
and Associates to develop a Water Reclamation Master Plan.  The
plan was adopted by the District's Board of Directors on January
22, 1991, Resolution 91-7.

Included in this subsection are several pages taken from the
Water Reclamation Master Plan which address reclaimed water
markets. The market survey assumed the potential 4 MGD project,
Phases I and Ii. See attached Chapter 7 from the  Water
Reclamation Master Plan.

It should be noted that since the time of the preparation of the
Water Reclamation Master Plan, the reclaimed water markets for
the Phase I Upgrade Project (2 MGD) have been refined for the
demand levels and distribution feasibility project for the high
irrigation demand season of 1997.

Additional information on the 2 MGD project is provided in the
Santee Water Reclamation Facility" brochure and the initial
Reclamation Project community newsletter, dated August 1995. See
attached.

At the completion of upgraded facilities at the District's Santee
Water Reclamation Plant, the production of reclaimed water will
increase to 2 MGD.  This will supply approximately 10% of the
daily water demands in the District.

PAGE 169 Show Image
                       Santee Water Reclamation Facility
                       PADRE DAM MUNICIPAL WATER DISTRICT














                                                        a


                         .        . -.









Water reciamation

Wastewater ~iscnarged

Irom homes ~usines3es

and industri S cllected

by the sewer system

it is processed n 3

-multi-step treatment piant

to a level suitaoi -or -    ~.. -:-~-~
irrigation ano other            -.
non-drinking purnoses.

PAGE 170 Show Image
World famous                                site three miles north of the park and     supported the project to achieve inde-      Lakes Regional Park and Campgrouna
project, 1960's                             lakes. Current facility production is one  pendence from regional wastewater           owned and operated by the District.
The Santee Water Reclamation Facility       million gallons of reclaimed water per     processing costs and create a local         Boating and fishing are popular activi
was built in 1961 by the Santee County      day (1 MGD).                               recreational facility.                      ties at the park.
Water District. The District was later         The innovative reclamation project         Two aspects of the reclamation
renamed the Padre Dam Municipal             has generated much international           project made it particularly uniQue -       State-of-the-art
Water District after a voter-approved       attention and recognition over the         the final filtration method and the use     upgrade, 1990's
merger of two existing districts in 1976.   years. The facility continues to draw      of the reclaimed water for recreational     The District is upgrading the reclama-
   The original site of the reclamation     visitors from around the world. The        purposes. The naturally occurring           tion facility to produce an additional
plant was directly south of the chain       project has been described in numer-       confined sand and gravel beds in            one million gallons of reclaimed water
of seven Santee Lakes on Carlton            ous industry articles and was the sub-     Sycamore Canyon are used for the            daily. The original activated sludge
Oaks Drive at the present site of the       ject of a book The Town that Launders      final treatment step. The one million       process will be changed to a state-of-
Distnct's Operation Center. In 1968,        its Water The local water district and     gallons of reclaimed water produced         th~art biological nutrient removal
the facility was relocated to its present   citizens of the community created and      daily fill the seven lakes at the Santee    process (Bardenpho). In addition to


                                                                                      ·       ·-·

   The process of water reclamation con       4 Fermentor                                  is recycled in the process to be re-used 10 Methanol Addition
   Sists of a series of steps. These include    The fermentor converts part of the primary in the activated sludge (Step 5).           Methanol is added to provide a food
   transport, primary clarification, treatment  sludge to a liquid high in organic acids 7 Tertiary Pump Station                       source for nitrogen removing bacteria
   with activated Sludge, Secondary clarifi-    needed by the Bardenpho process.           The effluent is then pumped to the          in tfle titter.
   cation, nutrient removal, filtration and  ~ Biological flutrient                        tertiary treatment processes.           11 Osnitrification Filter
                                                   Removal System-
   disinfection. At the conclusion of these     Bardenpho Process                        8 Alum Addition                               A deep bed sand filter removes fine
   Steps, the reclaimed water is fully treated  This process Simultaneously removes        Alum is added for the precipitation of      particles. turbidity and nitrogen from
   and suitable for a variety of non-potable    organic material, suspended solids.        phosphorous in the flocculator clarifier.   the water, leaving a clear liquid.
   (non-drinking) uses.                         nitrogen and phosphorous from the        9 Flocculator Clarifier                    12 Chlorine Contact
                                                wastewater. The Bardenpho technology       The floccutator clarifier precipitates      Chlorine is added for disinfection.
   Transport                                    is detailed on the following page.         aluminum phosphate. coagulates small        There is a minimum two-hour
      Wastewater collected from residential
      and light commercial areas in Santee is 6 Secondary Clarifier                        particles and settles the particles.        detention time to ensure the highest
      diverted to the Operations center         Secondary clarifiers separate water                                                    purification and safety standards. The
      directly South of the Santee Lakes.       from the activated sludge. This sludge                                                 effluent quality will meet the State
                                                                                                                                       Aoministrative Code Title 22 for
      Wastewater flows which are not                                                                                                   reclaimed water use set by the Dept.
      reclaimed will continue to be diverted                                                                                           of Health Services.
      to the San Diego Metropolitan            1
                                               comminuer        2                      5                         6

      Wastewater System (SDMWS). Treat-                        inIluent      Primary   Biological Nutrient       Secondary         13 Reclaimed Water
                                                               Pump          ctantier  Removal System            ciant-ier            Pump Station

      ment and ocean outfall disposal will Transport           Stahon                    .~~,, -.,.,.,                                 The pump station pressurizes the
      occur at the Pt. Loma Wastewater -       - ~.                                                                                    distribution system.
      Treatment Plant.                         -

   1  Comminuter                                                                                                                    14 To Distribution System
      This device, located at the Operations                                                                                           See map on back
      Center grinds large particles (such                                                                                           15 DechlorinaUon With
      as household incidental trash) in the                                                                                            Sulphur Dioxide
      wastewater stream.                                                                                                               One MGD will be dechlorinated before
                                                                                                                                       it is delivered to the Santee Lakes.
   2 Influent Pump Station
      The influent pump Station pumps the            ~um               Menthanni  11          12                13                 16 To Santee Lakes
      wastewater northward three miles               Addison     Addition    0enilrh~n        ~hionne         Recaimed water           The reclaimed water flows to the
      through a 24-inch force main to the                                                                                              northem~most lake, Lake 7, then
      water reclamation facility. A new odor                                                                              14           southward through the chain. Any
      control facility will be installed at the                                                          To OralOSbysLIUtknh           excess reclaimed water is discharged
      pump station.                         Terary         Roccutator                                                                  from Lake 1 into Sycamore Creek, a

   3 Primary Clarifier                       Pump Stalion
                                                                                        15                                                                       The

                                                                                         Oechionnabon                                  tributary to the San Diego River.
      Particles in the wastewafer are removed
                                                                                         wilk Sulphur                                  District has a permit to discharge
      through primary clarifiers. These areas                                                                                          2 MGD into the river. See River
                                                                                                               16                      Monitoring next page
      are covered and the odor is scrubbed                                                                     To santee Lakes
      by the aeration tanks.

PAGE 171 Show Image
maintaining the Santee Lakes. the                                              Distributior system
additional reclaimed water will be used        ~           The facility is     Reclaimed water will be distributed for landscape irrigation to 120 use sires in
oy 120 industrial, governmental and                  -~    currently more      Santee. The distribution system will contain 25 miles of pipeline 10 miles are a-
ommercial customers with large               L'            than one-half mile  ready installed. See map on back
rrigation needs in the city of Santee.                     from the nearest      Annual irrigation demands for            In order ~o
  The upgrade project will provide a                       residence. Future   the system are 275 million gal-                    `V
trought-proof supply of water for out-                     development         Ions. The distribution system is        Conserve  ater...   ·.
toor irrigation that will be available  could situate homes within closer      designed to deliver two million            -     ~ I
turing times of water use restrictions~ proximity. The upgraded facility will  gallons per day and will be capable
                                                                                                                    DoNOTDRINK                NO TOME
~eclaimed water stretches the existing    have odor control equipment to       of carrying additional Ilows with                              EL AGUA
                                                                                                                         nANDS
mported potable water supply and          remove odors from the primary sludg~ future expansions. An existing 1.5 AX~~F7~RACnNG          MANOs DE~uPAAUE
 educes the amount of wastewater          termentation and any other odor-         million gallon above-ground water
 hat must be treated and disposed         producing areas. The grounds will be     storage tank will be convened to hold reclaimed water for operational (daily) storage~
 fin the ocean~                           attractively landscaped and will include   All reclaimed and potable water mains are kept separate and identified for easy
                                          trees to screen views from the hills to  recognition by maintenance crews of various utilities. All distribution facilities and
               Construction for           the east and west.                       irrigation equipment are color-coded purple. Each site utilizing reclaimed water
               the plant upgrade             All hazardous chemicals are stored  must post signs notifying the public of its use~

nd distribution system is scheduled to    in contained areas to ensure the utmost
iegin in late summer 1995. The project    in safety. Spills, while highly unlikely,        .  0                 -         -
lans to deliver reclaimed water to        would be controlled and chemicals not
ustomers by the high irrigation de-       released to the environment~                  Bardenpho process
~and months of summer 1997.                                                             Bardenpho (trade name), is a biological nutrient removal system. which
                                                                                        will modify the activated sludge process currently used at the reclama-
aborat  `services                         P~ocess control                               tion facility. High levels of suspended solids, organic material, nitrogen

                - .    -~     -~--        Computer technology will be used to           and phosphorous removal are achieved without the use ol chemicals.
                              -           control individual processes and to log       The five stages of the Bardenpho process are:
               -            -             data for monitoring and reporting             · Anaernbicstage
                         ,~ . ~           purposes. Electronic controllers will be       Activated sludge is mixed with the clarified influent. This produces a
                              -           linked to a master computer terminal           condition which allows large quantities of phosphorous to be remov-
                                           here         can monitor and con-             ed from the w~water in later stages~ This step occurs without oxygen~

                              -           sonnel can also use portable notebook          Mixed liquor containing nitrates from the third stage is recycled to this
                                          computers from remote sites for the            stage. It is mixed with the flow from the first stage without aeration~
                                          same purpose. The system will be               Bacteria reduces the nitrates to gaseous nitrogen while providing
                                          linked to the District's SCADA system          oxygen for organic removal. Two4hirds of the influent nitrogen is

 re on-site laboratory provides basic     for 24-hour monitoring and remote            removed from the water in this stage.
 rysical, chemical and bacteriological    control, when necessary.                      · Oxic stage
                                                                                         Areation provides oxygen so that bacteria oxidize biochemical oxygen
 3ting for operation of the plant as well River monitoring                               demand (BOD) and ammonia. BOD is converted to new cell mass,
 for monitoring receiving waste-          The effluent standards for water dis-          carbon dioxide and water. Some mixed liquor is recycled back to the
 flers. The lab also performs             charged from the reclamation plant are         first anoxic stage. Excess phosphorous is consumed by the organ-
 cteriological tests on the potable       based on the ecological requirements           isms in this stage.
 iter delivered by the District. The      of the San Diego River and the Santee         0 Second anoxic stage
 oratory is certified by the State of     Lakes. To maintain the river quality and       Nitrate not consumed in the first anoxic stage is introduced to the
 lifornia and U.S. Environmental          habitat, the District must meet strict         second anoxic stage. In this stage it is reduced in the absence of
 )tection Agency. Testing ensures the     standards for nitrogen and phospho-            oxygen to nitrogen gas, again providing a source ot oxygen for
 hest standards of safety and             rous discharged to the stream All              organic removal. This produces a low effluent nitrate concentration.
 iability for all reclaimed water         discharge is fully dechlorinated. The         0 Re-ration stage
 ivered to the Santee Lakes and           District regularly monitors the river and      The sludge is subjected to reaeration and this introduces additional
 tribution system. The reclaimed          will perform any needed management             oxygen to the mixed liquor. This ensures that the sludge will remain
 ter is safe for all human contact;       activities to correct detrimental situa-       aerobic and thus retain phosphorous.
 lking is not approved.                   tions, should they occur.

PAGE 172 Show Image
       -            I      - I -                           :



               WATER
               RECLAMATION
               FACIUTY


          SANTEE



             ·                                                                 Santee  ~ooC~v1~~
 LEGEND

 PROPOSED

 ExIS~NO






          --`,                                                                         PALS  - .~~~
                               ~I~                         0                                __
            e ·.



               - vw~Ow         ENTER    ~ -     SI
                  CARL~ 5ay0~~WP~e - -                                                  0 R-e
                -                                                                      0




               - ~    ~~~~CT


 PANITA       ~                                                                       · . .
 TERRACE      ~
 RESERVOIR 00T ~      -~-- - -                                                           KENNEY
                                                                                       Se .                      ·


        Santee Lakes Regional                      The 190-acre park is an important    $20 million. Low interest loans for
        Park & Campground                       environmental resource for an area with over half this amount have been set
        The Padre Dam Municipal Water Dis-      a semi-arid climate. Lush landscaping   aside by the State of California for this

        ed the Santee Lakes Regional Park &     varieties of birds and wildlife. The    District's regional water wholesalers
        trict has continually owned and operat- provides a secure habitat for many      project. Financial incentives from the
        Campground since the recreational       reclaimed water is not subject to water assist in funding the project. Local
                                          .0 · S. S
        facility opened to the public in 1961.  use restrictions during droughts and    production of reclaimed water directly
           Boating, fishing and overnight       can provide year-round recreational     offsets the need for imported waten
        camping are popular activities at the   opportunities for the community.           Reclaimed water rates have been set
        park. The lakes are stocked with a                                              at 85 per cenf of the Standard I potable
        variety of fish. Annual park attendance Project costs/rates                     water rate. Customers will be billed on
        is 290,000 for day-use activities and   The cost of the upgraded facility and   the same schedule as the Districts pot-
        90.000 for campground occupancy.        distribution system is approximately    able water customers. 1···i~·




                          ____                                                                                   .1


                                                                                                               I;.,














            ___ --                                                                     -----  -~
          -- - -                                                                                                 `I I,

PAGE 173 Show Image
)% )1{~...~~~.;......)¼7~D'~~ PADRE DAM ~dTER
                      .fT.  -                                                                   0 J E C T




                                                                                        A Leaner in Waler

            HOMES IN                                                                       Rec~amarinn Since 1961
            SANTEE
                                       PADPE DAM   MUNiCiPAL  ~ATE~   OiSTPiCT

                         AUGUST 1995



                         Reclamation project                                              Santee Lakes Regional
                         will benefit Santee                                              Park and Campground

  WATER                  community                                                      The Santee Lakes Regional Park and Camp-
                             A new source of irrigation water is coming       ground was built as part of the complete water rec-
  RECLAMATION            to Santee. A large-scale reclamation project           lamation project. The park is owned and operated



  Wastewater             of the Padre Dam Municipal Water District is                     bythe Padre Dam Municloal Water Districtand first
                         now underway.                                                    opened to the public in 1961. District customers


  discharged                 The District is increasing the production of                 are eligible for discounted entrance fees.
                         reclaimed water at its Santee Water Reclamation                      The project will not affect the reclaimed water

  from homes,            Plant. The increase in production from one to two                supply to the Santee Lakes. One million gallons of
                         million gallons of reclaimed water per day will en-              reclaimed water will continue to be used to till the
 businesses
                         ablethe Districttosell~reclaimedwatertothecom                    lakes and irrigate the park.


  and industry           munity for irrigation purposes.                               Reclaimed water provioes a lush landscaoe
                             The reclamation facility was built in 1961 by within a semi-arid region for many varieties of birds


  is collected           the District and has received international aften-               and animals. The lakes are a popular fishing spot
                         tion for its innovative use of reclaimed wastewater              and are stocked year-round. For more park infor-
  by the sewer           for recreational purposes. The plant is located about            mation. please call (619  JS-2482.

  system It is           three miles north of the Santee Lakes.
                             Reclaimed water has never been used for

  processed in the public drinking supply. This is prohibited by                          Project newsletter will
  a multi-step  It is distributed through a separate dual piping                          be mailed periodically

 treatment                   District customers and the Santee corn-                      during construction
                         munity will benefit from the new project in                  This newsletter is  scec;al public informa-
 plant to a              several ways -                                      tion effort of the Pacre Dam t\(iunicipal Water Dis-

 level suitable      .       More wastewater will be turned into reclaimed                trict. Publication will ccn:inue periodically until the
                             water instead of being treated and disposed                  project is completed n 1997.

  for irrigation             of in the ocean.                                                 We want our Santee customers and~members
                                                                                          of the adjoining communities to know as much as

 and other                   The use of reclaimed water ;s less restrictive               possibie about this imoortant prolect. Details about
                             than potable drinking water during droughts                  the construction progress at the plant will be in-
  non-drinking               or cut-backs.                               :                cluded in every issue. The newsletter will also give
                            · Investments in local landscaping and vegeta-                the upcoming schedule of work in city streets to
  purposes.                  tion can be maintaineo ouring water shortages     :          install the reclaimed water mains. Additional cop-
                            · The need to purchase costly imported water                  ies of the newsletter are available at no charge.
                             for irrigation will oe decreased.                                Please see the project information telephone

                                                  See Project on bacK                     numbers on the back.


RECtAMATlO i~












                                                                REUSE IN THE COMMIJNIT

PAGE 174 Show Image
Seeing purple?                                           Special delivery through                               PADRE £)AM
Reclaimed water in use                                   a dual pipeline system                                WATE$R~E~jL~AcM~ATtON
    As you pass along the streets of S~~tee you              A 25-mile distribution system will deliver re-
may notice purple-colored irrigation equipment and       claimed water for landscape irrigation to 120 sites
sprinkler heads in landscaped areas surrounding          in Santee. The major reclaimed water distribution         Mailing Address
                                                                                                                   PD. Box 719003
newly-constructed buildings. These specially col-        mains will be located in Carlton Hills Boulevard,      Santee. CA 92072-9003

ored fixtures mark areas where reclaimed water           Mast Boulevard. Magnolia Avenue, Fanita Parkway.     This newsletter is published
will be in use.                                          Mission Gorge Road and Prospect Avenue in            ty the Padre Dam Municipal
    All reclaimed water distribution facilities, such    Santee. The project will require the installation of Water District tor its waste-
as valve covers and meter boxes are also colored         15 miles of new pipeline, in addition to 10 miles of water
purple to distinguish them from the potable water        reclaimed water mains already in place.         tomers  rvice (sewer) cus-
                                                                                                                and the community.

system. To further notify the public, signs are
posted at each location,                                 Construction schedule                                This publication will continue
                                                                                                              oeriodically  durinO  the

    All reclaimed water customers currently re-              Construction work will begin at the plant in     construction work at the
ceive potable water for irrigation. Water service will   September. Residents in the immediate vicinity of    plant and the installation ot
be switched over to reclaimed water when the             the plant will receive specific information on the   the reclaimed water distribu-
project construction is completed.                       truck route for hauling construction materials and   lion system.
    The purple-colored fixtures can be easily seen       hours for work crews.                                    GENERAL PROJECT
in various locations including the street medians            Construction of the distribution system has             INFORMATION
and planting beds at K-Mart, Smith's Food and            been carefully coordinated with the City of Santee   0irectoHr~orOtlwdaBue1rleRYeRiEmation
Drugs, Wal-Mart and the Santee Promenade in the          to accommodate traffic flow concerns and to pre-         16191258-4655
Santee Town Center.                                      vent inconveniences to the community.                CONSTRUCTION INFORMATION
                                                             Entrances to homes and businesses will not          DISTRiBUTION SYSTEM

Project ... Continued from front                         be blocked. To ease disruption on city streets. work    Ro1andANR1ssL~N1Tr. PE.
                                                         crews are scheduled to install 200-300 feet of pipe     Director ot Engineering
    Forthe past several months. District staff have      each day. One lane of traffic will remain open on         and Planning
Ibeen meeting with non-residential water custom-         the side of the street where construction is occur-
                                                                                                                   16191258-4635
ers who will be receiving the reclaimed water. These     ring. Traffic flow in the opposite direction will not
customers have large annual irrigation needs and         b                                                       Boar 0  Directors
are Currently receiving potable water for irrigation.    e affected.
                                                            Pipeline work in major intersections will be         Douglas S. Wilson
Parks. street medians. school playIng fields and                                                          !         Owision 1. Presideni
                                                    done at night and daytime work will occur between
highway landscaping are typical locations where          8:30 a.m. and 3:30 p.m., avoiding the heavy com-        Francis C. Daugherr.'
the reclaimed water will be used.                                                                               Division 2. Vice-president
    The changes at the plant will upgrade the treat-     mute times. The construction work has been sched-
ment processes as well as increase the production.       uled to avoid any environmental concerns and            Andrew J. Menshex
                                                                                                                     Division 3

Structural changes to the buildings Will be minor.       will not occur in front of schools when classes are       Wilma R. Carroll
                                                         tn session.                                                 Division 4
    Various sources of financing are being used
by the District to pay for the $20 million project.                                                                Dan McMillan
Customers' water and sewer rates are not expected        Next issue:                                             Owision 5. Treasurer
to change to fund the project. Reclaimed water is        Map of the reclaimed water distribution
priced at 850/n of the Standard I potable rate.        I system and initial construction schedule



PADFtE DAM                                                                                                       ~IsRRp{P$~)~$$$



  E                              PR a j E CT  P.O. Box 7190C3. Santee. CA 92072-9003                               SAN OlEGO. CA
                                                                                                                   PERMIT NO 1869




















      Printed ~n reoVoled paper.

PAGE 175 Show Image
                                   Water Reclamation ~ster Plan



                               CHAPTER 7

                        RECLAIMED WATER MARKETS



7.1  MARKET RESEARCH

Information on potential reclaimed water markets was obtained through a variety of
resources. The San Diego River Basin Reclaimed Water Planning and Development
Study (SDRB Study) by Luke-Dudek Civil Engineers, Inc. and Black & Veatch Engineers
Architects provided an initial list of potential reclaimed water markets for the areas of
Lakeside, Crest, and the City of Santee. Additional markets within the study area were
identified through meetings and telephone interviews with several agencies, including the
Cities of Santee and El Cajon Planning Departments, and the San Diego County
Planning and Land Use Department, San Diego County Parks and Recreation
Department, and the Padre Dam Municipal Water District (PDMWD).  Customers with
relatively large water demands were identified from PDMWD water records. The school
districts within the study area were also contacted. Additional resources used to identify
and evaluate potential reclaimed water markets include the Lakeside Community Plan,
Alpine Community Plan, Crest/Dehesa/Harbison Canyon/Granite Hills Subregional
Plan, the City of Santee General Plan and Land Use Plan, and the City of El Cajon
General Plan.

A list of potential reclaimed water users was prepared from the above sources. An
attempt was made to contact each potential user by telephone. Information confirmed
and compiled from telephone calls and site visits includes the following: the type of use,
whether that use is seasonal or uniform, the quantity of water used annually and
seasonally, the quality of water required for that use, the pressure requirements to serve
that market, the owner's interest in use of reclaimed water, and the future plans for water
use at that location. It should be noted that the limitation set for the market research was
a minimum of 5 irrigable acres (or equivalent potential water use); however, smaller
markets that were identified in the course of the research were included in this study.

7.2  DESCRIPTION OF POTENTIAL MARKETS

For the purposes of this study, the term "reclaimed water market" was used to identify a
location where reclaimed water could be used to replace the use or future use of
municipal (potable) water. Reclaimed water can also be used to replace the use of
groundwater or improve the quality of the groundwater that is being used, especially for
irrigation purposes. Enhancement of riparian habitats is also a productive use of
reclaimed water according to the Regional Water Quality Control Board. These uses
were considered potential "reclaimed water markets" in this study.




                                  7-1

PAGE 176 Show Image
The reclaimed water markets were divided into five main categories: irrigation uses,
industrial uses, commercial building uses, recreational uses, and ecological
enhancement. The irrigation markets were~subdivided into the following groups:
agricultural and nurseries, golf courses/country clubs, parks, schools, medians/right.of.
ways (R.O.W.)/interchanges, residential developments including mixed uses such as
commercial center, and commercial/industrial developments. Specific markets are
shown on Figure 7-1. The markets in Figure 7-1 are numbered from west to east and
north to south. Table 7-1 summarizes the potential reclaimed water uses in the PDMWD.
Table 7-I lists the annual water use in acre-feet (AF) and the peak daily water use in
gallons per day (gpd). The annual water use is totaled at the bottom of Table 7-1. Peak
daily reclaimed water use in 1995 is estimated to be approximately 8.1 million gallons per
day (MGD) with an average annual use of 4,360 acre-feet per year (AF/YR) and
increasing to approximately 16.8 MGD peak daily use and 8,865 AF/YR for ultimate
buildout.

An expanded version of Table 7-1 is included in Appendix D. Appendix D shows the
estimated demand for 1995, 2000, and for the ultimate buildout.

For irrigation markets, the number of total acres, if known, and irrigable acres is noted.
The use factor, or application rate in the expanded table applies only to irrigated areas
and refers to the number of acre4eet per acre per year (AF/AC/YR) that is used at that
location. The criteria used to develop the use factor are described in detail in sections
that follow. Appendix D also lists the water district, planning area, hydrographic subarea
(HSA), approximate distance from the Santee Water Reclamation Facility (WRF), and the
source from which the information was obtained. Appendix D also contains a list of
markets sorted and subtotaled by water district, planning area, and HSA.

7.2.1Irrigation Water Demands

Irrigation uses of reclaimed water may include~the irrigation of pastures, crops,
nurseries, golf courses, cemeteries parks, campuses, and residential, commercial, and
freeway landscaping. Both public and private facilities are included in this study as
potential reclaimed water markets.

7.2.1.1   Variations in Irrigation Demands

7.2.1.1.1 Seasonal Demands

Irrigation water demands are non-uniform, varying seasonally from the effects of wet and
dry weather periods. The seasonal nature of crops also effects the water demands of
agricultural irrigation. Peak applications are applied during the dry summer months, and
low applications occur during the wet winter months.





                                 7-2

PAGE 177 Show Image
Individual irrigation user water consumption data and recent seasonal irrigation water
use estimates devetoped by the San Diego County Water Authority (SDCWA) were used
to develop a composite seasonal water demand curve. Comparisons with previous
seasonal demand curves used in past water reclamation studies for several San Diego
County communities were also made. Table 7-2 presents the seasonal demand data
used in this report, in which the demand in August is 2.12 times the average month
demand.

                                 Table 7-2

              Seasonal Variation in Irrigation Demand Values

                                                         Ratio of Peak Monthly
                               Percent of                Use Rate to Average
Month                      Total Annual Demand            Monthly Use Rate


January                           2.5                         0.29
February                          3.0                         0.39
March                             4.5                         0.53
April                             5.5                         0.67
May                               7.0                         0.82
June                             10.0                         1.22
July                             17.5                         2.06
August                           18.0                         2.12
September                        12.5                         1.52
October                           9.0                         1.06
November                          6.0                         0.73
December                          4.5                         0.53



The precise annual irrigation demand pattern will vary slightly from location to location
depending on climate, soil conditions, method of application, type of vegetation, etc.
The changes due to seasonal demand, however, will generally follow the pattern shown
in Table 7-2.

7.2.1.1.2  Irrigation Application Rates

The amount of water required for irrigation is dependent on the type of vegetation, soil
type and condition, hours of daylight, temperature, topographic and geologic conditions,
and the method of irrigation water application. The net irrigation water required over a
specified period of time defined as the depth of water needed to meet the water loss
through evapotranspiration, leaching, seed germination, climate control, frost protection,
and fertilizer application. In San Diego County, rainfall provides only a fraction of the net
irrigation water requirement for most plants. Irrigation systems are designed to apply
enough water to supplement the amount of water provided by rainfall, and satisfy the net
irrigation requirement.




                                    7-9

PAGE 178 Show Image
Methods for determining irrigation application rates are based on the reference
evapotranspiration rate, the rate of precipitation, and efficiency factors associated with
the application method, and the type of crop and crop coefficients. Evapotranspiration
rates are dependent on the type of vegetation and climate. Precipitation rates in the
study area of this report average 12 inches per year near the coast, and 14 inches per
year inland. Application efficiencies for irrigation distribution systems typically range
from 70 to 80 percent.

Precipitation rates in the study area of this report average about 12 to 14 inches per
year. Application efficiencies for irrigation distribution systems typically range from 70 to
80 percent.

The SDCWA estimates the total water requirement for vegetation in coastal San Diego
County to range from 30 to 45 inches per year. Of this amount approximately 12 inches
is provided'by rainfall. Therefore, irrigation must provide 18 to 33 inches of water to
meet this requirement.

For this report, an average applied water irrigation demand of 30 inches per year (2.5
AF/AC/YR) was used for landscape irrigation markets unless more specific data was
available from the user or water records. The applied water irrigation rates for each
market is listed in the expanded table presented in Appendix D.

7.2.1.2    Agricultural and Nursery Irrigation

Three areas of agricultural production are included as potential markets for reclaimed
water use: the 560 acre avocado grove of Rios Canyon Ranch, 28 acres of avocado
production along La Cresta Road, and approximate 600 acres of land designated as
agriculture preserve located in the Lakeside Community Plan. It was estimated that 25
percent of the 600 acres have the potential to use reclaimed water.

As presented in Chapter 5, Table 5.7 lists the TDS and chloride tolerances of avocados
as 800 mg/I, and 100 mg/I, respectively. Recent records indicate the Santee WRF
effluent chloride levels exceed 200 mg/I. As discussed in Chapter 6, the chloride level of
future reclaimed water is not likely to vary significantly from the current quality unless
protective measures are taken. Blending this quality of reclaimed water with the quality
of potable water presented in Chapter 3 at a rate of 75 percent potable water and 25
percent reclaimed water, achieves a quality of irrigation water below the tolerances of
avocados. Therefore, a rate of 0.625 AF/AC/YR was used for the two avocado groves.

Three large nurseries were identified in the study which include the Lakeside Pinery,
Rancho Johoba Nursery, and Colorspot El Cajon. The 16 acre Lakeside Pinery is
expected to be developed for commercial/industrial use within 5 to 7 years.





                                 7-10

PAGE 179 Show Image
7.2.1.3    Golf Course Irrigation


Golf courses provide a practical market for reclaimed water due to their large irrigation
demands. Reclaimed water is typically used to irrigate golf course fairways and roughs.
Greens and tees are sometimes maintained with potable water because of the sensitivity
of the grasses and the desire to keep these areas in top condition. Golf course
superintendents are concerned with the quality of the reclaimed water, its impact on golf
course turf, and the cost of reclaimed water. The Golf Course Water Conservation
Group was formed in San Diego County to address the issue of water conservation at
golf courses in a potential drought situation. The group consists of golf course
managers, develdpers1 irrigation system manufacturers and vendors, and others
involved in the local golf course industry. The group intends to be involved with the
development of reclaimed water as a resource and to represent the needs of the golf
course industry.

The Carlton Oaks and Willowbrook Country Clubs maintain two golf courses within the
study area. Currently, storm runoff collected from the San Diego River is used to irrigate
the Carlton Oaks Golf Course  Due to the current and past drought conditions
personn~l of the Carlton Oaks Golf Course will be evaluating their water demands
sometime in August. At that time they may consider options such as drilling a well.
Although the Carlton Oaks Golf Course Superintendent describes the quality of the
irrigation water as "not great", he sees no benefit to the golf course to purchase
reclaimed water. Therefore1 reclaimed water service is not proposed to the Carlton Oaks
Golf Course in this Master Plan. The Willowbrook Country Club currently uses well water
for irrigation. Personnel at the Willowbrook Country Club do not see an immediate need
for reclaimed water but do feel that reclaimed water may be required in the future since
the future quality of the well water is uncertain.

Three additional golf courses in the planning stages were also identified. Golf courses
are planned for the Fanita Ranch, Alpine, and High Meadow Ranch developments. The
Fanita Ranch Golf Course will be about 175 acres; however, since it is likely that much of
the golf course will remain in a natural state with no irrigation and since no details are
available, it was assumed that 60 percent of the 175 acres will be irrigated. An 80-90
acre golf course is planned for the High Meadow Ranch development. According to the
developer, the golf course is designed for reclaimed water use when it becomes
available. On-site treatment and reuse of wastewater as an irrigation supply for the golf
course is being planned for the Alpine development, therefore, this golf course will not be
included in the service area..

As an imported factor in the system planning presented in Chapter 8, each golf course
has, or will have, on-site storage; therefore, reclaimed water can be served to each golf
course over a 24 hour period.





                                 7-11

PAGE 180 Show Image
7.2.1.4   Freeway and Median Landscape Irrigation

Water use by the California Department of Transportation (CALTRANS) for irrigation of
landscape along freeways within San Diego County offers another potential market for
reclaimed water. Areas of landscaping along freeways include medians, right~of~ways,
and interchanges. Interstates 8 and 67, proposed Route 125, and the planned extension
of Route 52 present opportunities for reclaimed water use. Not only are these routes
large potential markets, but a recent amendment (September 1989) to Senate Bill 488
has mandated that CALTRANS give pipeline access along its freeway corridors to
reclamation entities with potential customers downline. Access will generally be at the
outside edges of freeway R.O.W., but occasion may arise when reclaimed water
pipelines will run down the center of the freeway corridor.

The City of Santee irrigates and maintains several landscaped medians of major street
such as Mast Boulevard, Carlton Hills Boulevard, Mission Gorge Road, and Town Center
Parkway. Although these areas are small, they can be easily irrigated with reclaimed
water if they are near a larger market or if a distribution pipeline runs within the roadway.

7.2.1.5   Parks and School Irrigation

Another significant market for reclaimed water is the irrigation of the many city and
county parks within the study area. The Santee Lakes Regional Park and Campground
currently uses Santee WRF effluent to partially meet its irrigation demand as well as for
lake replenishment which is discussed under Section 7.2.4 Recreational Use. The City of
Santee maintains several smaller parks throughout the City and has plans to irrigate
more of Mast Park and a new 46 acre park called Sports Area Park. The Undo Lake, El
Monte, and Flinn Spring County Parks have la~rge irrigation demands. Cactus County
Park will have about 5 acres irrigated in the future and two new County parks located off
Harbison Canyon Road and Tavern Road are proposed. Additional parks within the
County will be designated within future residential developments. The City of San Diego
has developed a master plan for the Mission Trails Regional Park. Although the park is
outside the PDMWD boundary, a portion of proposed activity areas is included as a
potential market.

Reclaimed water can also be used to irrigate school yards. Several school districts are
represented in the study area including the Santee, Lakeside Union, Grossmont Union
High, Alpine Union, and the Cajon Valley Union School Districts. The Grossmont
College is also located within the study area. Like the roadway medians, individual
schools have only small potential irrigation demands, but are easily identified and can be
included in the service area if near a larger market or distribution pipeline.

7.2.1.6   Residential Development Irrigation

Landscape irrigation within residential developments is a potential market for reclaimed
water in the developing areas. Reclaimed water can be used to irrigate common areas


                                7-12

PAGE 181 Show Image
in residential neighborhoods. Another beneficial use of reclaimed water would be to
irrigate fire breaks behind developments that border canyons, because brush-laden
slopes present a major fire hazard. Cut and fill slopes, development entrances,
neighborhood parks and schools, and landscaped medians within developments are
also potential use areas. By researching water records and landscape plans for
residential developments, it was found that these irrigated areas make up anywhere from
5 to 30 percent of the total acreage, with the majority falling in the range of 5 to 15
percent.

The best opportunity for this type of market are those developments in the planning or
conceptual stages. Reclaimed water facilities can be readily incorporated into these
future developments. For this study, it was assumed that no retrofifting of existing
residential developments would occur unless water records showed large uses for a
specific development. Developments that are currently under construction were
considered existing. Several developments are in the planning stages. Although
tentative maps are being processed, no specific irrigation or landscape plans were
available at the planning departments. For these areas, it was estimated that 10 percent
of the total acreage would be irrigated by 2000.

For the large undeveloped areas designated as residential use, it was assumed that 10
percent of the area that had slopes less than 25 percent had the potential to use
reclaimed water. Areas with slopes greater than 25 percent were considered
undevelopable. The undeveloped areas were divided into smaller areas according to
geographical features, water districts, planning area~s, and HSAs to facilitate sorting of
these markets in separate categories. The irrigation demand of these areas were
estimated for the ultimate reclamation system.

It should be noted that the City of Santee requires frontyard landscaping within
residential areas. The requirements include planting both a 5 gallon and a 15 gallon tree
specimen and installing an irrigation system. According to the City of Santee Planning
Department, it may be difficult to establish a frontyard maintenance district within single
family residential areas, unless a home owners association (HOA) already exists. The
Las Virgenes Municipal Water District (LVMWD) distributes reclaimed water to HOAs of
both multi-family and single family residences including aftached and detached units.
LVMWD customers currently using potable water for frontyard irrigation will have the
option to convert to reclaimed water when it is made available to them; however, if their
system is not converted, they will be purchasing potable water at 150 percent of the
current rate. According to the San Diego County Department of Health Services, the use
of reclaimed water for frontyard irrigation would be considered on a case-by-case basis
for each proposed project and would depend on several factors. These factors include
reclaimed water quality and the potential of cross connections by homeowners.
Although this use is potential, it was not considered a probable reclaimed market in this
study for purposes of estimating a firm irrigation demand. This use should be
reevaluated when the Master Plan is updated.



                                 7-13

PAGE 182 Show Image
7.2.1.7    Commercial/Industrial Development Irrigation

The potential reclaimed water markets categorized as COmmercial/industrial
developments include the Santee Town Center, Upper San Diego River Improvement
Project (USDRIP), Edgmore Senior Center/Hospital, Home of Guiding Hands, and the
commercial/industrial parks around Gillespie Field. The Santee Town Center
encompasses 706 acres of primarily undeveloped land planned for a variety of uses.
The large areas of parks, and landscaped medians and parkways provide a potential
reclaimed market demand within the Town Center. The Lakeside Community Plan
designates the USDRlP area for industrial uses with a small amount of commercial use.
Based on the landuse of the proposed four alternatives for the USDRIP area, it was
estimated that 50 acres could be considered a potential reclaimed water market for the
ultimate project. A short term irrigation demand that could be served with reclaimed
water is the revegetation that is planned for the USDRlP area.

7.2.2Industrial Uses

Industrial use of reclaimed water remains an undeveloped market in San Diego County.
However, this market provides a use for reclaimed water that does not vary seasonally
and therefore is a good candidate for reclaimed water use. Reclaimed water use for
industrial processes will however depend on the water quality needs of the industry.
Three potential industrial markets were identified which include Woodward Sand and
Gravel, Nelson Sloan Sand Plant, and Precast Concrete. Sand and gravel quarrying
operations use a closed-loop washwater system with a water make-up requirement.
Reclaimed water could be used by these companies in aggregate-washing operations,
batch concrete mixing, and dust control.

It is expected that the majority of the development planned for the industrial center
located in El Cajon near Gillespie Field will be relatively dry" industries which would not
require large amounts of water.

7.2.3Indoor Commercial Building Use

Relatively new potential markets for reclaimed water are the numerous existing or
proposed commercial buildings within the study area. These buildings, if dual plumbed
could utilize reclaimed water. It has been estimated by the Irvine Ranch Water District
(lRWD) that the toilets and urinals in a commercial building account for approximately 60
to 80 percent of the building's total daily water consumption. If dual water systems were
utilized, the reclaimed water for plumbing could be dyed (blue) to distinguish it from
potable Water. Also, on-going monitoring of water pressure and checks for cross-
connections would be required.

To estimate the potential reclaimed water demands for indoor commercial building use
for undeveloped areas, the following factors were used:



                                7-14

PAGE 183 Show Image
·    Area of structures:
           Commercial development: 15,000 square feet per acre (SF/AC) (39%)
           Industrial development: 17,000 SF/AC (40%)

·    Equivalent dwelling units (ED U)
           1,800 SF of office and manufacturing structure = 1 EDU
           5,000 SF of warehouse structures = 1 EDU

·    Type of structures:
           Commercial development = 50% office and manufacturing structure and
           50% warehouse  structures
           Industrial development = 100% warehouse structures

·    Total water use:
           250 gallon per day (GPD)

·    Potential reclaimed water use:
           60% of total water use
           Annual use based on 6 days per week

Neither the California Department of Health Services nor the San Diego County
Department of Health Services has approved the use of reclaimed water for indoor
commercial building use due to the many unanswered questions and potential of cross
connections. However, the use of reclaimed water within three buildings has been
approved on an experimental basis in the lRWD. The term of the experiment has not
been defined since potential problems may not appear for several years. Although not
considered a market at this time, the quantities presented in this study were estimated to
determine the magnitude of this use if it is approved in the future.

7.2.4Recreational Uses

As previously discussed, up to 1.0 MGD of effluent from the Santee WRF is discharged
to the oxidations ponds, and about 0.4 MGD flows by gravity eventually to the lakes at
the Santee Lakes Regional Park and Campgrounds. The lakes provide visitors
recreations opportunities including fishing and boating. The goal of the PDMWD is to
increase flow through the lakes which will result in better water quality by mixing and
flushing actions. PDMWD desires to discharge 2.0 MGD of reclaimed water to the lakes.
The balance of reclaimed water from the Santee WRF would be distributed to other
markets~as would the intercepted overflow of the lakes. The actual "recreational use" of
the reclaimed water would be to replenish the lakes to make up water lost due to
evaporation, consumptive use by plants along the perimeter of the lakes, and seepage.
Evaporation losses can be estimated by correlating pan evaporation data provided by
PDMWD and the surface area of the lakes; however, other losses are not as easily
estimated. Based on evaporation data for three years, a pan coefficient factor of 0.77,
and 67.2 acres of surface area, the estimated evaporation losses are 296 AF/YR or a


                                 7~15

PAGE 184 Show Image
0.26 MGD annual average with a peak day loss of 0.43 MGD. To account for other
losses, it was assumed, as directed by PDMWD, that the lakes would have a total peak
day demand of 0.5 MGD. Like irrigation demands, these losses vary seasonally
according to climatic conditions. Evaporation losses in January and December are
about 3 percent of the annual loss as compared to 13 percent of the total losses
occurring during each of the three summer months.

7.2.5Ecological/Aesthetical Uses

Although not considered a direct potential reclaimed water market for this study, stream
enhancement and groundwater recharge are discussed here as a possible use of
reclaimed water.

7.2.5.1    Stream Enhancement

The portion of the San Diego River from the Santee Lakes to the ocean is approximately
17 miles long. Within this distance the river contains lacustrine, riparian, and estuarine
environments. Of particular concern are the lacustrine and estuarine habitat. According
to a Draft report on Stream Enhancement Potential, 1988 through 2015, prepared by the
Regional Board in February of 1988, reduced water movement in the ponded areas or
lacustrine environment contributes to extended water detention times, vertical
stratification, and potential for substantial nutrient cycling. In a riparian environment algal
growth can be continuously exported from the system, however in a lacustrine
environment, algae may settle out and become incorporated into the bottom sediments,
providing an auxiliary source of nutrients for algal growth in subsequent years. Provided,
however, that there is adequate nutrient removal and significant flow volume, the
Regional Board believes that reclaimed water discharges can~be expected to have a
positive effect on most lacustrine environments.

Similarly, estuarine habitats, such as that at the mouth of the San Diego River, are also
sensitive to nutrient loadings. Another concern is the effect on the saline conditions in
this habitat if a uniform, continuous freshwater flow is discharged through the estuary.
The Regional Board maintains that through effective management of the volume, timing
and location of the increased dry-season stream flows, a coastal wetland can benefit
from improved water circulation, and increased frequency and extent of tidal exchange,
a reduction of hypersaline conditions, and the creation of true estuarine conditions.
Small stream flows could be utilized to enhance both the germination and growth of
particular marsh vegetation, however large flows may have to be diverted.

In general, the Regional Board believes that stream discharge to the San Diego River has
great potential for both promoting the use of reclaimed water and in enhancing a
valuable riparian habitat. The Regional Board has reviewed the environmental report
prepared by the PDMWD's environmental consultant, Ball & Associates, for the
proposed 4 MGD expansion to the Santee WRF. The report defines the environmental
effects which can be expected to occur from a stream enhancement discharge of small


                                7.16

PAGE 185 Show Image
volumes and various treatment levels. Through appropriate wastewater treatment and
an effective stream enhancement management program, the Regional Board is expected
to allow the initiation of a year-round stream enhancement discharge to the San Diego
River. The Regional Board has also suggested that several natural canyons tributary to
the San Diego River~could also be enhanced with a stream discharge. Opata Canyon
Creek, within the Miramar Naval Air Station, and Shepard and Murphy Canyons in
Tierrasanta could be considered for stream enhancement. Expanded environmental
studies are being planned to evaluate the effects of a discharge of larger volumes to the
stream.

7.2.5.2   Groundwater Recharge


Reclaimed water from the Santee WRF could be transported into the Santee HSA to be
used as recharge water for the groundwater basin. The reclaimed water would be of
befter quality than the local groundwater in this basin. Groundwater recharge may
require initial pumping the groundwater out of the aquifer before replacing it with
reclaimed water. It is anticipated that this recharged groundwater could be used for
irrigation and the aquifer could be used for wet-season storage of reclaimed water.
Thorough environmental studies beyond the scope of this Master Plan will be required to
determine if the use of reclaimed water to improve the basin is feasible. Other
groundwater basins located in the eastern portion of the study area may also benefit
from reclaimed water recharge operations.

7.2.6Outdoor Firefighting


Another potential use of reclaimed water that may become feasible in the future is
utilizing reclaimed water for outdoor firefighting, which would require designing the
distribution system for fire flows. Although questions and concerns exist regarding
reliability and a high potential of misuse, reclaimed water use for outdoor firefighting is
being considered by the regulatory agencies. Though not considered a market for the
Master Plan, the potential to use reclaimed water for fire hydrants should be reevaluated
when the Master Plan is updated.















                                7-17

PAGE 186 Show Image
                                                Table 7-i
                                    Potential Reclaimed Water Markets


                                                      1995 Demands                         Ultimate Demands


                                                        Annual    Peak Day               Annual      Peak D
                                    Total    Irrigated Water Use  Water Use   irrigated Water Use   Water U
               Market Name          Acres     Acres     (AFlYR)    (GPD)       Acres     (AFlYR)      (GPD)



     IRRIGATION USE


AGRICULTURAL & NURSERIES


A  1 Lakeside Pinery                   16          16        32     62,559          0          0
A  2 RanchojohobaNursery             3.75        3.75        11     21,993       3.75         11        21,9
A  3 Rios Canyon Ranch (avocado)      560         560       350    684.240        560        350       684,2
A  4 RD Jungman (avocado)              20          20        13     24,437         20         13        24,4
A  5 Designated Agricultural          600         150       375    733.115        150        375       733,1
A  6 Colorspot El Calon                40          40       120    234 597         40        120      234 5'

Subtotal                                                    901  1,760,942                   869     1,698,3


COMM ERCIAL'INDUSTRlAL DEVELOPMENTS


C  1 Sanlee Town Center               706        120        264    516,113        171        376      735,4(
C  2 Edgemoore Sr. CenteriHospital     28          9         23     43,987          9         23        43,9~
C  3 N.W. Gillespie Field              20          2          5      9.775          2          5         9,r~
C  4 Cuyamaca West                     72          9         23     43,987          9         23        43,9~
C  5 Gillepsie Field IndustrIal Park   75          6         15     29,325          6         15       29,3~'
C  6 Central Gillespie Field           20          0          0          0          2          5        9,77
C  7 Fairgrouds'Speedway (Developed)   67         0-          0          0          6         15       29,3c
C  7 Fairgrounds'Speedway              67          6         15     29,325          0          0
C  8 Home of Guiding Hands             14         10         25     48,874         10         25       48,87
C  9 USDRIP Revegatation              155        116      - 290    566,942          0          0
C  9 USORIP                           441         10         25     48,874         50        125      244,37
C 10 Alpine Commercialllndustrial     110          0          0          0         11         28       53 76

Subtotal                                                    684  1,337,201                   639    1,248,64


GOLF COURSESICOUNTRY CLUBS


G  1 Fanita Ranch Golf Course         175        105        263    513,180        105        263       513,18
G  2 Carlton Oaks Ccountrv Club       200          0          0          0          0          0
G  3 willowOrook Country Club          45          0          0          0         43        112       218,561
G  4 High Meadow Golf Course          100         90        225    439,869         90        225       439,86~,
G  5 Alpine GoIr Course               220         75        200    391 483         75        200       391.48,'

Subtotal                                                    688  1,344,533                   800 1 ,563,09(,










                                                     7-3

PAGE 187 Show Image
                                                Table 7-1
                                    Potential Reclaimed Water Markets
                                               (continued)

                                                      1995 Demands                     Ultimate Demands

                                                        Annual   Peak Day                Annual   Peak Day
                                    Total    Irrigated Water Use Water Use    Irrigated Water Use Water Use
               Market Name          Acres     Acres     (AFrYR)   (GPD)        Acres     (AFJYR)   (GPO)


MEDlAN&R.O.W.JlNTERCHANGES

M  1 Lake Canon Road                             0.12       0.24       469       0.12       0.24       469
M  2 Canton Hills Boulevard                      0.27       0.54     1.056       0.27       0.54     1.056
M  3 Mast Boulevard                              0.28       0.56     1,095       0.28       0.56     1.095
M  4 Carton Oaks Drive                           0.17       0.34       665       0.17       0.34       665
M  5 Mission Gorge Road (1)                      0.14       0.28       547       p.14       0.28       547
M  6 Mission Gorge Road (2)                      0.14       0.28       547      .0.14       0.28       547
M  7 Town Center Parkway                         3.35        6.7    13.098       3.35        6.7    13.098
M  8 Cuyamaca Street (1)                         0.02       0.04        78       0.02       0.04        78
M  9 Cuyarnaca Street (2)                        0.03       0.06       117       0.03       0.06       117
M 10 Magnolia (Alphonse to Princess Joann)       0.17       0.34       665       0.17       0.34       665
M 11 MagnolialMast Intersection                  0.17       0.34       665       0.17       0.34       665
M 12 Magnolialprospect Intersection              0.17       0.34       665       0.17       0.34       665
M 13 Magnolia (Prospect to Kennedy)              0.17       0.34       665       0.17       0.34       665
M 14 Hwy 125 (Watson Place to Carlton Oaks)        21         42    82.109         21         42    82.109
M 14 Hwy 125 (El Cajon bndry to Watson Place)      10         20    39,099         10         20    39.099
M 14 Hwy 125 (Grossmont College to El Cajon bndry) 10         20    39.099         10         20    39.099
M 14 Hwy 125?Carlton Oaks Interchange               4          8    15.640          4          8    15,640
M 15 Hwy52ICuyamaca Interchange                     0          0         0          4          8    15.640
M 15 Hwy 1 25IHwy 52 Interchange                    0          0         0         10         20    39.099
M 15 Hwy 52(1 mile west PDMWD boundary)             0          0         0         20         40    78,199
M 15 Hwy52(Hwy125toHwy67)                           0          0         0         34         68   132.938
M 15 Hwy 52' Mission Gorge Interchange              0          0         0          4          8    15.640
M 15 Hwy52(MasttoHwy125)                            0          0         0         20         40    78.199
M 16 Hwy 671Hwy 52 Interchange                      0          0         0         20         40    78.199
M 16 Hwy 67 (Winter Gardens to Willow)             16         16    31.280         16         32    62.559
M 16 Hwy671WInterGardenslnterchang~                 8         16    31.280          8         16    31.280
M 16 Hwy 67 (Willow to Slaughter House)             0          0         0         29         58   113.388
M 16 Hwy67(ProspecttoWo~side~                       9          9    17,595          9         18    35,190
M 16 Hwy 67!woodside Intrnchange                    3          6    11.730          3          6    11.730
M 16 Hwy67(Rivrn1ordtoWinterGardens~               12         12    23.460         12         24    46.919
M 16 Hwy 67 (Woodside to Riverlord)                12         12    23.460         12         24    46.919
M 16 Hwy 67IMapleview Interchange                   4          8    15,640          4          8    15.640
M 16 Hwy67!Riverford Interchange                    3          6    11.730          3          6    11.730
M 17 1-8 (Lake Jennings Road to Briden)             0          0         0         40         80   156.398
M 17 1-8 (Peutz Valley Road to Tavern)              0          0         0         34         68   132.938
M 17 1-8 (Tavern to South Grade Road)               0          0         0         25         50    97,749
M 17 l-8rTavern                                     0          0         0          6         12    23.460
M 17 1-8 (South Grade Road to Viejas Creek)         0          0         0         12         24    46.919
M 17 1-8 (Creek Road to Peutz Valley Road)          0          0         0         10         20    39.099
M 17 1-8 (Briden to Creek Road)                     0          0         0         10         20    39.099
M 17 I-8'Brlden                                     0          0         0          6         12    23.460
M 17 I~WLake Jennings Road                          0          0         0         10         20    39.099

Subtotal                                                     185   362.452                   822  1.607.770


                                                     74

PAGE 188 Show Image
                                               Table 7-1
                                   Potential Reclaimed Water Markets
                                              (continued)

                                                              1995 Demands                    Ultimate Demands

                                                               Annual   Peak Day             Annual     Peak D
                                              Total Irrigated Waler Use Waler Use irrigated Waler Use Water Li
              Market Name                     Acres  Acres     (AFlYR)   (GPD)     Acres     (AFlYR)    (GPD,'



SCHOOLS

S  1 Sycamore Canyon Elementary                          2.5      6.25     12.219     2.5       6.25       12.~
S  2 West Hills (turf)                           76        8        30     58,649       8         30       58,6
S  2 West Hills (landscape)                             0.03      0.06        110    0.03       0.06         1
S  3 Canton Oaks Elementary                                1       2.5      4.887       1        2.5        4,8
S  4 Chet F. Harrltt Elementary                          2.5      6.25     12,219     2.5       6.25       12,2
S  5 Canton Hills Elementary                             2.5      6.25     12.219     2.5       6.25       12,2
S  6 Prospect Avenue Elememlary                          2.5      6.25     12.219     2.5       6.25       12,2
S  7 Prospect Avenue Annex                               2.5      6.25     12,219     2.5       6.25       12,2
5  8 Grossmont College                          135       10        25     48,874      10         25       48,8
S  9 Rio Seco Elementary                                 2.5      6.25     12,219     2.5       6.25       12,2
5 10 Calon Park Elementary                               2.5      6.25     12.219     2.5       6.25       12.2
S 11 Cajon Park Annex                                    2.5      6.25     12,219     2.5       6.25       12,2
S 12 Santana High (turf)                         46        9        34     65.980       9         34       65,9i
5 12 Santana High (landscape)                            1.8      3.38      6.616     1.8       3.38        6,6
S 13 Santee Elementary                                   1.3      3.25      6.354     1.3       3.25
S 14 Hill Creek Elementary                           .   1.3      3,25      6,354     1.3       3.25        6,3L~
S 15 Eucalyptus Hills Elementary(turf!ground cover)     1.79      6.71     13.123    1.79       6.71       13,1~
S 15 Eucalyptus Hills Elementary (shrub)                0.01      0.02         37    0.01       0.02
S 16 Lakeside Farms Elementary (turtiground  cover)     3.26        12     23.900    3.26         12       23,9C
S 16 Lakeside Farms Elementary (shrub)                  0.02      0.04         74    0.02       0.04          7
S 17 Lakeside Middle (turflground cover)                   5        19     36.656       5         19       36,65
S 18 Rlverview Elemenatary (turfiground cover)           3.1        12     22.727     3.1         12       22,72
S 18 Riverview Elemenatary (shrub)                      0.28      0.53      1,029    0.28       0.53        1,02
S 19 Winter Gardens Elementary (turflground  cover)     2.29       8.6     16.788    2.29        8.6       16,78
S 19 Winter Gardens Elementary (shrub)                  0.04      0.08        147    0.04       0.08         14
S 20 Administration Building (turfiground    cover)     0.26      0.99      1,906    0.26       0.99        1.90
S 20 Administration Building (shrub)                    0.02      0.04         74    0.02       0.04          7,
S 21 El Capitan (landscape)                              1.8      3.38      6.616     1.8       3.38        6.611
S 21 El Capitan (turf)                           50      6.6        25     48.386     6.6         25       48,381
S 22 Llndo Park Elementary (turfiground      cover)     3.05        11     22.360    3.05         11       22,361
S 22 Lindo Park Elementary (shrub)                      0.01      0.02         37    0.01       0.02          3;
S 23 Tierra Del So Middle (turllground cover)           5.32        20     39.002    5.32         20       39,00:
S 23 Tierra Del So Middle (shrub)                       0.05      0.09        184    0.05       0.09
S 24 Rios Elementary                             10      0.1      0.38        733     0.1       0.38         73:
S 25 Crest Elementary                             9     0.04       0.1        195    0.04        0.1         19~
S 26 Dehesa Elementary                                     1       2.5      4.887       1        2.5       4.68~
S 27 Joan MacQueen Middle (turf)                 13        7        26     51.318       7         26       51.31~
S 27 Joan MacQueen Middle (landscape)                      3      5.64     11,026       3       5.64       11 ,02E
S 28 Shadow Hills Elemenatary(landscape)                   1      1.88      3.675       1       1.88        3.675
S 28 Shadow Hills Elemenatary (turf)             13        6        23     43,987       6         23       43,987
S 29 Alpine Elementary (landscape)                         1      1.88      3.675       1       1.88        3.675
S 29 Alpine Elementary (turf)                    10        4        15     29 325       4         15       29.325

Subtotal                                                           347    677.438                347      677.438



                                                    7-5

PAGE 189 Show Image
                                            Table 7-1
                                Potential Reclaimed Water Markets
                                           (continued)

                                                     1995 Demands                    Ultimate Demands

                                                    Annual      Peak Day          Annual        Peak Day
                       -               Total Irrigated  Water Use  Water Use Irrigated  Water Use  Waler Use
              Market Name              Acres Acres  (AFlYR)     (GPO)    Acres    (AFlYR)       (GPO)



PARKS

P  1 Mission Trials Regional Park                30     75     146,623       50       125       244,372
P  1 Mission Trails Regional Park (CALTR 60      60    360     703,790        0         0             0
P  2 South of Big Rock Park                       0      0           0        3       7.5        14,662
P  3 Big Rock Park                        5       5     11      21,505        5        11        21,505
P  4 Santee Lakes Regegional Park & Campground         137     205,500                137       205,500
P  5 SportsAreaPark                      46      46    101     197,843       46       101       197,843
P  6 Mast Park                           58      40     88     172,038       40        88       172,038
P  7 Woodglen Vista Park                 10      10     22      43,009       10        22        43,009
P  8 Paul Kay Ballfield                   7       0      0           0        0         0             0
P  9 Cecil Gorden Ball Park               5       0      0           0        0         0             0
P 10 BealIFleld                           4       4     10      19,550        4        10        19,550
P 11 LouisA. Stelzer County Park        314       0      0           0        0         0             0
P 12 Cactus County Park                  64       5     13      24,437        5        13        24,437
P 13 Llndo Lake County Park -            55      10     25      48,874       10        25        48,874
P 14 El Monte County Park                90      20     50      97,749       20        50        97,749
P 15 FIlnn Springs County Park           42       3    7.5      14,662        3       7.5        14,662
P 16 Nancy Jane County Park               1       1    2.5       4,887        1       2.5         4,887
P 17 South Lane Park                              4     10      19,550        4        10        19,550
P 16 Old Ironside Park                    1       0      0           0        0         0             0
P 19 Harbison Canyon Road                         6     15      29,325        6        15        29,325
P 20 Alpine Community Center                      4     10      19,550        4        10        19,550
P 21 Tavern Road                                  3    7.5       14662        3       7,5         14662

Subtotal                                               944   1,783,554               642      1,192.175


RESIDENTlAUMIXED

R1 Fanlta Ranch                                  32     80     156,397       64      160        312,796
R2                                      180       0      0           0       18       45         87,974
R3 Woodcrest                             71     7.1     18      34,701      7,1       18         34,701
R4 Mission Creek                         72       5     13      24,437        5       13         24,437
R5                                       55       0      0           0      5.5       14         26,881
R6TM 85-04                               66       0      0           0      6.6       17         32,257
R7TM 89-02                              195       0      0           0     19.5       49         95,305
R8                                       50       0      0           0        5       13         24,437
R9                                     1840       0      0           0      184      460        899,287
R10 High Meadow Ranch                             0      0           0        0        0              0
R11                                     150       0      0           0       15       38         73,311
R12                                     140       0      0           0       14       35         68,424
R13                                      65       0      0           0      6.5       16         31,768
R14TM4445                               126       0      0           0     12,6       32         61,582
R15                                     580       0      0           0       58      145        283,471
Rl6TM 4809                              260       0      0           0       26       65        127,073



                                                 78

PAGE 190 Show Image
                                               Table 7-i
                                   Potential Reclaimed Water Markets
                                              (continued)

                                                      1995 Demands                     Ultimate Demands

                                                        Annual   Peak Day              Annual    Peak 0
                                    Total    Irrigated Water Use Water Use  irrigated Water Use Waler L
              Market Name           Acres     Acres     (AFlYR)   (GPD)      Acres     (AFlYR)    (GPO'


R17                                  320          0           0         0        32         80      156,:
R18TM 4465                            82          0           0         0       8.2         21       40,(
Rl9TM 4655                            49          0           0         0       4.9         12       23.c
R20                                  130          0           0         0        13         33       63.~
R21                                  100          0           0         0        10         25       48,~
R22                                  140          0           0         0        14         35       68,A
R23                                  670          0           0         0        67        168      327.~
R24                                  975          0           0         0      97.5        244      476,~
R25                                  350          0           0         0        35       87.5      171.C
R26                                  960          0           0         0        96        240      469.1
R27                                  580          0           0         0        58        145      283.4
R28                                  230          0           0         0        23       57.5      112.4
R29                                  550          0           0         0        55        138      268.8
R30TM 4347                            50          0           0         0         5       12.5       24,4
R31                                  135          0           0         0        14         34       65.9
R32                                   75          0           0         0         8         19       36.6
R33                                   30          0           0         0         3          7       14.1
R34TM4853                            134          0           0         0      13.4       33.5       65.4
R35TM 4673                            40          0           0         0         4         10       19.5;
R38TPM 18862                          50          0           0         0         5       12.5       24.4;
R37                                   30          0           0         0         3        7.5       14.6
fl38                                  35          0           0         0       3.5       8.75       17,11
n39                                  580          0           0         0        58        145      283A
R40                                  785          0           0         0      78.5        196      383,61
R41                                  215          0           0         0      21.5      53.75      105.01
R42                                  310          0           0         0        31       77.5      151,5
R43                                  275          0           0         0        28         69      134.4(
R44                                  790          0           0         0        79        198      386,1(
R45                                  630          0           0         0        63      157.5      307.9(
R46                                  480          0           0         0        48        120      234,5~.
R47                      .            80          0           0         0         8         20       39.0c,
R48                                   50          0           0         0         5       12.5       24A:
R49                                  173          0           0         0        17         43       84.&
RS0TM 3753                            39          0           0         0       3.9         10       19,0~
R51 ~azy Ranch                        70          0           0         0         7       17.5       34.21
R52                                  104          0           0         0        10         26       50.8c
R53TM 4802                            25          0           0         0       2.5       6.25       12.21
R54TM4849                             83          0           0         0       8.3      20.75       40,SE
Ass                                   60          0           0         0         6         15       29.3c
R56                                   50          0           0         0         5       12.5       24A~
R57                                   80          0           0         0         2         70       39.1C
R58                                   50          0           0         0         5       12.5       24.42
R59TM 4553                           214          0           0         0      21.4       53.5      104.59
R60                                  180          0           0         0        18         45       87.97
R61 Alpine Ranch West                226          0           0         0        23         56      106 81

Subtotal                                                    110   215.536                3.972    7.763.40

                                                    7.7

PAGE 191 Show Image
                                            Table 7-i
                                Potential Reclaimed Water Markets
                                           (continued)

                                                    1995 Demands                   Ultimate Demands

                                                     Annual   Peak Day             Annual    Peak Day
                                  Total   Irrioated Water Use Water Use Irrioated Water Use  Waler Use
               Market Name        Acres   Acres     (AFlYR)    (GPD)    Acres     (AFlYR)     (GPD)


      RECREATIONAL USE

 P  3 Santee Lake Replenishment                          366   500,000                 366    500,000

 Subtotal                                                366   500,000                 366    500,000

      INDUSTRIAL USE

1  1 Precast Concrete                                    1.2     1,504                 1.2      1,504
1  2 Gillespie Field                                       0         0                   0          0
I  3 Woodward Sand & Gravel                              2.2     2,298                 2.2      2,298
II 4 Nelson Sloan Sand Plant                               l      ~1044                  l      1,044

 Subtotal                                                4.4     4,846                 4.4      4,846

   COMMERCIAL BUILDING USE

A  1  Lakeside Plnery (Developed)                          0         0                   8     10,026
C  1  Santee Town Center                                  71    88,976                 111    139,104
C  3  N.W. GIllespie Field                                10    12,532                  10     12,532
C  4  Cuyamaca West                                       12    15,038                  12     15,038
C  5  Glllepsie Field Industrial Park                      0         0                   0          0
C  6  Central Gillespie Field                              0         0                  10     12,532
C  7  FairgroudslSpeedway (Developed)                      0         0                  33     41,355
C  9  USDRIP                                              35    43,862                 174    218,055
C 10  Alpine Comm.!Ind.                                    0         0                  47     58 900

 Subtotal                                                128   160,408                 405    507,541

 TOTAL                                                 4,357 8,146,909               8.865 16,763,300


















                                                 7-8

PAGE 192 Show Image
                                CHAPTER 7

                               REFERENCES



Alpine Union School District, Facility Planning. Communications with Rob Turner, March
7, 1990.

Brian Mooney. Communications with Jerry Molees, March 1990.

Cajon Valley Union School District Maintenance Department. Communications with Bill
Hooper, March 13, 1990.

California Department of Health Services. Communication with Lanny Merin, April 11,
1989.

California Department of Transportation. Communication with Tom Ham, March 16,
1989, May 8,1989, and March 22, 1990.

California Regional Water Quality Control Board - San Diego Region. Communication
with R. Morris, April 11,1989.

City of El Cajon Department of Planning. Communication with Bob Piete, March 9, 1990.

City of El Cajon Department of Public Works. Communication with Bob Piete, March 9,
1990.

City of El Cajon General Plan 1990-01.

City of El Cajon General Plan 2000.

City of Santee. Communications with Cory Christense, March 13,1990.

City of Santee. Communications with Edward Ruiz, March 13,1990.

City of Santee. Communication with John Frenken, March 27, 1989, April 27, 1989, and
March 7,1990.

City of Santee General Plan.

City of Santee. Santee Town Center Executive Summary, obtained March 13,1990.

City of Santee. Study of Reclaimed Water Usage, February 21,1986.



                                  7-18

PAGE 193 Show Image
County Airport Division. Communications with Jim Ramey, February 27,1989 and
March 8, 1990.

County of San Diego 25% + Slopes Map.

Fargo Industries. Communications with Max Love, May 15, 1990.

Grossmont Union High School District Planning and Assessment. Communications with
Dan Kitchen, March 15, 1990.

Lakeside Union School District. Communication with Norm Lumpkin, March 23, 1990.

Linsley, Kohler, and Paulhus. Hydrology for Engineers, 1982.

Luke-Dudek Civil Engineers, Inc. and Black & Veatch, Engineers-Architects. San Diego
River Basin Reclaimed Water Planning and Development Study, October 1989.

Newland California Development Company. Communications with Doug Wilson
February 27,1989 and March 12, 1990, and May 17,1990.

Padre Dam Municipal Water District. Communications with John Ryan, May 23, 1990.

Padre Dam Municipal Water District. Communications with Roland Rossmiller, March
15,1990.

Padre Dam Municipal Water District. Communications with Ted Mitchell, May 23,1990.
1989 and March 6,1990.

Padre Dam Municipal Water District. 1985-1988 Water Use Data.

Padre Dam Municipal Water District. 1990 Water Use Data.

Part IV, Lakeside Community Plan, San Diego County General Plan, December 1989.

Part XL, Alpine Community Plan, San Diego County General Plan. December 1989.

Part XXLL, Crest/Dehesa/Harbison Canyon/Granite Hills Subregional Plan, San Diego
County Plan, December 1989.

San Diego County Department of Planning and Land Use. Communication with Ben
Grahm, March 13, 1990.

San Diego County Department of Planning and Land Use. Communication with, David
McGruire March 13, 1990.



                                7-19

PAGE 194 Show Image
San Diego County Department of Planning and Land Use. Communication with Ken
Stevens, March 13,1990.

San Diego County Department of Planning and Land Use. Communication with Nancy
Whalen, April21, 1989 and March 6,1990.

San Diego County Parks Department. Communications with Noel Parr, March 13,1990.

San Diego County Parks Department. Communications with Tony Perkins, February 28,
1989 and March 3, 1990.

San Diego County Office of Education, Facility Planning Communications with Tom
Robinson, March 7,1990.

Santee School District Grounds Department. Communications with Evelyn Lyons,
March 15, 1990.

University of California Extention Services, Climates of San Diego - Agricultural
Relationships, 1970.





























                                7-20

PAGE 195 Show Image
               CHAPTER 2  -  SECTION 10632  -  iD


iD.  (Recycled water)  The projected use of recycled water within
the supplier's service area at the end of 5, 10, 15 and 20 years.

In 1990, the District commissioned engineering consultants, Dudek
and Associates to develop a Water Reclamation Master Plan.  The
plan was adopted by the District's Board of Directors on January
1, 1991, Resolution 91-7.

It should be noted that since the time of the preparation of the
Water Reclamation Master Plan, the markets for the Phase I
Upgrade Project to the District's Santee Water Reclamation
Facility have been refined for demand levels and distribution
feasibility for 1997.

At the completion of upgraded facilities at the District's Santee
Water Reclamation Plant, the production of reclaimed water will
increase to 2 MGD.  This will supply approximately 10% of the
daily water demands in the District.

The following are the current estimated projections for the
annual use of recycled water within the District's service area.


          Year 1995      400 AF    Current production with
                                   use only at Santee bakes
                                   Regional Park and Campground

          Year 1997      500 AF    2MGD project on line, a
                                  portion of customers connected
                                  and using recycled water

          Year 2000      850 AF    2 MGD project on line, all
                                   customers connected

          Year 2005      850 AF    unchanged

          Year 2010     1900 AF    4 MGD project on line with
                                   additional customers connected

          Year 2015     1900 AF    unchanged

PAGE 196 Show Image
               Chapter 2  -  Section 10632  -  lE


lE.  (Recycled water)  A description of actions, including
financial incentives, which `nay be taken to encourage the use of
recycled water where fresh water is not necessary, and the
projected results of these actions in terms of acre-feet of
recycled water used per year.

The District adopted a Water Reclamation Ordinance on November
14, 1989 (Ordinance 89-13) .  This Ordinance mandates the use of
recycled water, for appropriate and approved uses, when it is
available and delivered to the customer.  See "Water Reclamation
Ordinance" in the Appendix.

The District adopted a rate schedule for the sale of reclaimed
water to customers on June 13, 1995 (Ordinance 95-5). Reclaimed
water was priced at 85% of the Standard I potable water price (in
the inclining block rate structure). This pricing structure was
designed to encourage adequate and appropriate use of reclaimed
water and to assist in offsetting any customer-incurred costs to
retrofit existing irrigation facilities, supply appropriate
signage, provide an on-site irrigation manager and any other
required measures.  See "Reclaimed Water Rates" in the Appendix.

On May 2, 1995, the District's Board of Directors heard a
presentation on the financial aspects of the 2 MGD Upgrade
Project for the Santee Water Reclamation Plant.  An analysis of
reclaimed water sales at various levels showed a financially
feasible project.  See attached "Executive Summary, Water
Reclamation Phase I Project Analysis."

The District adopted a Reclaimed Water Customer Site Retrofit
Funding Policy on October 24, 1995.  This policy established that
the District would reimburse current irrigation customers for
eligible retrofit costs.  See attached "Reclaimed Customer Site
Retrofit Policy."

PAGE 197 Show Image
   Padre Dam Municipal Water District


Water Reclamation Phase I Project Analysis


             April 28, 1995

PAGE 198 Show Image
                                     Executive Sunui~ary

Attached is the analysis of the Water Reclamation Phase I project. Staff has developed
five financial models to analyze effect of the major factors that are likely to change,
and to affect the project's finances.

The Models are:

Mode!     1     The base assumptions assuming sales of 1,018 AFY.
Model   2 -     The base assumptions assuming sales of 650 AFY.
Model   3 -     The base assumptions assuming sales of 750 AFY.
Model   4 -     The base assumptions assuming sales of 650 AFY and assuming that the
                District did not qualify for the State Water Reclamation Loan.
Model   5 -     Water Reclamation Project without a Distribution System
The graph below presents the estimated savings for the project with models one
through four. It also presents the loss that would occur if the District does not
construct the Distribution system.



                               Water fleclamation Phase  I  Project
                                     5avI~s or Loss on Project
               ?00


               coo


               500
        (0
        (0
        0
               `00

        L
        0
               300

        -C;

               ~00
        a,  ~
        (n

        a,    100

        C
        C



               100


                                                                       3
               ·200
                  19~S6 19M'97  1ss~go  in', as  19S1'00  2~O1 200v02  2OO2~O3  2Cw~O4

                                            Fiscal Year

          -a-Moos  I    -a-Model 2    ~Model 3     -a-Model 4    ~Model 5







The current estimate of reclaimed water sales is 829 acre feet per year.

In addition to modeling the financial result of changing the major factors, this repon
discusses the impact of various other minor factors affecting the financial viability of
the project.

Staff is recommending that the Board authorize Staff to continue with the project.

PAGE 199 Show Image
                    RECLAIMED WATER EXPANSION PROJECT PHASE I



THE PROJECT


The project takes advantage of the District's unique circumstances in sanitation and
water reclamation operations. The District decided in the mid-sixties not to join the
San Diego Metropolitan Sewerage System, but instead to construct its own water
reclamation plant. The plant was constructed to process 4 miffion gallons of
wastewater per day (MGD) with provisions to expand to 8 MGD in the future. Santee
Lakes was constructed to make recreational use of the reclaimed water that was
produced. A distribution system was constructed to deliver reclaimed water to the
areas of Cariton Oaks and Giflespie Field. Excess reclaimed water was discharged into
the San Diego River.

After several years of successful operations there was an outbreak of mosquitoes in the
San Diego River area. The Santee Water Reclamation Plant was identified as a
contributor toward that problem and ordered by the County Health Department to
restrict its discharge into the river. The Plant operations were constrained by the
Health Department and later by the Regional Water Quality Control Board to 1 MGD
operating capacity.

Over the course of the years, the District has been active in pursuing permission to
increase Plant capacity. Mter several studies and the development of a Reclaimed
Water Master Plan, the feasibility of a phased expansion of the Reclamation Plant was
envisioned. The Phase I project was to take the existing plant and distribution system
and expand it to 2 MGD. The Phase I project will also prepare the plant to be
expanded to 4 MGD when an acceptable means is developed for selling or disposing
of the additional reclaimed water that is produced. All expansion beyond the current 2
MGD is dependent on the ability to dispose of the reclaimed water in an
environmentally acceptable way.

This project is comprised of the following elements:

·     Rebuild the sewer pump station at Field Operations, and add odor controls.
·     Replace the secondary treatment with a Bardenpho Process.
·     Expand the distribution system.
·     Retrofit existing potable water irrigation systems with reclaimed water services.

FINANCIAL FACT6Rs

The financial analysis of the Reclaimed Water Expansion Project Phase I is intended
prepared to determine the financial viability of the project based on a variety of factors
that can affect the project's profit or loss. There are three primary factors which have
major effects on the project feasibility. There are a number of otl~er factors which
have minor effects.

PAGE 200 Show Image
The three major factors are:

      1.    Reclaimed water sales
      2.    Cost and availability of potable water
      3.    Cost of wastewater treatment with the San Diego Metropolitan Sewerage
            System

These factors have the following general effects.

As reclaimed water sales increase, the project's viability increases. The minimum
reclaimed water sales are estimated to be 600 acre feet per year. The maximum is
esttmated to be 1,018 acre feet per year. As sales increase between 600 and 1,018 acre
feet per year, profit from the project also increases.

As the cost of potable water increases, the project's viability increases. The
assumption used in the analysis is that reclaimed water will be sold at the same pnce
as potable water. The retail price is set equal to the standard I water rate. The
analysis does not address several options that are being discussed.

The options are:

      Lower rates for customers who use a higher volume of water.
      Lower rates for customers who retrofit their potable water systems.
      Lower rates for customers who use reclaimed water.

As the cost of wastewater treatment with the San Diego Metropolitan Sewerage System
increases, the project's viability increases. The Phase I project will reduce the amount
of wastewater treated in the Metro system. The treatment cost at the Santee plant will
increase only marginally. The reduced cost of the Metro system offset by the marginal
cost increase at Santee is shown in the model as a benefit to the reclaimed water
system. The higher the Metro cost the more benefit there is to the reclaimed water
system.

Minor factors include:

·     Qualification for the "Water Pollution Contiol" Revolving Fupd Loan
            The revolving loan fund interest is half the state's interest cost of loans.
            Half the interest is paid by the district, the other half is paid by Federal
            Grants. The total of the payments on the State loan are estimated to be
            $20,866,300. The total of the payments would have been $30,536,940 at
            normal bond rates.  The revolving fund loan will save the District
            $9,670,640 over the next 25 years, or about $386,825 per year.

·     Qualification for the "Water Reclamation" Revolving Fund Loan
            This revolving fund loan is also at one half normal interest cost. The
            reclamation loans h~ve more extensive regulations. The District
            reclamation system may not qualify if the volume of reclaimed water
            sales is not sufficient to justify the cost of the distribution system. One
            of the models will address the impact of the loss of the reclamation loan.

PAGE 201 Show Image
     Availability of District fi~~~ncing for project costs not funded by revolving fi~nd
     loans and district COStS nol eligiblc for o(li~r fiIt;i~~~.ing.
           The District has borrowed $5,000,000 to fund the initial design and
           planning work for the Phase I project, The District will have to issue
           Certificates of Participation (COP) to pay off the balance of the
           $5,000,000 loan and pay for the portions of the project not funded by the
           State Revolving Fund loan,

     MWD's New Demand Charge
           The Metropolitan Water District of Southern California has adopted a
           charge for each additional acre foot of water delivered. The initial
           amount of the new demand fee is $1,000 per acre foot.  If the Water
           Reclamation project reduces the demand for potable water by 650 to
           1,018 acre feet per year, it will save the District $650,OO() to $l,()18,000
           in new demand fees. (One time charge).

·    MwD's Readiness to Serve Charge
           The Metropolitan Water District of Southern California has adopted a
           charge for being ready to serve. The amount of Readiness to Serve is $
           31.00 per acre foot.  The Phase I project will reduce the Readiness to
           Serve by $ 31,558 per year.

·    Impact of Reduced Potable Water Sales

           SYSThM CHARGE  All of the customers scheduled to use reclaimed
           water at this time are currently using potable water for irrigation. They
           are currently hooked up to the system and are paying system charges.

           The revenue from the system charge and the costs that were being paid
           for with the system charge will be transferred from potable water to the
           reclaimed water system. When that is done, the costs of reading, billing,
           and maintaining the meters, which are functions paid for through the
           system charge, will be transferred from retail water to reclaimed water.
           Since both revenue and costs are being transferred there will be no
           financial impact to the district.

           REDUCED WAThR SALES - Currently, the retail water operation sells
           potable water at $ 150.00 per acre foot more than wholesale water costs.
           With the expected volume of reclaimed water we will reduce the amount
           of potable water sold, as reclaimed meters are transferred from the
           potable water system to the water reclamation system.

           This reduction in potable water sales will range from 650 acre feet to
           1,000 acre feet per year. Based upon $ 150.00 per acre foot, the loss in
           gross profit on potable water will range from $97,500 at 650.00 acre feet,
           to a high of $ 152,700 acre feet at 1,018 acre feet per year of potable
           water.

PAGE 202 Show Image
          This loss in gross profit will be made up by gwwth of potable water
          sales. Growth rates are currently estimated to be in the range of 1.8% per
          year. The growth of the district will be about 336 acre feet a year.

          Since the effect of the customers going on the reclaimed water system
          will be felt over a two to three year period, the net effect of the
          reclaimed water system will be to transfer the new growth in the retail
          water system to the reclaimed water system, thereby leaving the gross
          profit on potable water approximately the same as it is today.



FINANCIAL ANALYSiS


The financial analysis presents the water reclamation operation base model and
compares the effect of changes in the major variables. The models presented will be:

     1.     Base budget updated with revised METRO sewer costs with 1,018 acre
            feet sales.
     2.     Reduced sales to 650 acre feet.
     3.     Reduced sales to 750 acre feet.
     4.     Reduced sales to 650 acre feet and assume the loss of the reclamation
            loan.
     5.     Water Reclamation Project without a Distribution System

in each of the models, the amount of the Metropolitan Sewerage System savings will
be shared with the water reclamation operation only to the extent necessary to keep the
water reclamation operation solvent. This will show the profitability of the water
reclamation project as it reduces the cost of sewer operations and lowers sewer rates.
Also, when reclaimed water sales are varied the impact is shown in the water
reclamation model.

PAGE 203 Show Image
               PADRE DAM MUNICIPAL WATER DISTRICT
                     BOARD AGENDA STATEMENT


MEETING DATE:        SUBJECT:                 DATE:October 13. 1995

 to            5      C    d     torn   S~te Ret 0
PREPARED BY:         DEPARTNENT:        MANAGEMENT
Harold Baile         Water Reclarnation APPROVAL:
PREVIOUS BOARD CONSIDERATION:
SUNM~Y OR EXPLANATION:
The District is proceeding with irnplernenting the Phase 1 reclanation
project.  To be successful, conversion or retrof it of current
irrigation Customers to use reclajied water is necessary.  The issue
is who should pay for the retrof its.  Staff reconends that the
District reirnburse Customers for eligible retrofit costs.  See
attachment for additional information.


ATTACHME~S:
1.  Reclaimed Water CListomer Site Retrofit Funding Policy.
2.  Exhibit A, Padre Dan NID Reclajied Water Custorner Data,
    Retrofits

RZCOlOiKMDATION (S):

1.  Hear staff report on the retrofit rebate policy.

2.  Consider the staff reco=endations.

3.  Direct the General Xanager to impletment the retofit policy for
    initial reclaimed water customers as part of Phase 1 Reclaimed
    Water Distribution System expansion.


ACTION NEEDED:   NOTION X  I nZSOLUTION    ORDINANCE   NONE
RzVI~wZD BY COUNSEL         STANDARD       REVIEW NOT
   AS TO LEGALITY:          FORM:          APPLICABLE:
FINANCzAL STAT~&E~: (FUNDING SOURCE, FISCAL zXPACT, BUDGET AMOUNT)

The cost to the District would be approximately $400,000.  ~g
would be either from a Depart=ent of Water Resources Loan or from
Certificates of Participation.




AS RSC~~ED:      x     RKSOLUTION NO.______  ORDINANCE NO._______

OTHER:

98~R7/93






OCT ?4 19%                      6

PAGE 204 Show Image
                   RECLAIMED WATER CUSTONER SITE
                      RETROFIT FUNDING POLICY

BACKGROUND

The District has been pursuing the implementation of an expanded water
reclamation program for several years.  Key policy statements by the
Board of Directors are summarized in the following:

    A.   November 14, 1989, approved the ordinance (89-13) regarding
         the mandatory use of reclaimed water.

    B.   1991, approved a master plan for water reclamation.

    C.   Nay 10, 1995, established the policy that the District would
         help customers with the necessary retrofits.

    D.   June 13,  1995, approved the final environmental impact
         report on the proposed project.

    E.   June 13, 1995, established the rate for reclaimed water to
         be 85% of the Standard I potable water rate.

    F.   August 8, 1995, approved the construction of the expansion
         and modifications of the Water Reclamation Facility.

The general policy of the Board on the cost to customers for reclaimed
water has been that the District should provide reclaimed water
service without an increase in costs to the customers.  The two key
factors in implementing this general policy are the rates charged for
the commodity, and the costs of retrof its of existing systems.

In order to utilize reclaimed water, existing irrigation customers
will  need  to  make  conversions  or  retrof its  of  their  systems.
Irrigation systems which were constructed in the last 10 years or so
will be relatively straightforward to retrofit.  Older systems will
reguire significant work to ensure that the irrigation system is
separated from the potable water system and capable of functioning as
intended.   Typical retrofit work includes marking and identifying
fixtures  and  sprinkler heads,  posting  signs,  and ensuring  the
separation  from the  potable water  system.    To  facilitate  the
conversion, staff is preparing a set of guidelines for retrof its.

The cost impact of this work will vary, depending upon the age, size
of the site, and type of irrigation eguipment used.  The extent of the
work is estimated to cost approximately $2000 per acre of land
converted.

Utilization of reclaimed water will reguire common types of essential
facilities for all services, such as furnishing or converting meters,
furnishing and installing   backflow prevention devices and other
details completed at additional costs.  The following items of work

                                 2



OCT24 1995                        6

PAGE 205 Show Image
  details completed at additional costs.  The following items of work
  are anticipated:

       1.   Design for the retrof it.

       2.   Purchasing or converting a meter for reclaimed water use for
            each customer.

       3.   Purchasing and installing signage.

       4.   Color coding all necessary system components.

       5.   Inspection by Padre Dam staff.

       6.   Preparation of other related documentation.

       7.   Review, inspection and approval by the County Department of
            Health Services.

       8.   Installation of reclaimed water meter.

       9.   Furnishing backflow prevention device for the potable water
            service, if the existing service does not have one.

  The cost of the above listed items associated with the retrofit
  directly benefit the District by allowing the use of reclaimed water.
V Therefore, it is recommended the District to fund these costs.

  New land developments have been required to install specially marked
  and colored piping for reclaimed water systems for several years as
  part of the project approval process by the District.  Developers have
  been willing to do this under the uniform application of the
  regulation so that all developments permitted after a certain date
  would be subject to the same rules.   Other customers have been
  converting their facilities as part of their maintenance programs.
  Therefore, there are various levels of need for retrofit among the
  customers

  Various methods have been used to fund retrofit programs in other
  agencies.  Irvine Ranch Water District loans funds to the customer,
  and uses Metropolitan Water District Local Projects Program incentives
  to repay the note. The City of San Diego intends to pay for customer
  retrof its.

  RETROFIT REBATE PROGRAM

  The scope of the retrofit program is summarized in Table 1.  The list
  of sites is contained in Exhibit A.  The sites with existing plumbing
  for reclaimed water are not listed, although inspection by the San
  Diego County Department of Health Services will be necessary prior to
  connection.



                                    3

PAGE 206 Show Image
                              TABLE 1
               SUMMARY OF SITES REQUIRING RTTROFITS

          Customer Type            No. of Sites     Total Demand
                                                      AF/YR

Commercial Irrigation                  32                     76.5

Government Irrigation                   5                     43.8

Multifamily Irrigation                 38                    181.1

Parks                                   8                     59.9

Roadway Irrigation                     40                     52.8

School Irrigation                       8                     79.8




The recommended method of funding customer retrof its is through a
direct payment of eligible costs. Eligible costs would be established
through a plan review process followed by a bidding process, or, if
the customer wished to perform his own work, eligible costs would be
from a standard price list maintained by the District.

The overall process would involve an inspection of the site, design of
the retrof its by staff,  and discussion with the customer.   The
customer would be responsible for constructing the facilities.  The
District would inspect the construction to ensure compliance with
various regulations and standards.  The work that would be eligible
would be those items of work listed above.  Ineligi~le costs would be
work involved in upgrading or enhancing an irrigation system beyond
the general scope of meeting the codes for reclaimed water use.

FINANCIAL IMPACT

The estimated cost of retrofits is approximately $400,000.  Staff has
been preparing an application to the State Department of Water
Resources for a Conservation Construction Loan to assist with the
retrofit program.  There is no guarantee that a loan will be made
through this program.  The amount being applied for is $500,ooo.  The
loan could be received by early next calendar year.

Costs for the retrofit program have been included in the ~ost
estimates for the reclaimed water distribution system.










                                 4



OCT2~I995                           6

PAGE 207 Show Image
ALTF:RNATIvEs

     1.   Do not provide any financial assistance for retrofits.

     This would be contrary to the general policy stated earlier.
     This policy would have several impacts on the operation of the
     project in meeting the reclamation goals.  While the elimination
     of any loans would lessen the burden on staff to mange the array
     of agreements necessary and track payments, there would be an
     increased  burden  to  convince  customers  to  retrofit  their
     irrigation systems.  The net effect would be a reduced customer
     base and a longer time for reaching a financial break-even point.

     2.   Provide  a  rebate  proportional  to  the  amount  of  land
          retrofitted to each customer needing retrof its.

     This would not be tied to the actual cost incurred, and hence, in
     some cases would be~ a gift of public funds with no associated
     benefit,~and therefore is prohibited by law.

     4.   Provide  loans  to  customers  who  may  wish  to  finance
          retrof its,  to cover costs equal to the expense of the
          retrofit.

     This loan would be interest free and repaid through a rate
     surcharge above the rate which has been established as 85 percent
     of potable.

                                                  `4














~ACXmO. Igs












                                  5

PAGE 208 Show Image
               CHAPTER 2  -  SECTION 10632  -  iF


iF.  (Recycled water)  A plan for optimizing the use of recycled
water in the supplier's service area, including actions to
facilitate the installation of dual distribution systems and to
promote recirculating uses.

The District adopted a Water Reclamation Ordinance (Ordinance 89-
13) on November 14, 1989.  This Ordinance mandates the use of
recycled water, for appropriate and approved uses, when it is
available and delivered to the customer.  The Ordinance also
mandates the installation of dual piping systems for new
construction in areas that will be served by the present or
future expansion of the treatment capacity at the District's
water reclamation facility.

The District's Engineering Department reviews all applications
for new service.  Separate irrigation meters for appropriate
properties are required to facilitate current or future reclaimed
water service to the property.  See "Water Reclamation Ordinance"
in the Appendix.

In order to maintain the quality of wastewater generated in the
sewer service collection area so that it remains suitable for
reclamation by the District's water reclamation facility, the
District adopted an Industrial Waste Ordinance (Ordinance 93-13
on October 12, ~993.)

The purpose of this ordinance is to provide for the maximum
beneficial public use of the District's wastewater system through
adequate regulation of sewer use and industrial wastewater
discharge, to provide for equitable distribution of the
District's costs, and to provide procedures for complying with
wastewater discharge requirements placed upon the District by
other regulatory bodies.

In 1990, the District commissioned engineering consultants, Dudek
and Associates to develop a Water Reclamation Master Plan.  The
plan was adopted by the District's Board of Directors on January
22, 1991, Resolution 91-7.

Included in Chapter 2, Section 10632, 1-C are several pages taken
from that plan which provide a detailed description of the
potential uses of recycled water, including, but not limited to,
agricultural irrigation, landscape irrigation, wildlife habitat
enhancement, wetlands, industrial reuse, groundwater recharge,
and other appropriate uses, and a determination with regard to
the technical and economic feasibility of serving those needs.

It should be noted that since the time of the preparation of the
Water Reclamation Master Plan, the markets for the Phase I
Upgrade Project to the District's Santee Water Reclamation
Facility have been refined for demand levels and distribution

PAGE 209 Show Image
feasibility for 1997.

At the completion of the upgraded facilities at the District's
Santee Water Reclamation Plant, the production of reclaimed water
will increase to 2 NGD.  This will supply approximately 10% of
the daily water demands in the District.

The District has researched all existing markets in the service
area and proposes to serve all that are cost-effective.

PAGE 210 Show Image
                CHAPTER 2  -  SECTION 10632  -  2


2.  (Management of additional water supplies) Exchanges or
transfer of water on a short-term or long-term basis.

The District shares an intertie (Connection #6) with a
neighboring provider, the Helix Water District, which owns a
9,000 acre feet storage reservoir and filtration plant.  Through
arrangements with the County Water Authority, the District
utilizes this intertie on a daily basis.  For emergencies, this
intertie can supply less than one-half of the District's normal
warm season demand, 24 million gallons per day. See Chapter 1,
E2.

The amount of water obtained from Connection #6 via Helix Water
District varies according to season.  Generally, District
purchases of water are 2/3 from Connection #4 (County Water
Authority direct) and 1/3 from Connection #6.

In addition, the District is working with the City of San Diego
and the Helix Water District to obtain additional water supplies
on a short-term basis.  The City of San Diego owns the San
Vicente and El Capitan Reservoirs which store water for the City
of San Diego and SD County Water Authority (who contracts for
storage with several of its member agencies.)

The District could obtain this water through its existing inter-
tie with the Helix Water District.  The additional supplies would
be delivered to the Helix Water District either directly to the
R. M. bevy Plant or to the bake Jennings Reservoir.

Padre Dam Municipal Water District, the Helix Water District and
neighboring Otay Water District are discussing opportunities to
lease capacity in the San Vicente or El-Capitan Reservoirs.
These supplies would be used to meet an emergency water outage
for 10 days.

The San Diego County Water Authority has embarked on an Emergency
Storage Project which will provide 90,100 acre feet of regional
storage for the Authority's service area.  The final draft
environmental impact statement/report was released in November
1995.  This project would provide more flexibility for water
transfers and exchanges among member agencies of the Authority.
For additional details, please refer the 1995 Urban Water
Management Plan Update, San Diego County Water Authority.

State-wide water transfers have been planned as a partial
solu